Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
The role of information in water-related decision making.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
Overview of SMARA Responsibilities for Lead Agencies California Department of Conservation Office of Mine Reclamation Leah Gardner Senior Environmental.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Kiggavik Project Final Hearing Presentation
MNR’s Role in Public Safety Around Dams –An Overview
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
The Proposed Devolution Agreement. What is a “devolution”? de·vo·lu·tionˌde-və-ˈlü-shən alsoˌdē-və- : transference of rights, powers, property, or responsibility.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
1 Updates to Texas Administrative Code 1TAC 206 Jeff Kline, Statewide Accessibility Coordinator Texas Department of Information Resources February 8, 2012.
IN YEAR MONITORING & BUDGET PREPARATION WORKSHOP PREPARED BY BUDGET OFFICE MAY
Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License.
1 CanZinco Ltd. NWB Water Use Licence Renewal, 1AR-NAN0914 Nanisivik Department of National Defence Public Hearing October 8-9, 2014 Louis Lemay P.Eng.,
Patient Protection and Affordable Care Act March 23, 2010.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
HUMAN SETTLEMENTS PORTFOLIO COMMITTEE MORTGAGE DEFAULT INSURANCE COMPANY (MDIC) UPDATE MARCH 2013.
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
School Finances for Finance Subcommittees School Councils.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Presentation to Final Hearing Baffinland Iron Mines Corporation Mary River Project Type A Water Licence Application Nunavut Water Board Final Hearing Pond.
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Capital Improvements Element (CIE) Annual Update Adoption Public Hearing April 5, 2011.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Varteg Hill – Coal Recovery and Land Reclamation Pre-Application enquiry by Glamorgan Power Ltd. Members Seminar 31/3/14.
1 Update to Dehcho Land Use Planning Forum on Draft Changes to Interim Dehcho Land Use Plan Update to Dehcho Land Use Planning Forum on Draft Changes to.
Proposition 1 Workshop: the Grant Application Process July 2015.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
KNK5 wmoEp5 vtmp5 GwmoEp5H kNo1k5 ne6tbw5 ckE5]giz “A” wm6j5 Mwnodt5 W5J]y5 b5hjz X=8M8 xwC8 s/C4ys6t5 fxS]En8 GX=8M8f5H k9]l/4 WoExz Community Session.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
CONSULTATION GUIDELINES IMPLEMENTATION UPDATE June 2007.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Compliance, Enforcement & Emerging Risks in Environmental Law – the DMIRS Perspective Presented by Dr Phil Gorey A/Deputy Director General.
Phase 2 Hope Bay Belt Project
Office of Nuclear Materials Safety and Safeguards
Phase 2 Hope Bay Belt Project
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Meadowbank Water License Renewal
Addressing Costs of Methane Waste and Future Policy Actions
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Low-Level Radioactive Waste Forum Fall 2017 Meeting – Alexandria, VA
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
WHALE TAIL PIT Expansion Project
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk, Nunavut October 22, 2014

Presentation Outline 1.Roles and Responsibilities 2.Contributions to the Water Licence Review 3.Technical Review Comments 4.Additional Comments 5.Other Water Licensing Considerations 6.Conclusion 2

1.Roles and Responsibilities 3 a)Manage federal public land b)Participate in water licence reviews c)Inspect and enforce water licences

2.Contributions to the Water Licence Review a)Completeness review of the Type A water licence application submitted on June 9, 2014 b)Response to the Nunavut Water Board regarding the rescheduling of the Technical Meeting and Pre- Hearing Conference on July 25, 2014 c)Technical review of the Type A water licence application submitted on August 14,

Technical comments and recommendations regarding the water licence application were presented in the following themes: a)General b)Tailings Management c)Waste Management d)Management Plans e)Reclamation Cost Estimate f)Care and Maintenance 5 3.Technical Review Comments continued

a)General Lupin Mines Incorporated (LMI) requested a licence term of 10 years. Aboriginal Affairs and Northern Development Canada (AANDC) recommends: a shorter licence term of 3 years; and that the renewed licence include timelines for additional monitoring, updated studies, submission of plan updates, and progressive reclamation. 6 3.Technical Review Comments continued

b)Tailings Management There is ongoing concern of uncovered and windblown tailings at the Lupin Mine and the tailings are not being managed as required under the water licence. AANDC recommends that the water licence require: a timeline for cleaning up areas affected by windblown tailings and the progressive covering of all tailings (during operations as well as care and maintenance); and a monitoring and assessment program of the tailings containment area to assess whether the system is performing as projected in Technical Review Comments continued

c)Waste Management Hazardous Waste The site has accumulated a large inventory of hazardous materials. AANDC recommends that: the inventory of hazardous waste be updated annually; and the licence require annual removal of hazardous waste. Contaminated Soil There is no information on the quantities or characteristics of hydrocarbon contaminated soil or on how it will be managed. AANDC recommends a site assessment to determine the amount and type of contamination at the mine site. 8 3.Technical Review Comments continued

