Environmental Protection Commission of Hillsborough County Extending Piney Point Emergency Permit November 3, 2003.

Slides:



Advertisements
Similar presentations
Wastewater Lagoon Cleanout How do they do that? Why is it important?
Advertisements

The Process Water Problem Florida Institute of Phosphate Research.
Indiana Department of Environmental Management
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Quantification of Spill Data from Domestic Facilities Andy Squires Pinellas County Environmental Management Keith Hackett Janicki Environmental, Inc.
Mona Dougherty, PE Senior Water Resource Control Engineer Wastewater and Storm Water Programs North Coast Regional Water Quality Control Board September.
Lake County Water Authority Nutrient Reduction Facility (NuRF) Lance Lumbard Water Resources Project Manager.
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting August 22, 2013.
ENTITY and DATE HERE Tampa Bay Nitrogen Management Consortium TMDL and Reasonable Assurance Overview.
Non-agricultural regional fertilizer application Tampa Bay Region Model Ordinance Non-agricultural regional fertilizer application Tampa Bay Region Model.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
PINEY POINT Water Management Plan FY04/05.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
1 CFR CHAPTER I AND 1 CFR PART 51 REGULATORY UPDATE.
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
NSF Standard Design Modifications – How they affect NSF Certification Texas Onsite Wastewater Association Conference Waco, TX March 12, 2014.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
PINEY POINT WATER MANAGEMENT TOWARDS CLOSURE FDEP by Nadim F. Fuleihan, Sc.D., P.E. Ardaman & Associates Geotechnical, Environmental and Materials Consultants.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Holly Greening Executive Director Tampa Bay Estuary Program October 13, 2008 Holly Greening Executive Director Tampa Bay Estuary Program October 13, 2008.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
DESALINATION. Desalination Technologies designed to produce freshwater from saline water. Seawater – ppm TDS Brackish water – 2000 ppm TDS Human.
Websites to note: 1.EPC Website - 2.Air Quality Technical Reports -
Tampa Bay Nitrogen Management Consortium Update Holly Greening Tampa Bay Estuary Program March 2014.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
1 NSW Environment Protection Authority (EPA) Carmen Dwyer Director Gas Implementation.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
Neighbours’ Meeting 29 th September Introductions  David Hopman – Manager Assets and Operations  Kevin Godfrey – Treatment Plant Supervisor.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
Non-agricultural regional fertilizer application Tampa Bay Region Model Ordinance Non-agricultural regional fertilizer application Tampa Bay Region Model.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
STORM WATER STORAGE AND TREATMENT
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Eco·Systems, Inc.. Beneficial Reuse of Industrial Byproducts Definition- turning an industrial byproduct into a valuable commodity Examples – Coal Combustion.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Page 1 POST INSPECTION LETTER REINFORCES THE INSPECTION AND ENCOURAGES COMPLIANCE September 29, 2005 Maggie Theroux
Chapter 19 Environmental Law Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Emergency Planning and Community Right-to-Know Act Regulatory Overview Course.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
“Engaging Compliance”: Attempting to improve engagement with Dairy Effluent Compliance in the Waikato Region Scott Cantley Proactive Monitoring programme.
Update on the resolution related to a rule to be proposed to the Texas Commission on Environmental Quality related to the beneficial reuse of wastewater.
Framework for CSO Control Planning
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Update on PI Modeling and Nitrogen Removal at Blue Plains
First in Service First in Value
STORMWATER MANAGEMENT
Arsenic Acceptable Ambient Level Revision
Nick Bonvoisin Secretary to the Convention on the
Mercury TMDL Review & Permitting Strategy Update
Indiana Department of Environmental Management Office of Water Quality
One Company. Unlimited Potential.
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

Environmental Protection Commission of Hillsborough County Extending Piney Point Emergency Permit November 3, 2003

