Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

Today’s report LIU Qian. We made labels for each fiber. The labels show the PMT’s number corresponding to the fiber. This lable means: east side # inside.
S2 Glass Insulation Hexcel Corporation S2 Fiberglass Cloth #4522 with F81 Silane Finish. 30” (0.762 m) wide roll, 125 yards long (114.3 m),.0051” (0.130.
100[ch] 0.28[ps/ch] 200[ch] 0.54[ps/ch] TDC-calibration.
FToF Design and Overview Report CLAS12 ToF System Review Requirement and result driven design, construction, quality assurance, man power, time.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
No Electronics At School! Who Broke The Rule? Gel Electrophoresis
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
> >
TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
Recent results Marc & Qian. Outline 3D uniformity scan End cap TOF counter test result Report of moving laser box.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
TOF Monitor System Status F. Harris U. of Hawaii June 13, 2006.
Multiplying Binomials The FOIL Method. FOIL: What does it mean? F: First O: Outer I: Inner L: Last EXAMPLE: Multiply (x + 3)(x + 2) F: x * x = x 2 I:
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
Plastic scintillators for the g-RISING experiments Nami Saito.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Cable for UPAMD Steve Sedio Foxconn 7/19/2011. Requirements: Power, 25 milliohms max – AWG selected by worst case resistance and operation at 50C Signal.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
By Fernando Rey Product name:. Problem. Finish with your PS3 mess games¡ Boing presets PS3 tool box, naw you will have your games, cables and any accesories.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
 LYCCA : Lund-York-Cologne-Calorimeter shall be placed at the end of Super-FRS at FAIR as part of HISPEC campaign.  Based on CATE calorimeter used for.
The Lead Glass Detector Overview, Experience and Direction.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Construction of RHIC-STAR TOF and high rating MRPC Wang Yi Department of Engineering Physics, Tsinghua University Beijing,100084, China.
The UNH SVT Testing Facility: Status and Progress
The progress of TOF June 13, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Luminosity Monitor Status
LumiCal mechanical design, integration with LDC and laser alignment
How the Journal Works Decide on a daily check-in time
Integration issues at IHEP
Conceptual design of TOF and beam test results
STAR TOF MRPC Mass Production & Q.C. (USTC)
TOF Clock Distribution
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
Neutron Beam Test for Measuring Quenching Factor of CsI(Tl) Crystal
TOF & BB FEE Safety Review
Inventory of supplies: Inventory of supplies:
Presentation transcript:

Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)

First we checked the fiber to be sure it’s clean.

Next, we inserted the fiber into the special tool made by IHEP.

Inserting the fiber into the inner layer is challenging, but we know how to do it now.

Fibers from the inner layer come out to the outer layer and become paired. These paired fibers will then get married to the thick differential PMT cables.

When we came back to the TOF lab from the detector hall, the two USTC students, Steve and Jeff, let us to know that the time resolution of the laser signal is 20 ps without performing any calibration. The DAQ is working great. This was really exciting way to end our working day today!!!!!!