1 May 22, Y.Sugimoto Update of detector hall in mountain region.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Access Hall Study for Cryogenics High Energy Accelerator Research Organization KEK- LC Project Office Masanobu Miyahara 2 Nov
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
ILC Utility Design Study for Kitakami-site
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Civil Design for Tunnel Case Studies
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
CLIC Handling Engineering Update
Updated Design of Detector Hall
Introduction and Meeting Objectives
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
BDS Cryogenic System RDR Status and EDR Plans
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Summary Some Issues of Future Consideration
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Change Request Panel report
Cryogenic cavern in Asian site
Detector hall in mountain regions
Kitakami IR Access Discussions
8-10 April 2014 CFS-ADI Joint Meeting
Presentation transcript:

1 May 22, Y.Sugimoto Update of detector hall in mountain region

2 Sample site Exp-hall Access tunnel

3 Shape of cavern Study of 2 sample sites in Japan –Both sites have very good geology of granite –Depth of the cavern is less than 300m  Shape of the cavern can be bullet shape rather than egg shape

4 Access tunnel Location of solenoid construction –In the cavern  larger cavern (  L~40m?), smaller access tunnel –On surface  smaller cavern, larger access tunnel –Cost is similar for both cases, but on-surface assembly is more convenient and less risk  On-surface assembly with large (h=11m) access tunnel Access tunnel to 2 nd detector –It has to go underneath the BDS tunnel, and should not be so large –Smaller access tunnel for the 2 nd detector (SiD?) –Solenoid of the 2 nd detector should be carried through the larger access tunnel, and go through the area of the 1 st detector –What is the minimum size of the smaller access tunnel (input from SiD)? Helium compressor for solenoids –He compressors can be placed in the large access tunnel –Distance between the detector solenoid and the compressor < 200m (?) –KEK cryogenic group (Y.Makida et al.) has joined this study

5 Solenoid transport - 225t/5axles  450t with 2-trailers - Capable of ~7% slope

6 Solenoid transport Enough space for detector solenoids

7 Other issues Detector service caverns –What is the required size to enclose detector power supplies, cooling plants for the detectors, power supplies and refrigerators for solenoids, etc? Beam line height? –To be decided in this workshop Do we need service tunnel and survey tunnel for accelerator? Can we share the access tunnel for detectors with accelerator (DR, BDS)?

8 Earthquake Belle detector after 3.11 –Bell detector was rolled out from the beam line and fixed to the ground –32 fixing bolts (M22) have been broken by the earthquake, and Belle detector moved 6 cm on the rail How should platforms be supported on the occasion of big earthquake? –Move with the ground? –Isolated from the ground? Seismic isolation support for buildings

9 Earthquake Isolation from the ground can be achieved using air-pads, but –Enough gap between side wall is necessary –Positioning actuators should be retractable –Very flexible bellows should be placed between QD0 and QF1 to avoid damages to the inner detectors

10 Towards DBD Impact of 3.11 –Some collaborators of KEK who belong to facility group, cryogenic group, Acc. group are occupied with repairing works at KEK and JPARC –Hopefully, they will come back to ILC work by autumn In cooperation with the experts mentioned above, we will make designs necessary for the mountain site: –Underground cavern and the access tunnel –Detector solenoid/cryogenic system –Other utilities

11 backup

12 RDR