TIME LINE SOME BACKGROUND REASONS TO SUPPORT EXTENSION REQUEST

September 11, Piney Point Update Agency on Bay Management September 18, EPC voted unanimously to send a letter to FDEP Secretary Struhs requesting they explore extending the EPA Emergency Permit September 29, 2003 – EPC Chairman sent request letter to Secretary Struhs EXTENSION REQUEST TIME LINE

October 13, 2003 – Secretary Struhs contacted EPC Chairman Platt and advised that FDEP would formally request EPA extend the Emergency Permit October 16, EPC voted unanimously to send a letter to EPA Region 4 Administrator Palmer urging approval of the permit extension request from FDEP TIME LINE

October 21, 2003 – FDEP sent letter to EPA formally requesting an extension of the Emergency Permit October 21, EPC sent a letter to EPA urging approval of the extension request from FDEP November 3, 2003 – Consideration of ABM support for FDEP Extension Request TIME LINE

Reduce Inventory of Process Water and Initiate Closure Activities Long Term Water Management Plan (WMP) Closure Plan – Dewater, Line, Isolate, and Close Pond Storage Compartments PRIMARY OBJECTIVE Piney Point Closure

Site has Received Excessive Rainfall during the last 12 months Average Rainfall Adds 160 MGal to the Site each year Closure Activities Delayed 2004 Dry Season Closure Plan – Close one stack compartment and prepare to close two additional compartments MEETING WMP OBJECTIVE

600 MGal Ponded Process Water 600 MGal Pore Water Increase Storage so that Significant Closure Work can be Accomplished Prior to the 2004 Rainy Season Must Discharge “Double-Lime” Treated Water WATER MANAGEMENT CHALLENGE

Water Balance Model Recalibrated Increase Target Wastewater Removal Rates (2 MGD to Over 4 MGD) Time Period – Minimum 3 to 5 Months Increase Storage so that Significant Closure Work can be Initiated AMENDED WMP

Double Amount of Water Removed From 2 MGD to 4 MGD Increase Amount of Reverse Osmosis Water 0.6 MGD to a Minimum of 1.0 MGD (By 10/15/2003) Increase Amount of Double-lime Aeration Water Minimum of 3.0 MGD (By 10/15/2003) Resumption of Double-lime Aeration Water to Bishop Harbor Target Ammonia Nitrogen Loading Rates (WQ Modeling Report) – 308 Pounds Per Day (15 Day Rolling Average) – 600 Pounds Per Day (Maximum) EMERGENCY ORDER FIFTH MODIFICATION SEPTEMBER 5, 2003

Potential Bishop Harbor Load LTB Load Reduction Target Overall Tampa Bay Load Reduction Target N Load (pounds per day)

Risk of a Catastrophic Accident Remains until Site is Permanently Closed Immediate need to Reduce Water On-Site to Initiate Closure Activities RO is not the only Solution “Double – Lime” Treated Water must be Discharged somewhere REASONS TO SUPPORT EXTENSION REQUEST

Only Current High-Volume Alternative to Discharge to Bishop Harbor is Gulf Dispersion Extension will Reduce Discharges and Nitrogen Loading to Bishop Harbor Extending the Permit Removes an Additional 70 to 75 MGal per month from the Site Additional Water off-site improves Water Balance, Dam Safety and Minimizes the Risk of Accidental Discharges REASONS TO SUPPORT EXTENSION REQUEST

FDEP has met Current Conditions of Emergency Permit No Adverse Environmental Impacts to Marine Water Quality or Marine Life Continued Ocean Dispersal should be Part of a Multi-Faceted Treated Wastewater Reduction Plan REASONS TO SUPPORT EXTENSION REQUEST

SHARE THE LOAD… USE OTHER HIGH VOLUME ALTERNATIVES AS LONG AS POSSIBLE… MINIMIZE THE LOAD TO BISHOP HARBOR AND TAMPA BAY !!!! BOTTOM LINE

Environmental Protection Commission of Hillsborough County Extending Piney Point Emergency Permit November 3, 2003