TeraGrid QA/INCA Turnover Jeff Koerner Q4 2010 meeting December 8, 2010.

Slides:



Advertisements
Similar presentations
TeraGrid Deployment Test of Grid Software JP Navarro TeraGrid Software Integration University of Chicago OGF 21 October 19, 2007.
Advertisements

SAN DIEGO SUPERCOMPUTER CENTER Inca 2.0 Shava Smallen Grid Development Group San Diego Supercomputer Center June 26, 2006.
Test harness and reporting framework Shava Smallen San Diego Supercomputer Center Grid Performance Workshop 6/22/05.
Cross-site data transfer on TeraGrid using GridFTP TeraGrid06 Institute User Introduction to TeraGrid June 12 th by Krishna Muriki
1 US activities and strategy :NSF Ron Perrott. 2 TeraGrid An instrument that delivers high-end IT resources/services –a computational facility – over.
Quality Assurance (QA) Working Group Update February 11, 2010 Kate Ericson (SDSC) Shava Smallen (SDSC)
Tripwire Enterprise Server – Getting Started Doreen Meyer and Vincent Fox UC Davis, Information and Education Technology June 6, 2006.
Virtual Network Servers. What is a Server? 1. A software application that provides a specific one or more services to other computers  Example: Apache.
Core Services I & II David Hart Area Director, UFP/CS TeraGrid Quarterly Meeting December 2008.
Network, Operations and Security Area Tony Rimovsky NOS Area Director
Windows Server MIS 424 Professor Sandvig. Overview Role of servers Performance Requirements Server Hardware Software Windows Server IIS.
Senior Design – Spring 2009 Richard Gory Focus: Networking & Web.
TeraGrid’s Integrated Information Service “IIS” Grid Computing Environments 2009 Lee Liming, JP Navarro, Eric Blau, Jason Brechin, Charlie Catlett, Maytal.
NOS Objectives, YR 4&5 Tony Rimovsky. 4.2 Expanding Secure TeraGrid Access A TeraGrid identity management infrastructure that interoperates with campus.
TeraGrid Gateway User Concept – Supporting Users V. E. Lynch, M. L. Chen, J. W. Cobb, J. A. Kohl, S. D. Miller, S. S. Vazhkudai Oak Ridge National Laboratory.
GIG Software Integration: Area Overview TeraGrid Annual Project Review April, 2008.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
DELL PowerEdge 6800 performance for MR study Alexander Molodozhentsev KEK for RCS-MR group meeting November 29, 2005.
September 14, 2015 XSEDE Operations Patricia Kovatch, Victor Hazlewood, Justin Whitt Randy Butler, Chris Jordan, Stephen McNally, Steve Quinn, Troy Baer,
Progress on TeraGrid Stability for the LEAD project.
OSG Public Storage and iRODS
TeraGrid Information Services JP Navarro, Lee Liming University of Chicago TeraGrid Architecture Meeting September 20, 2007.
 For Oracle Based Products  Windows XP Professional-SP3 / Window7-SP1 (32 Bit)  Min. Dual Processor or above  RAM 2GB or above  Internet explorer.
PCGRID ‘08 Workshop, Miami, FL April 18, 2008 Preston Smith Implementing an Industrial-Strength Academic Cyberinfrastructure at Purdue University.
Network Management Solution Ashley Stanifer. Overview Statement of the Problem Product Description and Intended Use Design and Development Deliverables.
 Brittany Robison  Robert Farrow Jr  Chris Denning  Tony Bates WEB 230.
Group 6 Project: Server Proposal. Introduction I. Vendor II. Servers a. Exchange b. Print c. Web d. SQL III. Software IV. Cost.
Set of priorities per WBS level 3 elements: (current numbering need to be mapped to new WBS version from Tim) (AD = member of wheels with oversight responsibility)
NETWORK FILE ACCESS SECURITY Daniel Mattingly EKU, Dept. of Technology, CEN/CET.
EPolicy Orchestrator WNUG June Meeting 6/6/2002. Presentation Contents What is ePO? What are the requirements? ePO components Demo of ePO Where to get.
Chapter 3 Installing Windows XP Professional. Preparing for installation Pre-installation requirement; ◦ Hardware requirements ◦ Hardware compatibility.
Kelly Gaither Visualization Area Report. Efforts in 2008 Focused on providing production visualization capabilities (software and hardware) Focused on.
TeraGrid Quarterly Meeting Dec 5 - 7, 2006 Data, Visualization and Scheduling (DVS) Update Kelly Gaither, DVS Area Director.
Wright Technology Corp. Minh Duong Tina Mendoza Tina Mendoza Mark Rivera.
TeraGrid Privacy Policy: What is it and why are we doing it… Von Welch TeraGrid Quarterly Meeting March 6, 2008.
FutureGrid Cyberinfrastructure for Computational Research.
A Networked Machine Management System 16, 1999.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Kurt Mueller San Diego Supercomputer Center NPACI HotPage Updates.
SAN DIEGO SUPERCOMPUTER CENTER Inca TeraGrid Status Kate Ericson November 2, 2006.
CHAPTER 2: BASIC OF OPEN SOURCE OPERATING SYSTEM Part 2 (Linux installation)
TeraGrid Extension Gateway Activities Nancy Wilkins-Diehr TeraGrid Quarterly, September 24-25, 2009 The Extension Proposal!
SAN DIEGO SUPERCOMPUTER CENTER Inca Control Infrastructure Shava Smallen Inca Workshop September 4, 2008.
TeraGrid NOS Turnover Jeff Koerner Q meeting December 8, 2010.
1 NSF/TeraGrid Science Advisory Board Meeting July 19-20, San Diego, CA Brief TeraGrid Overview and Expectations of Science Advisory Board John Towns TeraGrid.
TeraGrid Gateway User Concept – Supporting Users V. E. Lynch, M. L. Chen, J. W. Cobb, J. A. Kohl, S. D. Miller, S. S. Vazhkudai Oak Ridge National Laboratory.
NOS Report Jeff Koerner Feb 10 TG Roundtable. Security-wg In Q a total of 11 user accounts and one login node were compromised. The Security team.
Data, Visualization and Scheduling (DVS) TeraGrid Annual Meeting, April 2008 Kelly Gaither, GIG Area Director DVS.
Network, Operations and Security Area Tony Rimovsky NOS Area Director
TeraGrid User Portal Migration Project Summery Jeff Koerner Director of Operations TeraGrid GIG Matt Heinzel Director TeraGrid GIG September 2009.
SAN DIEGO SUPERCOMPUTER CENTER Welcome to the 2nd Inca Workshop Sponsored by the NSF September 4 & 5, 2008 Presenters: Shava Smallen
Attribute-based Authentication for Gateways Jim Basney Terry Fleury Stuart Martin JP Navarro Tom Scavo Nancy Wilkins-Diehr.
Quality Assurance (QA) Working Group Update July 1, 2010 Kate Ericson (SDSC) Shava Smallen (SDSC)
Initiating Teragrid Sessions Raghu Reddy. Outline Motivation Initial Setup –Certificates –Proxies –Grid-map file entries and DNs Softenv for customizing.
Software Integration Highlights CY2008 Lee Liming, JP Navarro GIG Area Directors for Software Integration University of Chicago, Argonne National Laboratory.
Automating Installations by Using the Microsoft Windows 2000 Setup Manager Create setup scripts simply and easily. Create and modify answer files and UDFs.
Chapter 5 Server Installation NT Server Requirements NT Server File Systems Installation.
Visualization Update June 18, 2009 Kelly Gaither, GIG Area Director DV.
ITMT 1371 – Window 7 Configuration 1 ITMT Windows 7 Configuration Chapter 8 – Managing and Monitoring Windows 7 Performance.
Common User Environments - Update Shawn T. Brown, PSC CUE Working Group Lead TG Quartely 1.
SAN DIEGO SUPERCOMPUTER CENTER SDSC Resource Partner Summary March, 2009.
Scientific Linux Inventory Project (SLIP) Troy Dawson Connie Sieh.
TeraGrid Software Integration: Area Overview (detailed in 2007 Annual Report Section 3) Lee Liming, JP Navarro TeraGrid Annual Project Review April, 2008.
Quality Assurance Working Group Doru Marcusiu, NCSA QA Working Group Lead TeraGrid Annual Review April, 2009.
TeraGrid User Portal and Online Presence David Hart, SDSC Area Director, User-Facing Projects and Core Services TeraGrid Annual Review April 6, 2009.
DIT314 ~ Client Operating System & Administration
Room in the Inn Registration System
Jerald Overstreet, GISP Server Portal SQL Manager Admin
Presentation transcript:

