Gas System Construction Status Oct. 2005 FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
André Augustinus 16 June 2003 DCS Workshop Safety.
19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
The RPC Closed loop Gas System Slides from Bianco and Guida.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
EN-CV interventions during YETS
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Update on Experimental Beampipe Progress Ray Veness For Beampipe project team in AT/VAC and TS/MME With special thanks to: S.Calatroni, W.Cameron, D.Duarte,
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Gas Schedules
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Current Status Future Progress Monitoring
Status of the cryogenic system for B180
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Presentation transcript:

Gas System Construction Status Oct FH

General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing = leak test and functional test of a module –Problems: Limited in manpower and facilities. A real bottleneck for the next 6 months

Distribution Modules ATLAS Distribution finished, testing still continued. –Some ageing problems with bad joints from A+P, which require modification. –Taken decision not to move the installation schedule, if an intervention is required it has to be done at the pit. Distribution Rack Construction of: –LHCb Muon construction ongoing, first deliveries end of Oct. OT: construction stopped bco. design change; ECR to come. RICH: construction nearly finished (2 racks) –ALICE: TOF (2 racks) ongoing. HMPID will start soon (1 rack; complicated) –ATLAS (ID-flushing): TRT barrel flushing: construction on-going (1 rack) CO2 and N2 flushing systems: construction on-going (2 racks)

Pre-Distribution Construction of CMS modules is starting this week as foreseen. (on critical path for CMS) LHCb pre-distribution will follow ( start not before next year) No big needs for ATLAS and ALICE.

Other Modules Mixer: construction finished, testing still pending for 5 racks. Pump Modules: Construction finished, changes to come for MDT, most of the testing to be done. Exhaust Module: Pipework mostly finished, Cabling and tests to be done. Humidifier: construction and cabling done, tests to be done.

Update on Targets from last Steering Meeting (June 2005)

Targets for next 6 Months (1) 1.Finnish all distribution units until end 0f Start Pre-Distribution by October 2005, so that we have chance to finish CMS part before April Deliver all gas racks + control chassis for: Mixer, Exhaust and Pump Modules to experimental sites. Construction and Setting up of Modules From Steering Meeting in June Good progress, but + 1 months is likely On schedule, work started this week On schedule.

Targets for next 12 months (2) ALICE: (Summer 2005) –Finnish TPC Installation –Connect Mixers in ALICE, install control racks in SG ATLAS: (Sept. 05 to April 06) –Install in SG (60-80%) –Install in US (60-80%) –Deliver all racks in UX (Pipe connections done by ATLAS and TS) –Install auxiliaries (valve islands, valve controllers, back-up systems, etc.) –Start commissioning of RPC system in April 2006 As of Beginning of 2006, increase manpower further and start working in CMS and LHCb. Installation on Experimental Sites From Steering Meeting in June Longer than expected, but steady progress. Finished by November Done. On-going, we do everything To maintain the schedule.