Presentation is loading. Please wait.

Presentation is loading. Please wait.

CERN, 14 May 2012 8.5.3 Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120.

Similar presentations


Presentation on theme: "CERN, 14 May 2012 8.5.3 Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120."— Presentation transcript:

1 CERN, 14 May 2012 8.5.3 Italy D.Boscherini

2 Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120

3 AIDA 8.5.3 ItemSub-itemInstitute in chargeResponsibleComment Cosmic ray set-up Detector INFN-BO INFN-RM2 G.Aielli Front-end electronicsINFN-RM2R.Cardarelli Power-supplies + cables INFN-NA INRNE S.Buontempo LV -> INFN-NA HV -> INRNE Gas system INFN-BA INFN-LNF S.Bianco DCS INFN-BO INFN-RM2 A.Polini Readout electronics / DAQ??MPI contacted Beam monitor set-up Detector + mechanics + cablesWeizmannG.Mikenberg Front-end electronics Technion Weizmann S.Tarem Gas system Technion Weizmann G.Mikenberg DCSTechnionS.Tarem Readout electronics / DAQ Technion weizmann ? Tel-Aviv to be contacted DCS INFN-BO INFN-RM2 NTUA A.Polini DAQNTUA + ??Need manpower! Environmental sensors INFN-LNF INFN-NA S.Bianco Radiation sensors INFN-BA INRNE P.Iaydjiev

4 AIDA 8.5.3 ItemSub-itemInstitute in chargeResponsibleComment Cosmic ray set-up Detector INFN-BO INFN-RM2 G.Aielli Front-end electronicsINFN-RM2R.Cardarelli Power-supplies + cables INFN-NA INRNE S.Buontempo LV -> INFN-NA HV -> INRNE Gas system INFN-BA INFN-LNF S.Bianco DCS INFN-BO INFN-RM2 A.Polini Readout electronics / DAQ??MPI contacted DCS INFN-BO INFN-RM2 NTUA A.Polini DAQNTUA + ??Need manpower! Environmental sensors INFN-LNF INFN-NA S.Bianco Radiation sensors INFN-BA INRNE P.Iaydjiev INFN-BA: instantaneous rate? Items with INFN involvement


Download ppt "CERN, 14 May 2012 8.5.3 Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120."

Similar presentations


Ads by Google