INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.

Slides:



Advertisements
Similar presentations
Pour personnaliser « nom événement et auteur » : « Insertion / En-tête et pied de page » Personnaliser la zone de de pied de page Cliquer sur appliquer.
Advertisements

25 TH SEPTEMBER 2012 ADAS workshop | Didier VEZINET | PAGE 1 CEA | 10 AVRIL 2012 FAST NI AND FE DENSITY ESTIMATION USING SOFT XRAY MEASUREMENTS IN TORE.
Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Pour insérer une image : Menu « Insertion / Image » ou Cliquer sur l’icône de la zone image Pour personnaliser « nom événement et auteur » : « Insertion.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP THERMO-MECHANICAL SIMULATIONS FOR THE MM WEDGES (TDR OPTIONS – SCREWED QUADRUPLETS) of June 2013 Patrick.
Irfu.cea.fr ATLAS-NSW SACLAY MMM WORKSHOP SIMULATIONS OF THE MM WEDGES WITH THE LAYOUT OPTION #3B of April 2013 Patrick PONSOT & Patrick GRAFFIN.
ADVANCED SIMULATION OF ULTRASONIC INSPECTION OF WELDS USING DYNAMIC RAY TRACING Audrey GARDAHAUT (1), Karim JEZZINE (1), Didier CASSEREAU (2), Nicolas.
SAISINUC SOFTWARE ENVIRONMENT Data tools: import, check, export, use DDEP , October 8-10 Marie-Martine Bé, Charlène Bisch, Christophe Dulieu, Mark.
SOCOTEC Group Overview Pour personnaliser la date : Affichage / En-tête et pied de page Personnaliser la zone date Cliquer sur appliquer partout May 2013.
ENDORSING RADIATION PROTECTION IN ACADEMIA AND UNIVERSITY HOSPITALS, THE INTERNATIONAL STANDARDS Egypte workshop | Akli HAMMADI | PAGE 1 CEA | 10 AVRIL.
13 DECEMBRE 2012 | PAGE 1 Clays In Natural And Engineered Barriers For Radioactive Waste Confinement - march 23-25, octobre 2015 | PAGE 1 CEA |
Irfu.cea.fr ATLAS-NSW CERN MMM WORKSHOP MM WEDGES MADE OF 4 MODULES of February 2013 Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas,
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
DEVELOPMENT OF BETA SPECTROMETRY USING CRYOGENIC DETECTORS M. Loidl, C. Le-Bret, M. Rodrigues, X. Mougeot CEA Saclay – LIST / LNE, Laboratoire National.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Manufacturing contracts for RFQ
PRELIMINARY VERSION ESS RFQ CDR 2 TIME SCHEDULE, PROJECT RISKS, RAMI AND SAFETY Anne-Catherine CHAUVEAU8th and 9th december 2015.
October 1st 2015 Alexis Fouché 1, Florian Noyrit 1, Sébastien Gérard 1, Maged Elaasar 2 SYSTEMATIC GENERATION OF STANDARD COMPLIANT TOOL SUPPORT OF DIAGRAMMATIC.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
RISK REGISTER Management & Engineering
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
Bruyères-le-Châtel, 8 décembre 2015
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.
H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER.
“DOING BUSINESS IN THE USA“ MARKÉTA STARÁ SME Business Developer for Czech Republic and Slovakia.
The Capability Approach as an Evaluation Framework for ICT for Older Adults ENTRANCE | Margarita Anastassova, Sabrina Paneëls, Verena Fuchsberger, Christiane.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
WP High Beta Cavities Delivery
Status of the M-ECCTD F. Peauger - P. Bosland
Cryomodule test stand at ESS site
ESS cavity procurement via in-kind contributions
Medium beta cryomodule demonstrator M-ECCTD
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
Documentation (XFEL Naming convention, uploading…)
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
UK RFD Pre-Series cryomodule
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
MID: A MetaCASE Tool for a Better Reuse of Visual Notations
COSI Evaluation of non-nuclear material balance with the COSI software
Installation Binder / IRR – an example
F. Peauger (mainly for CM components)
Licensing requirements for Cryomodules
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Quality assurance and Quality control organisation
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES

TABLE OF CONTENTS Chapter 01: objectives and constraints (WHY?) Chapter 02: tasks with associated goals (WHAT?) Chapter 03: Management process (HOW?) Chapter 04: Organisation (people) (WHO?) Chapter 05: tasks planning (WHEN?) | PAGE 2CEA Saclay/ESSI Project| 8 Feb16 Pour personnaliser le pied de page et la date : « Insertion / En-tête et pied de page » Personnaliser la zone de de pied de page Cliquer sur appliquer partout

CEA Saclay/ESSI Project| 8 Feb16 OBJECTIVES AND CONSTRAINTS Definition of the external interfaces Technical interfaces: limit of the responsibility Functional interfaces: integration success and global performances achievement Definition of the internal interfaces Elliptical cavity interfaces PBS Unavoidable contraints International collaboration: multilabs contributions (ESS, CEA, IPNO, LASA, STFC) for interdependant components required to be very formal Complex technical system Multi-site ESS Specific requirements in terms of massive COTS procurements (pumps, valves…) | PAGE 3

CEA Saclay/ESSI Project| 8 Feb16 TASKS AND ASSOCIATED GOALS Mid-Beta Elliptical Cavities CEA to provide to ESS for LASA interface drawings to be approved by ESS High-Beta Elliptical Cavities CEA to provide to ESS for STFC interface drawings to be validated by ESS Vacuum interfaces: definition under ESS responsibility Standardization of gaskets? Standardization of type of valves? Standardization of type of pumping system equipment? He cryogenic interfaces Lessons learnt from demonstrators for design simplification? (flexible parts, number of weldings vs complex geometry…) RF line interfaces Handling and Accelerator building interfaces Alignment interfaces Electrical interfaces Test stand interfaces | PAGE 4 No interface with Control System

CEA Saclay/ESSI Project| 8 Feb16 INTERFACE MANAGEMENT PROCESS | PAGE 5 definition Technical meetings Workshop with ESS partners? Preliminary configuration baseline verification Digital Mock-up drawings lessons learnt from demonstrators Tests measurement results validation Interfaces review chaired by ESS Initial Configuration to be approved by all partners for configuration management

CEA Saclay/ESSI Project| 8 Feb16 CONTACT PERSONS | PAGE 6

CEA Saclay/ESSI Project| 8 Feb16 INTERFACE DESCRIPTION FILE | PAGE 7

CEA Saclay/ESSI Project| 8 Feb16 INTERFACE DESCRIPTION FILE | PAGE 8

CEA Saclay/ESSI Project| 8 Feb16 PLANNING | PAGE 9 definition: 1st meeting with ESS and CEA on 2016, Feb, 8th

DSM Irfu Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | Gif-sur-Yvette Cedex T. +33 (0) xx xx | F. +33 (0) Etablissement public à caractère industriel et commercial | RCS Paris B | PAGE 10 CEA Saclay/ESSI Project| 8 Feb16 Thank you for your attention! QUESTIONS?