Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.

Slides:



Advertisements
Similar presentations
Medicaid Management Information System (MMIS) Replacement
Advertisements

EQUIPMENT VALIDATION.
[Federal Register: June 17, 2003 (Volume 68, Number 116)] [Rules and Regulations] [Page ]
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Safety Oversight for SLAC Accelerator Department Operations
Spring 2015 TELPAS Holistic Rating Training System
Regulatory Body MODIFIED Day 8 – Lecture 3.
Environmental Health and Safety Radiation Control and Radiological Services.
An Introduction to Mersen Electrical Services Putting electrical safety to work.
School of Engineering & Electronics Safety Presentation.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
1 Lawrence Berkeley National Laboratory Integrated Safety Management Systems Review August 8-9, 2006 B erkeley Lab Safety Committee Presentation Paul Blodgett.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
BUSINESS SENSITIVE 1 Copyright © 2009 by James E. Dvorsky, Battelle Medical Device Solutions Compliance Engineering Jim Dvorsky Battelle Medical Device.
From Research Prototype to Production
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
Smart solutions for comfort and safety UL/CSA approval of small motors.
Document Control Basics of Good Documentation and
Work-Specific Hazard Checklist (WSHC) May 20, 2013 Mark Berkheimer, CHMM ORAU EH&S Specialist 3/Chemical Hygiene Officer 1.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
What Documentation Needs to be Submitted With an Approval Application?
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
NASA Quality Leadership Forum: Supply Chain Management Case Study Ken Ortiz/Alphaport, Inc. net-inspect ™
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
ISM at the Savannah River Site
NRTLs, FEBs and the NEC What every electrical inspector needs to know about NRTLs, FEBs, listing, labeling and the NEC. Presented by ACES
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Engineering Documentation
Chicago Area Facilities (CAF) Electrical Safety Program.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Steve Griffith February 28th, 2017
Lock Out & Tag Out.
Installing DOT/ICC Exchange or Stationary Cylinders
EET 422 EMC & COMPLIANCE ENGINEERING
Boris Deriy, APS Electrical Safety Committee Chair
Standards and Certification Training
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Electrical Equipment Requirements for Purchase and Use on JMU Campus
LOTO(V) Procedures MESH Process Safety, 8.7 Energy Control
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Chemical Safety and Security Plan
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
DOE Review of the LCLS Project October 2006
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance

SBN What is Operational Readiness Clearance Electrical Equipment Approvals/CE mark Custom versus Commercial electrical equipment Guidance Sources Where to start 3 Step Process Electrical Equipment Highlight Summary Outline 2/8/16Linda Bagby | T600 Installation2

SBN Prior to operation, experiments, projects, and R&D (Research and Development) efforts may require an ES&H (Environment, Safety, and Health) review depending on the hazards or risks involved. The ES&H review may consist of multiple reviews by subject matter experts (SME’s) from a variety of committees depending upon the hazards involved. The ES&H review procedure is designed to review these projects and to ensure proper documentation and reviews have been conducted. The Operational Readiness Clearance (ORC) process is used to capture the recommendations, findings, and ultimate recommendation to operate from these various committees. w/ESH%20Management/ESH_Manual/PPD_ESH_006.pdf What is an Operational Readiness Clearance Review? 2/8/16Linda Bagby | T600 Installation3

SBN Per the Department of Energy’s prime directive to Fermilab, Fermilab is required to follow the National Electrical Codes (NEC) and Occupational Health and Safety Administration (OSHA) guidelines. OSHA requires all commercial equipment to be approved by the electrical Authority Having Jurisdiction (AHJ). The AHJ for Fermilab is David Mertz. Nationally Recognized Testing Laboratories list: Electrical Equipment Approvals 2/8/16Linda Bagby | T600 Installation4

SBN OSHA requires Nationally Recognized Testing Laboratories (NRTLs) to be independent from the manufacturer. The CE mark is a manufacturer’s self-certification, therefore, the mark does not meet OSHA requirements. Q&p_id=178https:// Q&p_id=178 For custom designs or CE marked equipment, there are 3 solutions: –Safety Engineering Design Review (SEDR). –Have vendor obtain a Nationally Recognized Testing Laboratory (NRTL) listing so the equipment bears a NRTL seal. –Have a Nationally Recognized Testing Laboratory (NRTL) representative perform a field inspection of the equipment on site. CE mark 2/8/16Linda Bagby | T600 Installation5

SBN Custom electrical equipment is defined as electronics that are not commercially available. –Printed circuit boards designed by anyone other than a commercial company (engineer, collaborator, physicist, post doc, grad student). –Chassis containing a collection of commercial parts with internal wiring completed by the user. –Modified commercial equipment. Extending a power cord. –Equipment that does not contain a Nationally Recognized Testing Laboratory (NRTL) seal. Commercial electrical equipment has a NRTL seal. Custom vs Commercial Electrical Equipment 2/8/16Linda Bagby | T600 Installation6

