Orlando-Orange County Expressway Authority Project Development Process.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Metro Muncipal Agreement Program
WARD LAKE MASTER PLAN Public Input Workshop #1 July 14, 2011.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
BRUCE FREEMAN RAIL TRAIL ARTICLES 22, 23, & ANNUAL TOWN MEETING.
Selection Scoring Methodology Presented by August 23, 2007.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Environmental Assessment Public Meeting
Kick Off Meeting City of Pensacola April 18, 2011.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Longmeadow Parkway Fox River Bridge Corridor
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Transportation Planning Process Freight Transportation Planning Workshop July 11, 2001.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Transportation Projects City Council Workshop May 14, 2013.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Capital Improvements Program (CIP) Council Workshop January 29, 2008 Council Chambers 6:00 p.m.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Alternative Alignments Public Meeting
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Six Year Improvement Program Public Hearings
Wakulla County Airport
Delta Water Supply Project
Presentation transcript:

Orlando-Orange County Expressway Authority Project Development Process

Project Development Process Planning Project Development & Environment Assessment Design Finance Right-of-way Permitting Bidding / Construction

Project Development Process Planning Long Range Master Plan Five-Year Work Plan

Transportation Planning Planning Process Coordination –State and Local/Regional Agencies –Regional Transportation Authorities –Metropolitan Planning Organization Elected Officials: Policy Board Technical Committee: Professional Staff Citizens Committee: Appointed Membership –General Public Public Involvement Meetings, Published Materials

Transportation Planning Long Range Plan/Master Plan –20 to 25 year horizon –Updated every 5 years –Begin with existing roadway systems –Evaluate policy strategies –Coordinated with regional planning (MetroPlan) –Identify corridors which need improvements –Identify priorities and general staging approach –Provide input to OOCEA’s implementation phases and short range planning

Transportation Planning Short Range Plan –Updated annually –5-Year Work Plan –Identifies and assigns funding sources

Five-Year Work Plan Planning Process Renewal & Replacement Projects Does Not Meet Criteria Intelligent Transportation Systems Projects Updated Revenue Projections Master Plan Projects Draft Five-Year Work Plan Financial Analysis Final Five-Year Work Plan Board Adopts Work Plan

Project Development Process Planning Corridor Planning & Development

SR 429 Part A Schedule New Limited-Access Road (11 miles) PD&E Project Activities Year 1Year 2Year 3Year 4Year 5Year 6 18

Project Development & Environment Steps in the process –Identify and map existing environmental features Social (cultural, neighborhood, recreational) Natural (wetlands, habitats, hydrologic) Physical (air, noise, water quality) –Develop and refine traffic forecasts

Project Development & Environment Steps in the process (continued) –Identify and evaluate potential corridors for improvements: Opportunities and Constraints –Select the optimum corridor –Develop design concept alternatives/alignments –Document positive and negative impacts –Select preferred design alignment

Project Development & Environment Public involvement & Coordination activities: Ongoing throughout the project –Corridor and alternative concept workshops –Public hearing –Newsletters –Direct mailouts –Press releases –Internet web sites –State and local agency coordination –Environmental Advisory Group (EAG) Coordination

Project Development & Environment Documents prepared: –Public Involvement Plan –Location Hydraulics Report –Utility Impact Report –Cultural Resources Report –Wetland Evaluation Report –Geotechnical Report –Air Quality Report –Noise Study Report –Biological Assessment Report –Contamination Screening Report –Permit Coordination Report –Preliminary Engineering Report –State Environmental Report

Project Development Process Planning Corridor Planning & Development Design

PD&E Final Design Project Activities Year 1Year 2Year 3Year 4Year 5Year 6 SR 429 Part A Schedule New Limited-Access Road (11 miles)

Design Detailed data collection –Aerial mapping –Design and right-of-way surveys –Geotechnical (soils) surveys –Existing and proposed utility locations –Wetland limits delineated

Design Prepare construction plans –Roadway, bridges, and misc. structures –Drainage and permitting documents –Traffic signal plans –Maintenance of traffic plans –Utility coordination plans –Signing and pavement marking –Toll facilities –Roadway lighting –Landscaping treatments –Fiber optic network

Design Plans, specifications, estimates (PSE) –Specifications FDOT Technical Specifications Supplemental specifications –Estimates Quantity calculations Unit prices

Project Development Process Planning Corridor Planning & Development Design Financing

Financing/Bond Sale Select Underwriters Prepare Local & State Agreements Prepare Finance Plan Prepare Engineer’s Report Prepare Traffic & Earnings Report Preliminary Official Statement Prepare Bond Documents Obtain Ratings & Insurance Execute Bond Purchase

Project Development Process Planning Corridor Planning & Development Design Right of Way Financing

