17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.

Slides:



Advertisements
Similar presentations
Boys & Girls Club of Burbank at Miller For Students From Miller, Emerson, and Jefferson The Boys & Girls Club of Burbank is offering Summer Day Camp at.
Advertisements

CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Prepositions of Time Rules for using in on at.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
FY2009 WEB-BASED BUDGET DEVELOPMENT PROCESS “A” FUNDS Developed and Presented by The Budget Office & eBusiness Solutions.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
Welcome to Lucas Elementary Kindergarten Class for
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL News –Market survey is close to the final state PS requirements for whole box Bricks specification.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
When is …? 1.tomorrow 2.yesterday 3.the day after tomorrow 4.next Friday 5.two weeks ago 6. three days ago 7. the day before yesterday 8. In four days.
7/2/2003Ivan Hruska,Francisca Calheiros1 Radiation test of components for LV power supply design  Test done in PSI verification and selection.
By: Eric Backman Advisor: Dr. Malinowski.  Introduction  Goals  Project Overview and Changes  Work Completed  Updated Schedule.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
1 Radiation worries in the cavern L.Jirdén
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
A group of hikers climbed from Salt Flats (elevation -55 feet) to Talon Bluff (elevation 620 feet). What is the difference in elevation between Talon Bluff.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
CMS LEWA LDE1/M500 CO 2 pumps N° N°
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
Software Architecture of a RadFET Dosimetry System Garth Brown: 20 May 2015.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
MICE Spectrometer Solenoids Step IV running
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
PSI test REPORT MARCH 2011 G. Spiezia, P. Peronnard (EN/STI/ECE)
DT Infrastructure: LV, HV, Gas
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
Maki KUROSAWA VTX Group 2014 Feb 20
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Friday Morning 7:30 injection for fill 2908
ABO CE No. 2 MR series & coating
Wednesday 26 October 2011.
Presentation transcript:

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran continually without trip off or other observable problems –Rectifier module was probably damaged by radiation after ~8.5 E 10 p /cm^2. Problem found in optocoupler which sends information about finishing of softstart sequence to MCU –MCU didn’t tested

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 2 Radiation test of PL500 in TCC2 Decision taken to make a test in TCC2 –no available test facility around up to the summer 2002 –closest date in available facility August 2002 in Louvain Test for TCC2 prepared during March and part of April –Test of MCU with improved SW & AC/DC converter with rad-tol optocoupler

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 3 Radiation test of PL500 in TCC2 Test setup –common setup for PL500 & TILECAL brick test –setup placed in shielded area ~ 25m from the test place - no acces during beam –control computer accessible - on-line & off-line data accessible through the web

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 4 Radiation test of PL500 in TCC2

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 5 Radiation test of PL500 in TCC2 Results –Installation ready and setup running since 27th April because of limited acces in next weeks –Beam started Thursday 23th May afternoon. –24th May. 5:44 morning –CAN BUS started to show wrong voltages but good currents, DVM values are OK. –TID ~ 0.6krad

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 6 Radiation test of PL500 in TCC2 –24th May, Friday morning ~ 10:14 Dropdown of +12V channel to 4.3V CAN shows decrease of current due to drop of voltage positions of values from CAN are swapped - 5V current in position of +12V and +12V current in position of 5V current voltages read by CAN are still wrong –24th May 15:40 we are loosing power meter data –25th May morning ~ 10:26 dropdown of all 3 channels to zero

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 7 Radiation test of PL500 in TCC2 –28th May revival of +12V and -12V channels back to the proper values by unknown reason CAN reads voltages OK and positions of current are also back 5V is dead. –29th May afternoon we did a power cycling of crate and all voltages are back CAN doesn't read +5V anyway the voltage is there by DVM power meter after its power recycling is back in function TID ~ 3.2krad

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 8 Radiation test of PL500 in TCC2 –30th of May ~ 21:00 all outputs are dead –3rd of June afternoon - exceptional access after power cycling voltages were back but only for 3 minutes –12th of June removal of PL500 from TCC2

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 9 Radiation test of PL500 in TCC2 Conclusion –PL500 didn’t survived more than 10 hours with radiation ~ 0.6krad –behavior has been worse and worse with increasing TID –CANbus steering and readout lost –Decisions taken to return crate to manufacturer for analysis stop the prepared test in PSI facility –Suggestions for next development sent to WIENER