28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:

Slides:



Advertisements
Similar presentations
Application samples All rights reserved, property and © CAD Computer GmbH & Co. KG 2009.
Advertisements

Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
T.Schneider/LHCb Muon EDR
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
20-Nov-15S.Movchan Straw manufacturing and QC1 Straw machine status straw fabrication option 1: removing metallization from tape edges by laser study straw.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
Neil Dixon PH/DT CERN 22/03/10 Straw Material Plans Latest news. Latest news. Many tests ongoing at CERN and in JINR in and attempt to validate in and.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Straw manufacturing current status T.Enic, Yu.Potrebenikov
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
DB Current Status Polenkevich Irina. The general requirements on DB Access through the Internet; DB backup to do automatically (once per week);
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
My personal Resumé Very interesting work-shop, stimulating atmosphere and very good discussions. Accommodation is excellent. For the Straw Project we have.
Presented by: De Carlo Livio Supervisor: Scheubel Maud Section: EN/MME-MM.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ECAL LED monitoring system upgrade status 04/09/20131.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
Planning for Proto-DUNE PD Installation and Cabling at CERN
S.Movchan Straw manufacturing and QC
Update on Pavia MM mechanical prototype
Ti/SS transitions A.Basti INFN-PISA*
Quality Control Chamber Production
new straw end plug: D=10.6 mm straws support frame Levan option
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Quality Control in Straw Production
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
LARP Phase II Secondary Collimator RC1
Update on the IBL vacuum flex transfer lines
SciFi option for neutrino target tracker
Neil Dixon PH/DT Dubna 30/11- 4/12 '09
Far Detector Activities Late 2017 – Early 2018
Update on the IBL vacuum flex transfer lines
Gas Monitoring Chamber Production Status
Status of the PANDA Solenoid Magnet Production in BINP
Presentation transcript:

28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization: set of samples conclusion DB, Dubna assembly hall, ordering aluminum blanks for modules Presented by S.Movchan

28-Feb-16S.Movchan Straw manufacturing and QC2 Ultrasonic welding machine: common view

28-Feb-16S.Movchan Straw manufacturing and QC3 New shape of straw welding fixture

28-Feb-16S.Movchan Straw manufacturing and QC4 Straw transportation New mechanics New motor + reductor

28-Feb-16S.Movchan Straw manufacturing and QC5 Straw transportation: shuttle 2+2 new wheels on the shuttle

28-Feb-16S.Movchan Straw manufacturing and QC6 Seam shape on-line QC by microscope set up weld seam shape

28-Feb-16S.Movchan Straw manufacturing and QC7 Ultrasonic generator control by computer

28-Feb-16S.Movchan Straw manufacturing and QC8 T and Humidity control by computer

28-Feb-16S.Movchan Straw manufacturing and QC9 Clean room: start up in preparation Condition Ventilation Air filters (8 pc)

28-Feb-16S.Movchan Straw manufacturing and QC10 Straw welding speed optimization: set of samples

28-Feb-16S.Movchan Straw manufacturing and QC11 Hostaphan PET: conditions of straw manufacture (14 May 2010) clean room: T=+23 degree, H=75% straw welding machine parameters: ultrasonic generator: clock F=38.5 MHz, P= 45 % (PET) or 40% (PET+Cu+Au) head temperature: 30 degree (due to short head operation time) ultrasonic head pressure to tape: 300 g spool pretension: 185 g (instead 30 g) tape friction: (425+/-25) g (instead (200+/-10) g) speed of straw transport mechanics: mm/sec NO - flush of welding zone by ionization gun seam quality check by “on-line” microscope: operator on monitor + file (simultaneously with seam welding) for each straw cut 2 samples (start and end) and to do seam test by hand (like tensile machine, across and along seam) NO - measurement seam width by optic microscope (requirement: W=( ) mm) NO - straw internal diameter check by gouge NO - straw round shape check by eyes

28-Feb-16S.Movchan Straw manufacturing and QC12 Samples for straw welding speed optimization Straw # Speed (mm/sec) Sonic head pressure (g) Sonic generator power (%) On-line file Comments yes PET yes Cu+Au yes Cu+Au -> PET no PET yes PET -> Cu+Au yes Cu+Au >45yes PET yes PET Samples are delivered to CERN

