Creating the Work Breakdown Structure. INFO 638Lecture #22 WBS The goal of the project should be accomplished when all tasks in the WBS are completed.

Slides:



Advertisements
Similar presentations
Project Scope Management (Day 2)
Advertisements

NEES Project Management Workshop June 16 June 18 1 Segment 3.
INFO 638Lecture #81 Software Project Management Cycle plan and build INFO 638 Glenn Booker.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
Work Breakdown Structure.
Project Scope Management
CSSE September.2008 Work Breakdown Structure Chapter 4.
Projmgmt-1/17 DePaul University Project Management I - Work Breakdown Structure Instructor: David A. Lash.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Management 30 January. Odds and ends Tournament on the webweb In the newsnews.
Effective Project Management
Software Project Management
Project Time Management
Project Management Session 7
Chapter 5: Project Scope Management
Projmgmt-1/22 DePaul University Project Management I - Realistic Scheduling Instructor: David A. Lash.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Scope Management J. S. Chou, P.E., PhD.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management and Scheduling
Planning & Scheduling Your Projects 1. Planning Elements Work Breakdown Structure (WBS) ◦Identifying the tasks and organizing them Scheduling the WBS.
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
Quiz#1 Chapter 5: Estimating Project Times and Cost
 Probably the most time-consuming project management activity.  Continuous activity - Plans must be regularly revised.  Various different types of.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
Information Technology Project Management
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Week 6: Project Management E1102 – Design Fundamental Using Advanced Computer Technologies Spring 2010.
Work Breakdown Structure (WBS) The WBS represents a logical decomposition of the work to be performed and focuses on how the product, service, or result.
IT Project Management, Third Edition Chapter 5 1 Chapter 2: Project Scope Management.
Chapter 5 Project Scope Management
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lecture4 : Project planning Lecturer: Kawther Abas 447CS – Management of Programming Projects.
Basic of Project and Project Management Presentation.
Common Activities Activities and Tasks in the WBS.
Software Project Management
Ch. 41 Project control. Ch. 42 Work Breakdown Structure WBS describes a break down of project goal into intermediate goals Each in turn broken down in.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
Resources Performance time Project Planning Phase : Generating Tasks & Identifying Responsibilities 1.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Chapter 23 – Project scheduling Lecture 1. Project scheduling  Project scheduling is the process of deciding how the work in a project will be organized.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
PRJ566 Project Planning & Management Work Breakdown Structure.
PRJ566 Project Planning and Management Work Breakdown Structure 1.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Estimating Project Time and Cost
Project Management.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Project Time Management
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Part II Lecture 11B.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
SOFTWARE PROJECT MANAGEMENT
Project Schedule & Gantt Chart Unit 4 – Virtual Project.
IT-301 Project Management I: Unit 4: Cost Management.
Information Technology Project Management, Seventh Edition.
Creating a Work Breakdown Structure with Microsoft Project.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
P ROJECT M ANAGEMENT Skills.
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Creating the Work Breakdown Structure

INFO 638Lecture #22 WBS The goal of the project should be accomplished when all tasks in the WBS are completed When major activities are sequential, they typically appear in that order in the WBS – The Gantt chart and PERT chart (we’ll discuss later) are graphic forms of the WBS

INFO 638Lecture #23 Activity Decomposition The key to writing a good WBS is to decompose the project goal into major activities – Then keep breaking those activities down until you get to the smallest level of tasks mentioned earlier – A WBS with too much detail is time consuming to generate and follow …not enough detail, and you miss important tasks

INFO 638Lecture #24 Why Create a WBS? The WBS helps plan out the process needed to accomplish the project It also helps design the architecture of the project It forms the basis for estimating the time and effort needed for the project It establishes a baseline for reporting project status

INFO 638Lecture #25 Generating a WBS There are two basic approaches to generating a WBS – Top-down Start at the project goal, and keep breaking down activities until you get to the smallest task needed – Can use the Team approach (have everyone work on the schedule together) or – The Subteam approach (agree on level 1 activities, then have subteams tackle each activity in detail; then check for duplication and missed tasks)

INFO 638Lecture #26 Generating a WBS – Bottom-up Agree on the top level activities using the top-down approach Then break into teams and brainstorm all the activities you think are within that overall activity Organize the activities, and check for missed tasks and redundancies Often the top-down approach results in a more complete draft WBS

INFO 638Lecture #27 Special Case WBS’s Small projects may want to consider tools to help generate a good WBS, such as mindmapping mindmapping Large projects may need to alter the approach to develop the top two WBS levels as a group, then establish subteams or teams to fill out the details below that

INFO 638Lecture #28 Are we Done Yet? Six criteria can help determine if a WBS is complete – Measurable Status – Is each task defined in a way to help monitor its status toward completion? Typically requires some kind of measurement to assess percent completion – Bounded – Is each task clearly bounded by start and stop events? What event marks the start and stop of each task?

INFO 638Lecture #29 Are we Done Yet? – Deliverable – Does each activity have a clearly defined deliverable? What output should the activity produce? – Cost and Time Estimate – Is each activity defined in a way that allows a meaningful estimate of its calendar time and cost to completion? Often software cost is largely driven by the labor cost, and hence the amount of effort needed to develop it

INFO 638Lecture #210 Are we Done Yet? – Acceptable Duration Limits – Most activities should be broken down into tasks which are reasonably small Under two weeks is the upper limit There can be exceptions to this rule – Activity Independence – Are the activities defined to be independent of each other as much as practical? Avoid activities that are too complex, or the other extreme, micromanaging