TeraGrid QA/INCA Turnover Jeff Koerner Q meeting December 8, 2010

QA/INCA Quality Assurance –Staffing (QA): 2.96 FTEs By site:.085 ANL.25 IU.125 LONI.25 NCSA.25 NICS.50 PSC.25 Purdue.75 SDSC (.25 to lead group and.50 for member participation).50 TACC

–By people: 2.16 FTEs*.15 (Kate Ericson – Co-lead).05 (Shava Smallen – Co-lead).085 ANL (Joe Insley).25 IU (Mike Lowe).125 LONI (Alex Pacheco).25 NICS (Daniel Lucio).50 PSC (Derek Simmel and Rich Raymond).25 Purdue (Fengping Hu).25 SDSC (Kenneth Yoshimoto).25 TACC (David Carver) *.80 missing at NCSA/SDSC/TACC which have staff shortages. QA Cont.

Services: The QA group uses both Inca and Process Accounting services. –INCA A monitoring tool for testing user-level functionality and performance. Currently used by the TeraGrid Operations and QA groups to assess reliability of CTSS. Staffing:.7 FTE (SDSC RP & GIG) –Paul Hoover (.50) –Shava Smallen (.05) –Kate Ericson (.15) –Process Accounting Scripts used to summarize process accounting data collected on TeraGrid login nodes. Used to measure usage of tools in order to prioritize QA debugging efforts.

QA/INCA Hardware Hardware: –sapa.sdsc.edu (PowerEdge 2850) – hosts Inca server components Intel(r) Xeon(tm) Processor at 3.4GHz/2MB Cache, 800MHz Memory 4GB DDR2 400MHz (4X1GB), Single Ranked DIMMs Riser Card Riser PCI-E Support Primary Hard Drive 73GB 15K RPM Ultra 320 SCSI Hard Drive 2nd Hard Drive 73GB 15K RPM Ultra 320 SCSI Hard Drive Software: Open source software only (i.e., no third party service agreements)

Transition Plan Transition: –In order to transition the Inca deployment over to XD, the current Inca team will document the current process of pulling software registration’s from TeraGrid’s IIS server and how to translate that to Inca monitoring tests. To transfer the Inca deployment, the following steps will be needed: Copy Inca deployment directory and associated cron scripts over to XD machine Install Postgres on XD machine and copy over sapa.sdsc.edu’s Postgres database to XD machine. New Inca admin should install incat (Inca administrative GUI) on their machine Copy over Inca reporter repository to new XD web space

Transition Cont. Transfer ownership of inca accounts on all machines to XD team. Redirect or add new DNS entry for inca.teragrid.org to point to new XD machine Process Accounting –Hardware: Runs on TG login nodes –Software: In house scripts –Transition: Documentation and summarization scripts will be transferred over to new XD team.