28-Feb-16S.Movchan Straw manufacturing and QC13 Straw machine: conclusion Ready: Straw transportation mechanics: - forward speed – (4-22) mm/sec - reverse speed – 22 mm/sec Room T and H control – ready Ultrasonic generator control – ready In progress: On-line QC by microscope Clean room start up In fabrication: Tape pretension mechanics Tape to round shape transfer: set of fixtures Light source for on-line microscope Preparation: Set up for serial straw test at dP=3 bar Straw bar code printing Design: Tencile machine Set of “nipples” for straw long term storage Set up for straw filling by gas: dP=1.2 bar Storage box for serial straws Straw boxes depository inside the clean room Checker pressure inside filling straw during it storage Problem: Electrostatic charge of tape – due to this effect straw transportation speed is non stable. Shuttle speed is constant. => Straw – elastic body.

28-Feb-16S.Movchan Straw manufacturing and QC14 Conclusion DB: Test DB – in progress Modules assembly hall (bld.217): - Machine for precision coordinate measurement of module reference holes – switch ON - Table software design – responsible person is G.Mescheriiakov - Design module rotation table – in progress - Table for module vacuum test - responsible person is T.Enik Aluminum blanks for straw modules: V.Bogdanov at SAMARA this week: - OAO “ALKOA” - quotation, delivery time, invoice, …. - Blanks transportation to OAO “PROGRESS” for machining – look for transportation company - OAO “PROGRESS”: flanges and bars machining possibility - discussion

28-Feb-16S.Movchan Straw manufacturing and QC15 Spare

28-Feb-16S.Movchan Straw manufacturing and QC16 Straw labeling Size: Option 1: 10x40 mm Option 2: 5x20 mm Code: CERN: 333 (France) Straw country: 07 (Russia) NA62: 062 Straw tracker: ST Straw #: ST9999

28-Feb-16S.Movchan Straw manufacturing and QC17 Straw labeling: label glue to straw

28-Feb-16S.Movchan Straw manufacturing and QC18 Read data to DB

28-Feb-16S.Movchan Straw manufacturing and QC19 Straw labeling: conclusion Straw labeling procedure is proposed: - label code ST9999 (14 digits) - label size – 5x20 mm - print labels by “label printer” - 2 the same labels will be glued on both straw ends (for robustness) - before straw gluing into module straw label will be read out and cut out - straw # (label) will be replaced by hole # in the “Module holes numbering DB” Label reader and DB (based on Excel table) exist at Dubna

28-Feb-16S.Movchan Straw manufacturing and QC20 Hostaphan PET: conditions of straw manufacturing (29 January 2010) room #108: T=+10 degree, H=40% straw welding machine parameters: ultrasonic generator: clock F=38.5 MHz, P= 30% and (50-60)% head temperature: 28 degree and (24->21) degree (sample production) ultrasonic head pressure to tape: 135 g spool pretension: 30 g tape friction: (200+/-10) g speed of straw transport mechanics: about 12 mm/sec flush of welding zone by ionization gun - NO manual check seam quality by microscope with video chamber (simultaneously with seam welding) for each straw cut 2 samples (start and end) and to do seam test by hand (like tensile machine, across and along seam) measurement seam width by optic microscope (requirement: W=( ) mm) straw internal diameter check by gouge straw round shape check by eyes

28-Feb-16S.Movchan Straw manufacturing and QC21 Excell 532 PET: conditions of straw manufacturing (9 March 2010) clean room: T=+25 degree, H=65% straw welding machine parameters: ultrasonic generator: clock F=38.5 MHz, P= 50 % head temperature: 36 degree ultrasonic head pressure to Cu/Au tape: 70 g spool pretension: 30 g tape friction: (200+/-10) g speed of straw transport mechanics: about 10 mm/sec flush of welding zone by ionization gun - NO manual check seam quality by microscope with video chamber (simultaneously with welding) for each straw cut 2 samples (start and end) and to do seam test by hand (like tensile machine, across and along seam) measurement seam width by optic microscope (requirement: W=( ) mm) straw internal diameter check by gouge straw round shape check by eyes

28-Feb-16S.Movchan Straw manufacturing and QC22