SBN All experiments within the Short Baseline Neutrino (SBN) program in Neutrino Division (ND) follow the Particle Physics Division (PPD) guidelines for Operational Readiness Clearance (ORC) reviews. Link to the Particle Physics Division Operational Readiness Clearance (PPD ORC) Link to the Fermilab Environment, Safety and Health Manual (FESHM) Guidance Sources 2/8/16Linda Bagby | T600 Installation7

SBN Use the PPD ORC page to determine the hazards for a given subsystem Hazards include: –Flammable (Gases or Liquids) –Gases –Chemicals –Radioactive Sources –Target Materials –Nuclear Materials –Class 3b or Class 4 Lasers –Electrical Equipment –Mechanical Structures –Vacuum Vessels –Pressure Vessels and Pressure Piping –Fire and Life Safety –Radiation Safety –Trip, Fall, and Strain relief considerations Where does one start?? 2/8/16Linda Bagby | T600 Installation8

SBN There are 2 ways to go about obtaining an Operational Readiness Clearance, the difficult way and the easy way. Difficult: Submit a review request after all equipment is installed. –Problems: For large experiments this plan is plagued with delays due to the time required to review equipment a committee member is seeing for the first time, turn around time of possible rework, availability of the reviewer. Easy: Follow a 3 step process throughout the duration of the project. –Problems: I haven’t found any yet. Modes of Attack 2/8/16Linda Bagby | T600 Installation9

SBN Safety Engineering Design Review (SEDR) Performed on custom designed or modified commercial equipment. Requirements (chassis level) –Simplified (block) electrical diagram of entire installation, including commercial components, with special emphasis on power handling issues. These must be of sufficient detail that reviewers can verify the experimenters have observed good systems engineering practices and have used proper fusing, wire sizes, insulation, termination, etc. –Line diagrams of custom manufactured circuitry or modifications of commercial components of similar detail. –Sample of the equipment to be reviewed. Should be done during the PRE-PRODUCTION phase of a design to allow time to complete any ‘required’ findings before going into production. 3 Step Process: Step 1 2/8/16Linda Bagby | T600 Installation10

SBN partial Operational Readiness Clearance (pORC) A mechanism for powering up one subsystem while others are being installed or assembled. Performed on a subsystem’s fully populated electronics racks or a subsystem’s collection of equipment which will be operated unattended or in a beamline enclosure. Includes all intra AND inter rack connections, including external AC Distribution. Requirements (rack or subsystem level) –Simplified (block) electrical diagram of entire installation, including commercial components, with special emphasis on power handling issues. These must be of sufficient detail that reviewers can verify the experimenters have observed good systems engineering practices and have used proper fusing, wire sizes, insulation, termination, etc. –Line diagrams of custom manufactured circuitry or modifications of commercial components of similar detail. –Fully populated rack. Can be done at experiment’s enclosure or other site before racks are moved to enclosure. 3 Step Process: Step 2 2/8/16Linda Bagby | T600 Installation11

SBN Final Operational Readiness Clearance Walkthrough (ORC) Documentation consists of a ‘wrapper’ around all of the subsystem partial Operational Readiness Clearance review findings and responses. This is a final walkthrough by safety to insure the installation is complete and ready to go. 3 Step Process: Step 3 2/8/16Linda Bagby | T600 Installation12

SBN On the Particle Physics Division Operational Readiness Clearance page, under Electrical Equipment, there are 2 main links to use as guidance. Electrical Equipment –Electrical Safety ORC Review TipsElectrical Safety ORC Review Tips –Electrical Design Standards for Electronics to be used in Experiments at FermilabElectrical Design Standards for Electronics to be used in Experiments at Fermilab –Necessary Documentation: Simplified (block) electrical diagram of entire installation, including commercial components, with special emphasis on power handling issues. These must be of sufficient detail that reviewers can verify the experimenters have observed good systems engineering practices and have used proper fusing, wire sizes, insulation, termination, etc. Line diagrams of custom manufactured circuitry or modifications of commercial components of similar detail. The Environment, Safety, and Health (ES&H) webpage has links to all Fermilab Environment, Safety, and Health Manual (FESHM) documents. FESHM 9000 Electrical Safety chapters. – Electrical Equipment Highlight 2/8/16Linda Bagby | T600 Installation13

SBN Defined Operational Readiness Clearance. Described Nationally Recognized Testing Agency seal for commercial equipment. Provided links to guidance for review preparation. Described a 3 step process to minimize the time it takes to complete the review. Highlighted requirements for Electrical Equipment. I am here to help and shepherd everyone’s effort in completing the reviews in a timely manner. Summary 2/8/16Linda Bagby | T600 Installation14