PD&E Final Design Right-of-way Project Activities Year 1Year 2Year 3Year 4Year 5Year 6 SR 429 Part A Schedule New Limited-Access Road (11 miles)

Right-of-way Right-of-way Team involved in the design process Acquisition process typically begins at 60% roadway plans Appraisal Acquisition –Negotiated –Condemnation

Project Development Process Planning Corridor Planning & Development Design PermittingFinancing Right of Way

PD&E Final Design Right-of-way Permitting Project Activities Year 1Year 2Year 3Year 4Year 5Year 6 SR 429 Part A Schedule New Limited-Access Road (11 miles)

Permitting Coordination continues from PD&E and Environmental Advisory Group activities Pre-application meetings at start of design Application prepared/submitted at 60% roadway plans and 100% drainage design, proceeding parallel with remaining design activities

Permitting Requires activities at numerous levels –Federal –State –Regional and Local

Permitting Federal agency requirements –US Army Corps of Engineers (ACOE) Nationwide & Individual wetland impact Wetland Mitigation No net loss of wetlands –US Environmental Protection Agency NPDES: Non-Point Discharge Elimination System

Permitting State of Florida agency requirements –FDEP Environmental Resource Permit Includes Management and Storage of Surface Water Dredge and fill Wetland Mitigation –Florida Game and Freshwater Fish Commission Wildlife impact on species of concern

Permitting Regional & Local Government requirements –Water management districts Environmental Resource Permit Drainage Wetland and wildlife impacts –Local governments Drainage Criteria Wetland and wildlife impacts

Permitting Wetland Mitigation Options Creation: Replace and Maintain Mitigation “banking”: Public or Private Beltway Mitigation Bill

Project Development Process Planning Corridor Planning & Development Design Permitting Right of Way Construction Financing

PD&E Final Design Right-of-way Permitting Bidding Construction Project Activities Year 1Year 2Year 3Year 4Year 5Year 6 SR 429 Part A Schedule New Limited-Access Road (11 miles)

Bidding Advertisement Distribution of plans and specs Conduct Pre-bid meeting Conduct bid opening Evaluate bids and recommendation for award

Construction OOCEA general specifications Refinements to FDOT Standard Specifications –Lump sum MOT –Lump sum erosion control –Dispute Review Boards –Pre-award meeting –No time adjustments for weather –Partnering

Construction Team –OOCEA Staff and GEC –Construction Management Consultant –CEI’s –Materials Testing –Design Engineer (Post-design services) Activities –Contract administration –Review shop drawings and RFIs –Inspections –Expedited issues resolutions –Project acceptance

PD&E Final Design Right-of-way Permitting Bidding Construction Project Activities Year 1Year 2Year 3Year 4Year 5Year 6 SR 429 Part A Schedule New Limited-Access Road (11 miles)

Typical Project Schedule - GDOT Project Activities Pre-TIP Right of Way Completed LRP & TIP Database Prep Concept Dev./Validate Environmental ? Preliminary Plans Advertise and Construction Final Construction Plans

Typical Project Schedule - FDOT Project Activities Pre-TIP Bidding Completed LRP & TIP PD&E Construction Plans Right-of-way ? Permitting Construction

Typical Project Schedule - NCDOT Note: 1)Timeline is for a typical 15-mi new location project 2)Project Identification consists of the development of an ‘internal’ Draft environmental document. Project Activities Pre-TIP yrs Bidding Project Identification Enviro. Documentation Construction Plans Right-of-way ? 18 Permitting Construction

Typical Project Schedule - ALDOT Note: 1)Timeline is for a typical 10-mile widening project 2)TIP revised on continual basis Project Activities Pre-TIP yrs Bidding Project Id. & TIP Prel. Eng./ Env. Doc. Construction Plans Right-of-way Permitting Construction

Project Activities Pre-TIP R/W and Utility Relo Project Authorization ? 6789 Acquire Permits Location/Envir Studies Advanced Plng Report Survey and Design Construction & Close Out Contract Letting Typical Project Schedule - TDOT

Typical Project Schedule - VDOT Project Activities Pre-TIP Complete Quantities Project Authorization ? Note: 1)Timeline is for a typical 15-mi new location project 2)Project Identification consists of the development of an ‘internal’ Draft environmental document. 3)H indicates formal public hearing 6789 R/W Acq., Utility Adj. & Plans Preliminary Design Location Study & CTB Approval H 12 Final Design H Construction Advertise and Bid Construction 6

Typical Project Schedule – Ohio DOT Project Activities Pre-TIP Select Design Consult. Project Identification Select Env. Consultant Pre. Alt. Studies Feasible Alt. Studies ? 20 Select Preferred Alt. Prepare Contract Plans Clear ROW 12 Process Plans & Bid Job 5