Spring 2013 Mid Presentation Technion Israel Institute of Technology Supervisors:Rolf Hilgendorf, Debby Cohen Consultant:Eli Shoshan Students:Etgar Israeli,

Slides:



Advertisements
Similar presentations
1 Helsinki University of Technology,Communications Laboratory, Timo O. Korhonen Data Communication, Lecture6 Digital Baseband Transmission.
Advertisements

Digital Coding of Analog Signal Prepared By: Amit Degada Teaching Assistant Electronics Engineering Department, Sardar Vallabhbhai National Institute of.
Fundamentals of Data & Signals (Part II) School of Business Eastern Illinois University © Abdou Illia, Spring 2015 (February18, 2015)
01/10/2013 Ebro Observatory, October 1st, 2013 New Technology involved in SWING: Software Radio and HF Links A.L. Saverino A.Capria, F.Berizzi, M. Martorella,
ECE 8443 – Pattern Recognition EE 3512 – Signals: Continuous and Discrete Objectives: Generalized Fourier Transform Analog Modulation Amplitude Modulation.
Sampling and quantization Seminary 2. Problem 2.1 Typical errors in reconstruction: Leaking and aliasing We have a transmission system with f s =8 kHz.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Top Level System Block Diagram BSS Block Diagram Abstract In today's expanding business environment, conference call technology has become an integral.
High Speed Digital Systems Lab Spring/Winter 2010 Midterm presentation Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an.
Characterization Presentation Spring 2006 Implementation of generic interface To electronic components via USB2 Connection Supervisor Daniel Alkalay System.
Digital Voice Communication Link EE 413 – TEAM 2 April 21 st, 2005.
Integrated Circuits Design for Applications in Communications Dr. Charles Surya Department of Electronic and Information Engineering DE636  6220
המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory הטכניון - מכון טכנולוגי לישראל הפקולטה להנדסת חשמל Technion - Israel institute of technology.
STARLight PDR 3 Oct ‘01H.1 Miller STARLight Sensor Signal Processing Ryan Miller STARLight Electrical Engineer (734)
High Speed Digital Systems Lab Spring/Winter 2010 Part A final presentation Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of.
Lecture 3 Data Encoding and Signal Modulation
Digital Signal Processing – Chapter 7
Chapter 4 Digital Transmission
1 Summary of SDR Analog radio systems are being replaced by digital radio systems for various radio applications. SDR technology aims to take advantage.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
BY MD YOUSUF IRFAN.  GLOBAL Positioning System (GPS) receivers for the consumer market require solutions that are compact, cheap, and low power.  This.
Group member: Zhaoxin Mamengduo Cfang Stanley The Implementation of Delta-Sigma Modulation in Digital-to-Analog Converter 1.
Sub-Nyquist Sampling DSP & SCD Modules Presented by: Omer Kiselov, Daniel Primor Supervised by: Ina Rivkin, Moshe Mishali Winter 2010High Speed Digital.
Sampling Theorem, frequency resolution & Aliasing The Sampling Theorem will be the single most important constraint you'll learn in computer-aided instrumentation.
EE513 Audio Signals and Systems Digital Signal Processing (Systems) Kevin D. Donohue Electrical and Computer Engineering University of Kentucky.
Lecture 1 Signals in the Time and Frequency Domains
Sub- Nyquist Sampling System Hardware Implementation System Architecture Group – Shai & Yaron Data Transfer, System Integration and Debug Environment Part.
DARPA Digital Audio Receiver, Processor and Amplifier Group Z James Cotton Bobak Nazer Ryan Verret.
Technion – Israel Institute of Technology Department of Electrical Engineering Winter 2009 Instructor Amit Berman Students Evgeny Hahamovich Yaakov Aharon.
Student: Vikas Agarwal Guide: Prof H S Jamadagni
Sub-Nyquist Reconstruction Final Presentation Winter 2010/2011 By: Yousef Badran Supervisors: Asaf Elron Ina Rivkin Technion Israel Institute of Technology.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
EE345S Real-Time Digital Signal Processing Lab Fall 2006 Lecture 16 Quadrature Amplitude Modulation (QAM) Receiver Prof. Brian L. Evans Dept. of Electrical.
111 Lecture 2 Signals and Systems (II) Principles of Communications Fall 2008 NCTU EE Tzu-Hsien Sang.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Performed by: Yaron Recher & Shai Maylat Supervisor: Mr. Rolf Hilgendorf המעבדה למערכות ספרתיות מהירות הטכניון - מכון טכנולוגי לישראל הפקולטה להנדסת חשמל.
Eli Baransky & Gal Itzhak. Basic Model The pulse shape is known (usually gaussian), if we limit ourselves to work In G(f)’s support, then we can calibrate.
CHAPTER 2 Amplitude Modulation 2-3 AM RECEIVERS. Introduction AM demodulation – reverse process of AM modulation. Demodulator: converts a received modulated-
Developing fast clock source with deterministic jitter Midterm review Yulia Okunev Supervisor -Yossi Hipsh HS-DSL Laboratory, Dept. of Electrical Engineering.
Sub-Nyquist Sampling Algorithm Implementation on Flex Rio
Final Presentation Final Presentation OFDM implementation and performance test Performed by: Tomer Ben Oz Ariel Shleifer Guided by: Mony Orbach Duration:
University of Kansas 2004 ITTC Summer Lecture Series Network Analyzer Operation John Paden.
Chapter 4 Digital Transmission. 4.#2 4-1 DIGITAL-TO-DIGITAL CONVERSION line coding, block coding, and scrambling. Line coding is always needed; block.
Asaf Barel Eli Ovits Supervisor: Debby Cohen June 2013 High speed digital systems laboratory Technion - Israel institute of technology department of Electrical.
Midterm Presentation Performed by: Ron Amit Supervisor: Tanya Chernyakova Semester: Spring Sub-Nyquist Sampling in Ultrasound Imaging.
Final Presentation Winter Barak Shaashua Barak Straussman Supervisor: Idan Shmuel.
EE445S Real-Time Digital Signal Processing Lab Spring 2014 Lecture 16 Quadrature Amplitude Modulation (QAM) Receiver Prof. Brian L. Evans Dept. of Electrical.
Sub-Nyquist Reconstruction Characterization Presentation Winter 2010/2011 By: Yousef Badran Supervisors: Asaf Elron Ina Rivkin Technion Israel Institute.
Presenters: Genady Paikin, Ariel Tsror. Supervisors : Inna Rivkin, Rolf Hilgendorf. High Speed Digital Systems Lab Yearly Project Part A.
By: Daniel Barsky, Natalie Pistunovich Supervisors: Rolf Hilgendorf, Ina Rivkin Characterization Sub Nyquist Implementation Optimization 11/04/2010.
Software Defined Radio PhD Program on Electrical Engineering Sampling Theory and Quantization José Vieira.
Digital Transceiver Implementation
1 5. Application Examples 5.1. Programmable compensation for analog circuits (Optimal tuning) 5.2. Programmable delays in high-speed digital circuits (Clock.
CHARACTERIZATION PRESENTATION Calibration of Characterization Matrix for Xampling System. Eden Weinberg, semester 8 Pavel Vilner, semester 8 Instructor:
Low Power, High-Throughput AD Converters
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Poster Winter Barak Shaashua Barak Straussman Supervisor: Idan Shmuel.
Low Power, High-Throughput AD Converters
1 What is Multimedia? Multimedia can have a many definitions Multimedia means that computer information can be represented through media types: – Text.
1 Digital processing applications for DE2 card High Speed Digital Systems Lab Winter 2008/09  Instructor: Mony Orbach  Students : Avner Reisz, Natty.
NOISE MEASUREMENTS ON CLICPIX AND FUTURE DEVELOPMENTS Pierpaolo Valerio.
Low Power, High-Throughput AD Converters
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Dr. Clincy Professor of CS
Topics discussed in this section:
Digital Acquisition of Analog Signals – A Practical Guide
Uniform Linear Array based Spectrum Sensing from sub-Nyquist Samples
Lab 6 Part II Instructions
Presentation transcript:

