FORMS 1-13 CDBG APPLICATION Brent Allen & Gabriel Morris  December 2, 2015.

Slides:



Advertisements
Similar presentations
National manuals Hanna Tolonen EGHI subgroup on HES, 2 nd March 2011, Luxembourg.
Advertisements

1 January 18, 2000 NANPA Report to the NANC Prepared by: NeuStar January 18, 2000.
SiteManager Materials Division Auditor Meeting January 26, 2007.
Program design overview Pre-contract to post-program year Office on Volunteerism and Community Service.
The HESES12 process London 20 September 2012 Corinna Chandler.
Instructions for Completion. Review – Cover Page, Assurances and Certifications and Important Information Summary of Allocation – MDE completes for the.
Office of Program Development and Funding Electronic Grants Management System Tutorial #6: Using eSignatures.
CONFLICT OF INTEREST PROHIBITION Michael Casper, Compliance Manager  September 4, 2014.
2011 CDBG Applicants’ Workshop Important Reminders for 2011.
2010 DCA CDBG Applicants’ Workshop New for 2010 & Important Reminders.
What’s New for 2015 & Reminders Steed Robinson  December 2014.
2011 CDBG Recipients’ Workshop CONFLICT OF INTEREST PROHIBITION.
2013 CDBG Applicants’ Workshop 2013 Applicants’ Workshop CDBG COMPLIANCE LITE.
Navigating the RACE CARS Website Lisa Monk MSN, RN, CPHQ 1/29/13.
AB 86: Adult Education Grant Extension Technical Assistance Webinar Webinar
3 CDBG Workshop Tuesday, November 26, Planning Grants $1.3 million available Awarded monthly 1 Original and 1 Copy Letters of Intent Projects/applications.
SURVIVING A MONITORING VISIT Mary Alice Applegate, Field Representative  September 4, 2014.
2009 CDBG/CHIP Recipients’ Workshop Welcome to the COMPLIANCE SESSION ENVIRONMENTAL REQUIREMENTS Afternoon session will cover new CHIP FEDERAL LABOR STANDARDS.
Beginning the Adventure of Your Thesis or Project
2014 CDBG Applicants' Workshop Documenting the National Objective.
Title Page, Process Paper, and Annotated Bibliography Rules Checkpoint #3.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
2014 CDBG Applicants' Workshop Section 3 Overview (see also DCA Policy– Appendix R)
2008 ENVIRONMENTAL WORKSHOP. General Review of 2007 Competitive Round Issues 32 funded deals Brownfield deals Historic preservations deals Noise Wetlands.
2011 CDBG Recipients’ Workshop What’s New? Keeping current with the changing landscape.
2014 CDBG Applicants' Workshop Fair Housing/Equal Opportunity.
MURK Presented By Awni Alsous, MURK Engineer 2010.
2009 CDBG/CHIP Recipients’ Workshop Stimulus General & Special Conditions.
CDBG Online Quarterly Reporting Robert Shaw  9/4/2014.
CDBG Online Quarterly Reporting Robert Shaw  9/10/2015.
Word Lesson 13 Sharing Documents Microsoft Office 2010 Advanced Cable / Morrison 1.
2014 CDBG Applicants' Workshop Gaining a Competitive Advantage.
Procurement Division Procurement Reform Recommendation #19  “DGS shall authorize individual signature authority for contracting and procurement officials.
2013 CDBG Applicants’ Workshop Annual Competition Leverage and Bonus Points.
Methods of Documenting Need and Proposed Solutions 2015 CDBG Applicants’ Workshop December 3-5, 2014.
The Lifecycle of Grants: Grant Agreement and Fair Housing November 7, 2012.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
Fair Housing/Equal Opportunity Steed Robinson, Office of Community Development  September 10, 2015.
2013 CDBG Recipients' Workshop Affirmatively Furthering Fair Housing.
Methods for Documenting National Objective Compliance Michael Casper, Compliance Manager  December 3, 2014.
QUALITY. QUALIDOC Web site: Telephone: 44+ (0) JEAN WHITE.
5 Year Grant Close Out Report Process and Guidelines.
Casey Moore, CDBG Field Services Representative September 10, 2015 Surviving a Monitoring Visit.
2013 CDBG Recipients' Workshop Fair Housing/Equal Opportunity.
2013 CDBG Recipients' Workshop CONFLICT OF INTEREST PROHIBITION.
2008 CDBG/CHIP Recipients’ Workshop CONFLICT OF INTEREST PROHIBITION.
Gaining a Competitive Advantage Cindy Alligood, Pam Truitt, Mary Alice Applegate  December 3, 2014.
2009 DCA CDBG/CHIP Applicants’ Workshop 2009 Applicants’ Workshop CDBG COMPLIANCE.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
GRANT AMENDMENTS Processes and Procedures Robert Compton- Field Services Representative  9/10/2015.
CDBG Compliance Lite Michael Casper and Pam Truitt December 2, 2015.
Objectives At the end of this unit, you should be able to:
3rd Annual APHIS Agreements Meeting The 2006 Transparency Act April 8, 2009 Gina Jowers, FSRB, FMD
Methods of Documenting Need and Proposed Solutions 2016 CDBG Applicants’ Workshop December 2-4, 2015.
2013 CDBG Recipients' Workshop CDBG Labor Standards.
2013 CDBG Recipients' Workshop CDBG Online Quarterly Reporting.
2011 CDBG Applicants’ Workshop Rating and Selection: How the panels score Feasibility, Strategy, Impact, and Bonus Points.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction California Department of Education 21st Century Community.
2010 DCA CDBG Applicants’ Workshop 2010 Applicants’ Workshop CDBG COMPLIANCE.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Community Finance Division FORMS 1-13 CDBG APPLICATION.
Children System of Care Application Process for Behavioral Assistance & Intensive In-Community Department of Children and Families, Children’s System.
Every year the Redlands Community Scholarship Foundation along with other donors provide over 100 scholarships, ranging from $200 to $7,000 to graduating.
WEB 237 Week 1 DQ 2 What is the current markup language standard? Describe how CSS can be leveraged in website programming Check this A+ tutorial guideline.
Using Surveys to Document LMI Area Benefit
Unit 1 The Web Book Test.
30th November 2007 Beverley Grubb SGN
Form I-9 Mistakes Big or Small…. Avoid them All!!
Presentation transcript:

FORMS 1-13 CDBG APPLICATION Brent Allen & Gabriel Morris  December 2, 2015

CDBG Forms 1-13 are found at the DCA web site: G/programs/CDBGRegular.asp#cdbgapp forms Instructions for completing forms are found in the manual on pages

To find Census Tract(s) and Block Group(s)  

Use DCA’s Acceptable Survey Methodology publication (Appendix C) for guidance in describing methodology. Also, see instructions for DCA 6 Provide copy of actual survey form used.

Document all funding commitments. See section in manual on “Leverage of Additional Resources.”

There are 4 pages of Form 9a, the Georgia Historic Preservation Division Environmental Review form.

There are four pages of Form 10, Certified Assurances. Signature of authorized representative on p. 4.

There are four pages of Form 13, Disclosure Report. Follow directions for pages requiring signature of authorized representative.

Additional Forms are needed with the application: 1.SAMS Registration/DUNs # 2.Civil Rights Certification (put N/A on line for Grant #)  Note: The Environmental Forms now have fields that you can type in. Check out website.