AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
ADC Performance and Calibration of MDT Chambers
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
9/11/2007JC Wang1 Track Resolution Scale, assume equal  meas for different planes. HP3 HP4 All 6 measurements. Without leftmost one. Without rightmost.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Preliminary Results of the Test Run at SLAC Petra Hüntemeyer.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Low Cost TDC Using FPGA Logic Cell Delay Jinyuan Wu, Z. Shi For CKM Collaboration Jan
AMS offline software progress report. E.Choumilov, AMS TIM
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
SLAC, HiRes T-461: “FLASH” part 1 Justin Findlay.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
Development of a pad interpolation algorithm using charge-sharing.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
AMS Software Review ACC Analysis Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
CM correction algorithm. Observations: Looking at the data for one analog link, a large fraction of the 32 strips are affected by the large signal deposit.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
CALORIMETER CELL MONITORING TOOL Viacheslav Shary.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Development of Multi-Pixel Photon Counters (1)
Work on Muon System TDR - in progress Word -> Latex ?
Analysis of LumiCal data from the 2010 testbeam
Electronics for Range System Prototype Tests
Beam detectors performance during the Au+Au runs in HADES
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
GRAPES-3: Status of ROOT Based Monitoring and Analysis
Jean-Sebastien Graulich, Geneva
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
Large CMS GEM with APV & SRS electronics
The IFR Online Detector Control at the BaBar experiment at SLAC
Status report Minjung Kim
The IFR Online Detector Control at the BaBar experiment at SLAC
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
B. Genolini for the IPNO detector dept.
Template application to detect KC-like activity.
Presentation transcript:

AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011

2 ACC DAQ Monitoring ACC Electronic Scheme:

3 ACC DAQ Monitoring History: Starting time: Cosmic Data Taking Period at CERN after AMS-02 Pre-Integration May 200 by Ph. v. Doetinchem, continued by A. Goerres to be continued by Ch. Chung + Th. Kirn

4 ACC DAQ Monitoring Block-Files Mean ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crate Number of TDC Hits for each of the 4 PMTs of S0, S1, S2 and S3 crate mean JLV1 trigger pattern for each AND/OR of PMTs corresponding to one set; SFEA board temperature sensors, Global DALLAS sensors on each PMT box Median ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crate

5 ACC DAQ Monitoring S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Black (SFEA2 input channel 0) Red (SFEA2 input channel 1) Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

6 ACC DAQ Monitoring S2 WAKE -Z Black (SFEA2 input channel 0) Red (SFEA2 input channel 1) Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

7 ACC DAQ Monitoring S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Black (SFEA2 input channel 0) Red (SFEA2 input channel 1) Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3) Mean ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crate Calculated out of 500 ADC values, not pedestal corrected

8 ACC DAQ Monitoring S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Black (SFEA2 input channel 0) Red (SFEA2 input channel 1) Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3) Median ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crate Median value range 700 – 1000, ADC value range 300 – 2000, Running value: ADC value above median → median increase by 0.5 ADC value below median → median decrease by 0.3

9 ACC DAQ Monitoring Raw Data: Stored time marks of discriminator transactions in TDC

10 ACC DAQ Monitoring TDC: Discriminator threshold for all channels set to 200

11 ACC DAQ Monitoring S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Black (SFEA2 input channel 0) Red (SFEA2 input channel 1) Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3) Mean number of TDC Hits, averaged over 1500 entries

12 ACC DAQ Monitoring JLV1-trigger: Percentage of events which get a veto-flag ADC values as a function of the corresponding JLV1 pattern events with JLV1 off pattern for certain PMT contribute ~10% at 500 ADC counts and ~0.1% at 1000 ADC counts at threshold 200

13 ACC DAQ Monitoring Temperature Sensors S-crates, Temperature Sensors on PMT-boxes Operational: -30°C … +45°C Non-Operational: -35°C … +50°C

KSC Cosmic Data Period → ACC Stability

15 - TRD-track for prediction of ACC-hit - only the center of panel is taken into account 2010 KSC Cosmic Data Period Wake Ram

KSC Cosmic Data Period ACC Signal MOP / 1000 events – Zoom.. Change of Trigger Conditions: “1 out of 4”

During ISS end to end test period all 16 PMTs are stable less than 2% level

Wake +Z Wake -Z RAM +Z RAM -Z 2010 KSC Cosmic Data Period ACC Stability