15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK

Slides:



Advertisements
Similar presentations
E. Ferro, CNAF, aprile LCFG: testbed upgrade Enrico Ferro INFN-LNL.
Advertisements

Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
LCFG overview and future Michael George University of Liverpool
Andrew McNab - Manchester HEP - 10 May 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –What are other sites doing? –What are.
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
LNL CMS M.Biasotto, Bologna, 29 aprile LNL Analysis Farm Massimo Biasotto - LNL.
German Cancio – WP4 developments Partner Logo WP4-install plans WP6 meeting, Paris project conference
Birmingham site report Lawrie Lowe: System Manager Yves Coppens: SouthGrid support HEP System Managers’ Meeting, RAL, May 2007.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Presented by: Yash Gurung, ICFAI UNIVERSITY.Sikkim BUILDING of 3 R'sCLUSTER PARALLEL COMPUTER.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
IFIN-HH LHCB GRID Activities Eduard Pauna Radu Stoica.
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
The EDG Testbed Deployment Details The European DataGrid Project
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
EDG LCFGng: concepts Fabric Management Tutorial - n° 2 LCFG (Local ConFiGuration system)  LCFG is originally developed by the.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
UCY HPCL Introduction to the CrossGrid Testbed George Tsouloupas UCY HPCL.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
Batch Scheduling at LeSC with Sun Grid Engine David McBride Systems Programmer London e-Science Centre Department of Computing, Imperial College.
Steve Traylen Particle Physics Department EDG and LCG Status 9 th December 2003
6/26/01High Throughput Linux Clustering at Fermilab--S. Timm 1 High Throughput Linux Clustering at Fermilab Steven C. Timm--Fermilab.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
EDG Testbed installation and configuration with LCFGng Maite Barroso - WP4
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Installing, running, and maintaining large Linux Clusters at CERN Thorsten Kleinwort CERN-IT/FIO CHEP
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2 [Including slides prepared by Lex Holt.]
22nd April 2002 Steve Traylen, RAL, 1 LCFG Installation Steve Traylen. LCFG – A tool for installation and configuration. UK HEP SYSMAN,
University of Bristol 5th GridPP Collaboration Meeting 16/17 September, 2002Owen Maroney University of Bristol 1 Testbed Site –EDG 1.2 –LCFG GridPP Replica.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
C. Aiftimiei, E. Ferro / January LCFGng server installation Cristina Aiftimiei, Enrico Ferro INFN-LNL.
Jens G Jensen RAL, EDG WP5 Storage Element Overview DataGrid Project Conference Heidelberg, 26 Sep-01 Oct 2003.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
December 26, 2015 RHIC/USATLAS Grid Computing Facility Overview Dantong Yu Brookhaven National Lab.
Status of the Bologna Computing Farm and GRID related activities Vincenzo M. Vagnoni Thursday, 7 March 2002.
LCG LCG-1 Deployment and usage experience Lev Shamardin SINP MSU, Moscow
E. Ferro, CNAF, april Enrico Ferro INFN-LNL Installation of a LCFG server.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
The 2001 Tier-1 prototype for LHCb-Italy Vincenzo Vagnoni Genève, November 2000.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Progress report from University of Cyprus.
The EDG Testbed The European DataGrid Project Team
CNAF Database Service Barbara Martelli CNAF-INFN Elisabetta Vilucchi CNAF-INFN Simone Dalla Fina INFN-Padua.
Testing CernVM-FS scalability at RAL Tier1 Ian Collier RAL Tier1 Fabric Team WLCG GDB - September
CERN 19/06/2002 Kickstart file generator Andrea Chierici (INFN-CNAF) Enrico Ferro (INFN-LNL) Marco Serra (INFN-Roma)
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
10/18/01Linux Reconstruction Farms at Fermilab 1 Steven C. Timm--Fermilab.
II EGEE conference Den Haag November, ROC-CIC status in Italy
CNAF - 24 September 2004 EGEE SA-1 SPACI Activity Italo Epicoco.
Quattor installation and use feedback from CNAF/T1 LCG Operation Workshop 25 may 2005 Andrea Chierici – INFN CNAF
WLCG IPv6 deployment strategy
The EDG Testbed Deployment Details
UK GridPP Tier-1/A Centre at CLRC
Alice Software Demonstration
The EU DataGrid Fabric Management Services
Presentation transcript:

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report2 Previous RAL Test Bed First site started as testbed0 in July 2001, ran Globus 2 - alpha 15 from November Second site running from December 2001, running Globus 2 - beta 21. Total twelve dual 800 MHz PIII, 500Mb RAM, 30Gb. Redhat’s Kickstart and post install scripts used for Installation. Jobs submitted from UI at Manchester and CERN, onto CERN’s resource broker and executed on a local compute element at RAL.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report3 RAL Test Bed From ten to twelve nodes. Dual 800 MHz PIII. 500 MB of RAM. 30 GB Hard Disks.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report4 Current RAL Test Bed Based on European Data Grid release TB Compute Element(CE), Storage Element(SE), User Interface(UI) and Information Node(IN). Some elements of the software are non-functional. Next EDG release TB1.1.0 will be soon. Installation still based on Kickstart. Reconfiguring generally requires a reinstall from scratch.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report5 Introduction of LCFG LCFG enables fine configuration of a group of machines both at installation and for the onward management from a single LCFG server. LCFG server provides XML profiles for individual clients built up from nested configuration files. Clients contain many LCFG modules; e.g. inet, boot, auth, xntpd, … that interpret the XML profile and configure the relevant parts of the OS. Extra custom modules can be added such as the EDG’s globus module.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report6 LCFG at RAL An LCFG server is now maintaining a private EDG 1.0 WN, SE, CE and UI. LCFG will be rolled out at RAL around EDG LCFG took one or two weeks to learn and set-up before EDG could be installed. No transitional phase exists between Kickstart and LCFG. Security must be improved for production environments, e.g. LCFG requires NFS, distributes root’s password over http.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report7 New Test Bed LCFG exists on newer rack. Some new EDG releases will be installed on this rack. 14 Dual 1 GHz PIII. 500 MB RAM 40 GB Disks. Gigabit Ethernet.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report8 LCFG at RAL LCFG will enable both small and large software upgrades. Existing packages can be reconfigured, packages can be added or removed. This is not possible with a Kickstart box. Adding a new node is trivial. Replacement of boot floppies with network PXE boot will ease hardware issues. The LCFG tutorial and manuals need to be improved with some configuration detail. A central LCFG server maybe possible.

15-Feb-02Steve Traylen, RAL WP6 Test Bed Report9 Summary Documentation is getting better. Software releases are constant, its easy to miss a bug fix or a new dependency. LCFG, once installed, does make life easier. All components have worked but never all at the same time or consistently with CERN. Repeated node registration. (RB, GIIS, GDMP, VO) Security Improvements, GDMP, LCFG profiles.