MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.

Similar presentations


Presentation on theme: "MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3."— Presentation transcript:

1 MoA 2010 – RPC project G. Iaselli P. Paolucci

2 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3 Ghent - Belgium2 Uniandes2 Pakistan3 CERN0 TOTALE ENDCAP170,40 Bari8 LNF3 Napoli4 Pavia4 Sofia Univ4 Sofia INRE3 TOTALE BARREL260,60 TOTALE RPC 43

3 MoA 2010 schema for RPC project Run – 10 monthsshut-down 2 monthRun – 10 monthsshut-down 2 month FTE needed months Detector chamber 23206 electronics 0,524 services 1210449 Elect. & DAQ Power system 12104 DCS-DSS 11102 TTU 0102 XDAQ 0,5 5134 Software Raw Data/DQM 22204 Reconstructed 22204 Prompt Analysys-Run valid 22204 TTU 0,40,641,277,2 Operation P5 shift 31302 CAF shift 21202 Shift leader 1110266 Managment LV2 and LV3 21 42 Up Scope Simulation 0,3 30,6 R&D 0,6 61,2 Chamber production 22204 Front-end electronic 0,5 51 Trigger electronic 0,5 5146,8 TOTALE months22,32524471 315 (268)

4 Conclusions After the 2009 exercise we were able to improve our estimation and we increased the RPC MM from 208 to 268 (increase of 30%) + 47 (upgrade) RPC project FTE is 43, almost stable – But barrel is going down (2 Pavia PhD left + 3 Napoli/Bari without any position)