Spring 2013 Mid Presentation Technion Israel Institute of Technology Supervisors:Rolf Hilgendorf, Debby Cohen Consultant:Eli Shoshan Students:Etgar Israeli, Shahar Tsiper

 Theory Theory  Project Definition and Goals Project Definition and Goals  Project Main Stages: Project Main Stages: ◦ Matlab Reconstruction Matlab Reconstruction ◦ AWR Activities – Part A AWR Activities – Part A ◦ AWR Activities – Part B AWR Activities – Part B ◦ A-Matrix Calibration A-Matrix Calibration ◦ MWC Development Support Systems MWC Development Support Systems  Epilogue Epilogue

 Multiband model: N – max number of transmissions B – max bandwidth of each transmission  Goal: Blind detection + Recovery  Minimal achievable rate: 2NB << f NYQ ~~ ~~

Expander Δ

Support S recovery Signal reconstruction ~~ ~~

Support Recovery Reconstructor ~~ ~~ ~~ ~~

 In theory there is a solid algorithm for building the A-Matrix. We use the fourier coefficients of the mixing series:  We’re interested in finding the coeff. Therefore we’ll use:  We can further simplify if the mixing series are step functions:

 We can now define an all constant A-Matrix:  We can now use the same A matrix in time domain. Due to the invariance for iDTFT.

