A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Silicon Detector and Micromodule Production: Present Status.
Electrical and thermal testing at Glasgow and Liverpool.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Silicon Preshower for the CMS: BARC Participation
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
T.Schneider/LHCb Muon EDR
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Dec
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
ATHENA - Module Construction P. Riedler, J. Rochet.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
BM&N STS ladders assembly in VLHEP
Detector building Notes of our discussion
T. Bowcock University of Liverpool
Ladder Assembly All tools and jigs produced Glue dispensing works
Ladder Assembly All tools and jigs produced Glue dispensing works
Gluing jigs for Demonstrator
Equipment for Assembly – UK Experiences
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Design and fabrication of Endcap prototype sensors (petalet)
Planar Edgeless Silicon Detectors for the TOTEM Experiment
Module/Ladder Assembly
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Setup for testing LHCb Inner Tracker Modules
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the aluminum tile (principle) - technology of the assembly, with time estimate for each step gluing sensor to ceramic & controls gluing ceramic to Al tile. Thermal aspects alignment controls gluing hybrid to ceramic support and bonding- final tests - final tests - parts and  -module trace-ability - summary of tooling - [production schedule: see talk of P. Bloch]

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN2 Components of a micromodule, together with a photograph of a real micromodule used in beam tests  Module elements

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN3 Alignment of the silicon sensors to the aluminum tile principle: - Si sensors width ,  m; (see Dubna presentation) - ceramic support width ± 100  m; ceramic support always smaller than silicon sensor - the silicon sensor edge is used as reference for the alignment to the aluminum tile - final accuracy of the alignment of the silicon sensor to the aluminum tile is the sum of accuracy of Si - sensor cutting, accuracy of the jig and accuracy of positioning pins of the tile

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN4 Gluing of the Silicon Sensor to the Ceramic Support use two types of glue for fixing of the Si-sensor on the ceramic support and to provide good electrical contact between the Bias- line on ceramic and the backplane: - non conductive rapide Araldite-2012 (polymerization=1h ); - conductive Ag-glue E-solder 3025 (polymerization 24h); mechanical alignment of Si-sensor to the ceramic support done on table #1 with reference bars and two separated vacuum channels for fixing the sensor and the ceramic support; E3025 conductivity tested under radiation up to 500 Mrad

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN5 Positioning and Gluing of the Silicon Sensor to the Ceramic Support Materials and Process Conditions: Cleaning liquid - alcohol Conductive Ag-glue – “E-solder 3025” Nonconductive glue – “Araldite 2012 rapid” Time from glue preparation until the end of dispensing: no more than - 4 min Time of glue polymerization under vacuum clamp - 1 hour Time of complete glue polymerization - 24 hours (“E-solder 3025”) Assembling table Alignment bar Vacuum clamp for ceramic substrate Alignment bar Ceramic substrate Conductive glue Si-Sensor Vacuum clamp for Si-Sensor Nonconductive glue

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN6 HV contact resistance control Resistance of contact should be <10  Si-detector Ceramic support Al-plate Ag-glue HV electrode Vacuum sink Ohmmeter Spring contact Araldite

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN7 JINR Sensor Aligning and Gluing of the Ceramic Support to the Aluminum Tile Vacuum clamp for ceramic substrate Assembling table Alignment bar Tile fixation screw Alignment bar Al tile Glue Micromodule assembly Materials and Process Conditions: Cleaning liquid - alcohol Glue – “Araldite 2012 rapid” Time from glue preparation until the end of dispensing: no more than - 4 min Time of glue polymerization under vacuum clamp - 1 hour

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN8 Thermal aspects Local thermal contractions much smaller than spatial precision and tolerances (very different from the Tracker problem !) Main issue is to avoid stresses due to differential expansion coefficients while keeping good thermal contacts for efficient cooling Silicon sensor -ceramics support gluing : small  tested with several cycles from -30 o C to +92 o C Ceramics support- Al tile gluing Isle allowing small gluing area near the center: mechanical flexibility and controlled glue thickness. FEA shows reduction of stresses by factor >20. Tested again between -32 o C +90 o C Al tile ceramic support cylindrical isle  7 mm glue,.1 mm

