National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

Rudolf Frauendorfer Asian Development Bank
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
1 University of Economics of Prague Western Bohemian University, Pilsen Actual challenges of implementation of PPP projects in Czech republic Zuzana Khendriche.
THE STRATEGIC APPROACH IN MODERNIZING MUNICIPAL SERVICES Siegfried Brenke, Team Leader GTZ Project: Modernization of Municipal Services Takovska 9/14,
COUNTRY REFORMS ON LEGAL, INSTITUTIONAL AND TECHNICAL ISSUES IN CROATIA OGNJEN BONACCI Faculty of Civil Engineering and Architecture, University of Split,
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
Cost of Municipal Services : ‘Best practice’ benchmarking of operating costs.
WATER REGULATORY AUTORITY OF ALBANIA ARJAN JOVANI, VICE – CHAIR OF NATIONAL COMMISSION OF W.R.A FLORENCE, 28 NOVEMBER 2013 OVERVIEW ON ALBANIAN WATER SECTOR.
UWWT directive in Croatia – implementation and data availability
PPP’s IN NIGERIA: Prospects in the Water Sector
Progress on developing, preparing and financing environmental investment projects REPUBLIC OF MACEDONIA.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
Romanian Association of Solid Waste Management (A.R.S.) Private Competition: How to achieve fair competition in the waste management sector? A short overview.
„Extension and modernization of water and wastewater infrastructure in Arad County”
NATO/CCMS Pilot Study Meeting on Prevention and Remediation in Selected Industrial Sectors: Mega-Sites, Ottawa, Canada 12-16, June 2005 The State of Remediation.
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
America’s Water Upmanu Lall water.columbia.edu.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen September.
Ministarstvo finansija Vlada Republike Srbije Instrument za pretpristupnu pomoć Instrument for Pre-Accession Assistance – IPA
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Romania – National Regulatory Authority for Municipal Services.
Member of: Austrian Showcase Sarajevo
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Vienna, May 2014 National Agency for Energy Regulation of Moldova (ANRE)
The implemented reforms and progress on developing a strategy for the WSS sector in Armenia The implemented reforms and progress on developing a strategy.
14/10/2015European Agency for Reconstruction1 Water & environment.
1 REFORM ALBANIA WATER SUPPLY AND SEWAGE SECTOR AFTER, THE TRANSFER PROCESS OF WATER SUPPLY AND SEWERAGE COMPANIES TO LOCAL GOVERNMENT AUTHORITIES. Enkelejda.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Priority Environmental Investment Programme (PEIP) – CARDS Regional Regional Meeting for Senior Officials from SEE and Donors’ Community 19-20th June,
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
Ministry of Transport and Communications of the Republic of Lithuania 1 Dr. Vytautas Krasauskas Head of Post and Telecommunication Division Ministry of.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Financial assistance to environment - outside the EU Brussels, 28 th May 2009 World Bank event Joanna Fiedler European Commission DG Environment.
ANA AGÊNCIA NACIONAL DE ÁGUAS SESSION 5 - WATER GOVERNANCE IN BRAZIL Gisela Forattini Voorburg, the Netherlands May 2006 USER-PRODUCER CONFERENCE:
Water Supply and Sanitation in Sub-Saharan Africa Activities, Strategies and Lessons Learned of German Development Cooperation.
Priority Environmental Investment Programme (PEIP) – CARDS Regional Regional Meeting for Senior Officials from SEE and Donors’ Community 19-20th June Budva,
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
Integrated Water Management Valentina Pryazhinskaya Water Problems Institute of the Russian Academy of Sciences Problems and Challenges: Conflicting interests.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
« Performing Efficient Models of Administration Capacity and Regional Reform in the European Union» European Parliament 15 October 2008 Bruxelles Romanian.
Resource and Waste Management in ALBANIA Ministry of Environmental, Forestry and Water Administration & Institute.
The Reforms In The WSS Sector In Bulgaria Eng. Ivan Ivanov President Bulgarian Water Association.
The Priority Environmental Investment Programme for South Eastern Europe – PEIP National Workshop Developing Environmental Infrastructure Projects in the.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
Promotion of Biogas Production and Development in Latvia Astrida Celmina Ministry of the Environment Republic of Latvia.
Seminar “American Expertise and technology for the water and wastewater sector” 11 April 2011 Business Opportunities in the Romanian water and wastewater.
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
Fecal Sludge Management in Indonesia February, 2016.
11 th REReP Task Force Meeting 20th November, Budva, Montenegro Priority Environmental Investment Programme (PEIP). Progress in Environmental Investments.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Landfilling in Ukraine – current state of problems by Michael Hoffmann 1) and Valeriy Mikhaylenko 2) 1) Institute of Water Problems and Land Reclamation,
Country Presentation SRI LANKA
1 Financing in water sector - times of change Antti Tooming Ministry of the Environment / Water department, Head of Project bureau 19/05/2016.
MINISTRY OF ENVIRONMENTAL PROTECTION AND REGIONAL DEVELOPMENT OF THE REPUBLIC OF LATVIA 1 ENVIRONMENTAL ISSUES – PROGRESS IN WATER, WASTE WATER AND WASTE.
Energy and Water Regulatory Commission (EWRC)
Water Charge Instruments for Environmental Management in Latin America: from Theoretical to Practical Issues Mexico Country Case Lilian SAADE HAZIN and.
Д-р Роланд A. Брэдшоу степени MBA, MSc, CEng, MICE
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Instrument za pretpristupnu pomoć
WATER UTILITY REFORM PLAN
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe

Starting point Legal approximation with the EU environmental acquis is ongoing Enforcement of legislation is not yet adequate Administrative capacity for planning and managing investments in the environment is weak at both national and local levels Regional development starts with the establishment of the new regional institutional structure (8 regions)

Water issues New legislation is to be completed Transfer of competences to the Ministry of Environment and Physical Planning is ongoing Municipal utilities provide water supply and wastewater disposal services; tariff setting lies with municipal councils; operations are not always cost recovery and customer satisfaction's driven Reform of communal services is pending Private Public Partnerships are regarded possible / preferable for the wastewater disposal services only

Water supply Connection rate % in urban and % in rural municipalities Underinvestment in water supply systems in urban areas (34 in total) lead to deterioration of networks generating significant losses There are still rural settlements (in every single municipality) without water supply in place

Wastewater collection and disposal Connection rate in urban areas 70-90% and 60-80% in rural settlements Underinvestment in maintenance Low connection rate to WWTPs (6%) Lack of appropriate discharge standards

Wastewater collection and disposal

NEIS recommendations Water supply is regarded as highest priority Wastewater treatment must follow the construction of sewerage Priority lists developed Funds required estimated and set into overall financing plan Prioritization criteria not widely accepted

Priority Lists water supply

Priority Lists (wastewater)

Waste issues Legal framework and policy documents in place Enforcement is relatively weak Municipal utilities provide the service; tariffs approved by municipal councils; operations are not always cost recovery and customer satisfaction's driven Reform of communal services is pending Private Public Partnerships are regarded possible / preferable for the waste disposal services and long distance (regional) transport

Waste issues Served population rages from % in urban and 10-50% in rural municipalities 54 municipal dumpsites need to be closed and remediated 6-7 regional landfills need to be engineered and constructed Regional logistics need to be furnished Human resources need to be strengthened

NEIS Recommendations Benchmarking system to foster regionalization Harmonization of tariffs at regional level Institutionalization of regional systems Quality Management for contracting and possible PPP Maximized use of IPA