d)Management Plans AANDC requests updated management plans to: remove inconsistencies and outdated information; provide accurate information on current site conditions; and clarify information requested in the technical review. 9 3.Technical Review Comments continued

e)Reclamation Cost Estimate Updated Reclamation Cost Estimate AANDC reviewed the 2013 reclamation estimate and based on the information provided, the total reclamation liability is double what was estimated by the company. AANDC recommends that LMI provide an updated reclamation cost estimate for review prior to the Public Hearing. Flexibility to discount security held under the land lease Financial security will likely be required under Crown land leases. AANDC recommends that the renewed licence allow the Board to “discount” an amount of reclamation security held under a Crown land lease from the total amount of reclamation security required to reclaim the mine Technical Review Comments continued

f)Care and Maintenance LMI is in care and maintenance but requested flexibility to resume mining operations at any time. AANDC recommended that: i.commencement of mining operations be subject to Board approval; and ii.the Licensee be required to provide at least 90 days notice of the desire to resume mining and this should include: updated management plans; an updated reclamation cost estimate; any change in the amount of water use; and a schedule of planned activities Technical Review Comments continued

f)Care and Maintenance continued The inspection reports identified a number of issues that pose an increasing risk to the environment. AANDC recommends that the Board consider the outstanding issues and the licensee’s failure to meet licence requirements over the term of the previous licence. LMI requested a reduction in monitoring requirements. AANDC is concerned that limited presence on site would increase the risk of contamination and recommends that: existing monitoring requirements remain in the renewed licence; and all measures in the Mine Site Reclamation Guidelines for the Northwest Territories are implemented during Care and Maintenance Technical Review Comments continued

Inuinnaqtun 13

4.Additional Comments a)Submission of Management Plans b)Monitoring c)Care and Maintenance d)Progressive Reclamation e)Financial Security f)Current Status of Lupin Mine 14

a) Submission of Management Plans Specific issues should be addressed during the application process and not deferred until after licence renewal. Plans that are submitted or revised following licence renewal should be circulated for review by interested parties prior to approval and proposed activities should not occur until the Board approves the plan in writing. Submission timelines should provide adequate time for review and approval of plans Additional Comments continued

b)Monitoring of Water Quantity Water quantity information is required to understand changes to water quantity and flow on both Crown land and Inuit-owned land. A hydrometric network should be maintained throughout the life of the project to support water management during mining. Hydrometric information should meet national standards and be available to the public Additional Comments continued

c)Care and Maintenance Given that the site is not being properly maintained during care and maintenance, AANDC recommends a short term licence to ensure protection of water. During this recommended term, AANDC recommends prescriptive terms and conditions and schedules to ensure that the mine site is maintained in an appropriate manner during care and maintenance. The definition for care and maintenance in the licence should be updated to be consistent with the Mine Site Reclamation Guidelines Additional Comments continued

d)Progressive Reclamation LMI was required to implement progressive reclamation under their licence but no progressive reclamation was done and the risk to the environment continues to grow. More prescriptive terms and conditions for progressive reclamation are required during care and maintenance. The facilities and equipment at Lupin have likely degraded over time and it is unclear how much of it is still useable. AANDC requests LMI to submit an updated progressive reclamation plan detailing what facilities and equipment are no longer useable and provide a schedule for progressive reclamation. AANDC recommends that the licence also require progressive reclamation of facilities and equipment that have degraded to the point that they are no longer useable Additional Comments continued

Inuinnaqtun 19

e)Financial Security The Mine Site Reclamation Policy for Nunavut requires that security at any time during the life of the mine is equal to the outstanding reclamation liability (the estimated cost to reclaim the site if abandoned by the company). AANDC reviewed the 2013 estimate and it appears to be insufficient to cover the total outstanding reclamation liability of the mine site. LMI committed to re-evaluate the reclamation cost estimate and provide additional information by the end of August The application should not proceed any further without an updated reclamation cost estimate that is equal to the total outstanding reclamation liability during the life of the project Additional Comments continued

Inuinnaqtun 21

f)Status of Lupin Mine Manadalay Resources Corporation announced the acquisition of Elgin Mining Inc. Lupin Mine was deemed non-core to their future plans. It is unclear what this means for the Lupin Mine. AANDC recommends that LMI clarify the anticipated future use for the Lupin Mine Additional Comments continued

5.Other Water Licensing Considerations The Department suggested proposed changes to terms and conditions of the existing water licence for the Nunavut Water Board’s consideration. Mine site management does not appear to have satisfied the vision of the Mine Site Reclamation Policy or the intent of the existing water licence. More prescriptive terms and conditions are requested to ensure that the site is maintained and that water is adequately protected. The water licence should include schedules for studies, monitoring, and progressive reclamation. Responsibility for monitoring and care and maintenance should be with the Licensee. 23

Inuinnaqtun 24

6.Conclusion The Department aimed to provide a response to the applicant’s comments regarding the technical review comments and recommendations submitted on October 10, Some significant issues need to be addressed prior to the issuance of a renewed water licence. The Department will continue to work through the water licence application review process with the aim of protecting Nunavut’s freshwater resources. 25

26 Qujannamiik Thank you