BI Offline Algorithm Framework Some Examples of What It Can Do for Us.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Introduction to Qualtrics for Online Surveys Claire Goverts; Office of Research Analysis, and Planning (RAP)
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advancing Wireless Link Signatures for Location Distinction J. Zhang, M. H. Firooz, N. Patwari, S. K. Kasera MobiCom’ 08 Presenter: Yuan Song.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Computer Architecture Instruction Level Parallelism Dr. Esam Al-Qaralleh.
Level 2 Status and Outlook Ali Hanks Run 7 DAQ Fest Oct. 18, 2006.
1 QED In Vivo USB Input Output Box configuration This tutorial contains a number of instructions embedded in a great deal of explanation. Procedures that.
Full Guaranteed & Safe OST Converter Software
Ircon ® ScanIR ® 3 Linescanner How to work with Snapshots? Confidential Rev. A 07/2013.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
Program Guide v25Q3. Overview » Concepts » Workflow  Press sheet  Linking product  Program guide  Publishing a program guide day » Layout configuration.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Smart PSS Associate Certified Class Dahua Security Certification
Opton 4 short presentation1 Opton 4 User friendly operating software for Symmetron’s Stylitis data loggers.
Elliott Wolin Hall D Online Meeting 4-Mar  A few weeks ago Elke asked how long it would take to get an EPICS system going  I didn’t know  I had.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Documentation: What we might do in an ideal world Ian McCrea.
BING: Binarized Normed Gradients for Objectness Estimation at 300fps
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Offline A nalysis F ramework OAF Jean-Jacques Gras, Stephen Jackson, Blazej Kolad.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
LHC LHC Wire Scanner Application Manual oOverview: 1 M. Kuhn - 12/03/2015.
Introduction to R Introductions What is R? RStudio Layout Summary Statistics Your First R Graph 17 September 2014 Sherubtse Training.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Note for presenters Welcome to the Young Carers in Schools slidepack that is designed to support local authorities and young carers’ services looking to.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
Team now comfortable with > 80k lines of inherited code Controller Ported to run on new 64 bit Proliant machine Re-engineered Orbit Trigger delivery (now.
By: David Gelbendorf, Hila Ben-Moshe Supervisor : Alon Zvirin
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
We will start shortly…. DiView II DiView II Software Presented by: Daniele Posenato.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
FTS monitoring work WLCG service reliability workshop November 2007 Alexander Uzhinskiy Andrey Nechaevskiy.
Spike sorting Tutorial
Collimator BPM Discussion 14/3/2014.  DOROS agents produce position data at 25Hz  Also need to be sent settings at 1Hz  Settings need to arrive at.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
infinity-project.org Engineering education for today’s classroom Outline Images Then and Now Digitizing Images Design Choices in Digital Images Better.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
1 Detector Monitoring requirements ( V.Dattilo for the EGO Operations Group ) ( with the collaboration of S.Braccini)  Short history  Current status.
© 2013 IBM Corporation 1 Welcome to SUA/ILMT design validation session.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
7/8/2016 OAF Jean-Jacques Gras Stephen Jackson Blazej Kolad 1.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Stavroula Balopoulou , Angelo Lykiardopoulos, Sissy Iona HCMR-HNODC
A monitoring system for the beam-based feedbacks in the LHC
2007 IEEE Nuclear Science Symposium (NSS)
CCS Engineering Tools The tools are used help development and debugging of VLT SW control applications This presentation will provide a general view of.
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
AMMS-WG BE-BI and PPE 9/12/2018.
Offline Analysis Framework STATUS
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Oracle Sales Cloud Sales campaign
Wire almost entirely through beam before BLM triggers dump
LHC BLM Software audit June 2008.
Advancing Wireless Link Signatures for Location Distinction
WUR FDMA Padding Content
Linac Diagnostics Commissioning Experience
Presentation transcript:

BI Offline Algorithm Framework Some Examples of What It Can Do for Us

Main Tools: ing Once report is done, informative will be sent to configured recipient with link towards report and summary of alarms

What you could have in your alarm report and … (config set for the example). Total numberof alarms is in the mail title.