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN9 Thermal tests 2000 of gluing Si-sensors on ceramic PCB Si-detector Ceramic support Al-plate Ag-glueEpoxy glue Conclusions: Experimental data after measuring of 5 Si– detectors: no visible effect of degradation of initial parameters of the detectors after change temperature in the range from –32ºC to +100ºC

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN10 A thermal test with strongly irradiated sensors Detector 1 Detector 3 Detector 2 Detector 4 s1s3 s2 s6 s4 s5 Cooling panel Coolant inlet Coolant outlet s9 Read-out chip (0.5W) Side view 2 W heater (is not shown on the right) Aluminium tile s7 s8 Ceramic support Pillar A full-scale ladder prototype was used for the test Good thermal contact and long-term stability of 4 strongly irradiated sensors 400V reverse bias T=-5 o C

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN11  -modules Optical Control of Alignment - Main function of the positioning table is to provide a coordinate system, attached to the invisible positioning pins of  -module - The coordinates system (X,Y) is set by two reference points of the positioning table - Metallization of the detector is a reference for alignment control - Distances X’, Y’ and X” are measured and compared with theoretical values Lens #1 Lens #2  -module Special positioning table Positioning pins Reference point of the table Reference line of the table

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN12 Accuracy of the Prototype  -modules Assembling Optical control Quality control tests on  -module: - cross check by optical method of 1 in 20  -modules in the pre-production; - cross check by optical method of 1 in 100  - modules in the production; - optical control will be done in one center - Alignment Control Center 60  max error in agreement with overall tolerance (see EDR)

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN13 Readout hybrid Readout hybrid production workflow already described by A. Peisert Readout hybrids -fully tested and burnt in- are distributed to regional centers Low alignment precision required ~0.5mm (pitch 1.9mm) Mechanical jig to position using the Al tile pillars as reference Gluing with fast epoxy

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN14 Bonding (1) Vacuum jig supporting the tile under bonding pads. Was used in beam test.

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN15 Bonding (2) Technical Specifications for Bonding (PRR document) define: Bonding specifications (wire, loop height & form, pull strength….) Working environment Bonding Procedure (2 bonds per strip,...) Quality assurance tests visual inspection on bonding machine and under microscope bonding pull tests on test bonds with a dynamometer Bonding exercise using small boards sent back to CERN for control successfully done by all regional centers ( waiting for BEL ) Bonding time not an issue (only 66 bonds), dominated by manipulations (~ minutes) Could be improved by bonding several sensors in a row

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN16 Final tests Make sure Silicon sensor did not suffer Check the connectivity and # of working channels IV test up to 300/500V (total current) “Basic functionality test “ using simplified motherboard connected by RS232: pedestal events (noise) electric test pulse with and without bias (connectivity) infrared Laser tests with moving stage (may be at reception at CERN) DAQ rate ~ 10 Hz, all strips tested in parallel : <15 minutes per micromodule Micromodule ready for shipping to CERN in a special box under design

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN17 Traceability Each part sensor ceramic tile hybrid (and FE electronics) has a barcode number. Keep full record of all part of micro-modules Will be presented in detail by A.Go

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN18  -module Assembling Tools 1. Vacuum jig for alignment and gluing of the silicon sensor to the ceramic support 2. Vacuum jig for alignment and gluing of the ceramic support to the aluminum tile 3. Jig for the  -modules Alignment Optical Control 4. Jig for alignment and gluing of the readout hybrid to the  -module 1 3 2

A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN19 Conclusions Tooling for the  modules assembling and Quality control  procedure  of  the  module assembling is well defined. Prototypes have been made. Assembling time : 5 per day (per centre) seems feasible