 After the Support Recovery process:  Using Moore-Penrose psuedo-inverse process for the matrix:  Solving the problem:

 Matlab reconstruction algorithm  AWR Activities  A-matrix Calibration  MWC development support systems (Labview programming Rolf/Idan)

 Understanding and fixing the Matlab code  Learning AWR tool and Modeling MWC  Deeper understanding of the main issues the system suffers from  Developing calibration solutions for the system  Implementing the solutions on the actual system

◦ Matlab Reconstruction ◦ AWR Activities – Part A ◦ AWR Activities – Part B ◦ A-Matrix Calibration ◦ MWC Development Support Systems

ParameterValue Signal“qpsk” N6 q5 B19.5 Mhz fp19.8 Mhz fnyq5 Ghz SupRecSuccess

 Amplitudes normalized  Sinc signal used to demonstrate in time domain for visibility ParameterValue Signal“sinc” N6 q5 B19.5 Mhz fp19.8 Mhz fnyq5 Ghz SupRecSuccess

1. Step 1: measuring the delay between Input/Output signals using xcorrelation (upper Graph). 2. Step 2: Realigning the signals in time- domain. 3. Step 3: Insuring the signals are aligned (lower graph)

* Quadrature Phase Shift Keying

 Understand schematics of analog part of new MWCschematics  Get understanding of AWR tool  Define method for input and output files ◦ Matlab, CSV etc.  Enter first draft of MWC schematic

 Refine MWC design ◦ Get final spice models for all components ◦ Get model of card ◦ Enter final schematic ◦ Ensure synchronization between patterns ◦ Ensure synchronization with trigger ◦ How to create the input scenarios (AWR or matlab) ◦ Sampling rate for AWR simulation and for output  Basic Verification of output data using matlab ◦ Is input mapped to output as expected ◦ Limits for input signal (saturation, undetectable due to noise) ◦ Anti-aliasing filter response

 Understanding the Physical Issues  Using the AWR model output define A- Matrix ◦ Perform developed procedure using model and matlab only ◦ Perform procedure using MWC development systems described below

 Phase Shifts inside the system: ◦ Signals enter with unknown phase into the analog card. We should make sure we know how to recover the signals with their original phases. ◦ Analog Low-Pass Filter causes unknown phase shifts between the different channels. ◦ Fixed phase shift between the mixer channels and the Expander Unit.  Noise Sources: ◦ Impedance mismatches in the input cable end – attenuator is used, and acts as a noise source. ◦ Analog splitter before entering the different mixers provide as a noise source. ◦ Analog Low-Pass Filter causes noise.

 Modeling each part of the system independently, according to schematic  Trying to develop specific solutions to each of the micro-problems

Expander Δ ATT Unknown phase Splitter Noise Attenuator Noise LPF – Noise & phase shift Phase shift Unknown ?

 Thinking on new calibration methods after examining a full analog model or real MWC System - Still work in progress  Synchronizing the A matrix’s via cyclic shifts to the mixer series - Might be necessary

 Data acquisition using NI converter with external sampling clock  Immediate system based on Tabor AWG ◦ Load data from AWR simulation  Final development system using NI AWG ◦ NI sync card and external clocking

 Matlab: ◦ Used for full modeling of the MWC system – Already given – need to be fixed ◦ Calibration Methods  AWR: ◦ Implementing an analog model of the entire MWC system. ◦ Linking the analog AWR frontend and the digital Matlab backend  Labview: ◦ Implementing calibration procedure

Main missions week1 2/6week2 9/6week3 16/6week4 23/6week5 30/6week6 7/7week7 14/7 Fix Matlab reconstruction algorithm Understanding the existing Matlab code and Sub-Nyquist Radar AWR Becoming proficient in AWR environment Understand schematics of analog part of new MWC Define method for the input and output betweem AWR amd Matlab Enter first draft of MWC schematic Entering second stage of project: Refine MWC design

Spring 2013 Mid Presentation Supervisors: Rolf Hilgendorf, Debby Cohen Students: Etgar Israeli, Shahar Tsiper Technion Israel Institute of Technology