Report on number of DB records alarm Gray background -> No Alarm set Red background -> Alarm (min,max nb of records) set and detected for this variable. Green background -> Alarm configured but not detected. N.B.: ACQTIMEINCYCLE_IN alarm has been: ‘Should have same nb as ACQ_STATE, so it’s Green even for this large number of scans

Table for status bit alarms Bits are set to red backgoundwhen they are found not to be ON or OFF is they should have as declared in the configuration. The number of records is reminded for info.

Extra Plot Type: BITSTT_2D Use Case: Show the evolution over the consecutive records of the different bit values of a status bit register (Show the raw value, not if good or bad) BUG

Extra Plot Type: VECTOR Use Case: Show the evolution in time of BLM card temperature measurements for a given day. Each line corresponds to a DAB.The green band correspond to the limits configured in the alarm sheet.

Extra Plot Type: VECT_TRANSP Use Case: Show the BLM card temperature measurements. The green band correspond to the limits configured in the alarm sheet. Abscisse is the card id. Each line corresponds to a DB record. The green band correspond to the limits configured in the alarm sheet.

Extra Plot Type: SUM_VECT_BOX Use Case: Gather in one plot statistic for all BLM temperature measurements in all crates for a given day

Extra Plot Type: VECT_BOX Use Case: Gather in one plot statistic for all BLM temperature measurements in a given crate for a given day

Use Case: Merging LHC B1 BCT devices and plotting with energy as secondary axis.

Use Case: same showing filter BCT data where beam mode = 11 (stable beam)

Use Case: LHC B1 BCT comparison during stable beam mode (wrt DCCT A)

Extra Calculation: WRT_REF Use Case: Show Relative measurement statistic (over a day) of BCTs in L2 with respect to LI.BCT06.

Extra Calculation: WRT_PRV Use Case: Show Relative measurement statistic (over a day) of BCTs in L2 with respect to previous BCT on the line.

Use case: All scans (PROF_DATA) during an LHC measurement campaign period with 6 bunches (Using a fixed time window snapshot)

Use case: Same, but zooming on last bunch…

Use case: Same, all bunches but as 2D view…

Use Case: The PROF_POSITION data for a set of scans

Use Case: 3D view of BPM DAB temperatures (one day)

Use Case: Statistics on BPM DAB temperatures (average, min and max for each channel over one day

Use Case: Selection of a few channels over the 1000 BPMs data

JJ’s proposal for a little logo to remind the source of the plot (and that bad behaviours should never remain unpunished)…

The Next (soon) Steps Missing and foreseen features: – History features for easy long term monitoring on NUMERICS and VECTORNUMERICS – Scatter plots and some correlation options – Handling of 2D images (especially with dynamic dimensions) – Low resolution reports. – When aging/status reports will be properly covered by a stabilized framework, open the door (via a maintainable/efficient solution) to the configurable introduction of dedicated code by developed by expert…

Potential Extra Usage We could try also to use this tool ‘ONLINE’ during MD – We could define a short time (ie 15 mn) dynamic DB snapshot to look at the last 15 mn DB recording to check that things are going well – We could define before the MD a DB snapshot covering the entire MD time frame and play this snapshot during the MD to already see in realtime the data analysis we prepared before.

Main Tools: Naming Conventions In order to make things possible and a little organised, we used (and impose to work with OAF) the following naming conventions. Each set of data (not when, only what) will be identified by an and a must not contain the ‘_’ or ‘ ‘ caracters <instrument ID. Must belong to a predefined list that the OAF team is maintaining The corresponding Timber ‘snapshot’ (see later) must be ‘Public’ and called: BI_ _

Main Tools: Naming Conventions So far we ‘ve got: – BCT, BLM, BOFSU, BPM, BSRT, BWS as instrument IDs – And the following Timber snapshots for example: BI_BCT_calib BI_BCT_B1-cmp BI_BLM_LHC-temp BI_BWS_PSB-H-status …

Main Tools: Report Repository Mail sent will contain in addition to a summary of the alarm report: – A link towards the new report – A link towards the repository where all reports are stored ( – A link towards the repository where most recent reports are referred ( – A link towards the repository where most recent reports with alarms are referred ( – A link towards the repository where most recent reports without alarms are referred (