ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.

Similar presentations


Presentation on theme: "ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the."— Presentation transcript:

1 ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the ScotGRID Project Phase1 of the ScotGRID Project Phase1 of the ScotGRID Project Introduction: ScotGRID Goals Introduction: ScotGRID Goals

2 The LHC Computing Challenge for Scotland 2000: JREI Bid The JREI funds will make possible to commission and fully exercise a prototype LHC computing centre in Scotland The Centre would provide: 1. Technical service based for the grid services 2. DataStore to handle samples of data Analysis 3. Significant simulation production capability 4. Excellent network connection RAL / Regional sites 5. Support grid middle devel. with CERN/RAL 6. Support core software devel. within LHCb/ATLAS 7. Support user applications in other scientific areas This will enable us to answer:  Grid viable solution for LHC computing challenge,TDR  Can a two-site Tier-2 centre be setup and operate effectively  How can network topology between Ed,GL, RAL & CERN This will enable us to answer:  Grid viable solution for LHC computing challenge,TDR  Can a two-site Tier-2 centre be setup and operate effectively  How can network topology between Ed,GL, RAL & CERN ScotGRID: The Spirit of the Project http://www.scotgrid.ac.uk/

3 2002 200520042003 Q1 Q2 Q3 Q4 2001 Q4 PrototypeToProductionPrototypeToProduction Delivery of more Kit… End of JREI funding Start of ScotGRID-II Start of GridPP-II Links to other applications … Production Tier-2 Site Time-Line for a Production Tier-2 & beyond Completed: Phase1Phase2 Future Upgrades ?

4 Hardware Applications Middleware ScotGRID Processing nodes at Glasgow 59 IBM X Series 330 dual 1 GHz Pentium III with 2GB memory 2 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory 3 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory 1TB disk LTO/Ultrium Tape Library Cisco ethernet switches ScotGRID Storage at Edinburgh IBM X Series 370 PIII Xeon 70 x 73.4 GB IBM FC Hot-Swap HDD

5 ScotGrid reached ~ 580,000th processing hour Tier-2 Web-Based Monitoring http://www.scotgrid.ac.uk /

6 ScotGrid accumulated stats ScotGrid accumulated stats Significant non-LHC application use Q1 Q2 Q3

7 ScotGrid JREI project includes a mid- term hardware upgrade. As part of GridPP planning, we need to upgrade from Prototype to Production Tier 2 status by 2004. JREI funding left to be spent by June 2003: è Edinburgh £220k è Glasgow £30k £250k ScotGRID Phase-2 : Just Started

8 Upgrade Database Server in Edinburgh xSerier 440 (8 Way 1.9GHz Intel Xeon, 1MB L3 Cache, 32GB Memory, 36GB Internal Disk) 16 – 20 TB of Disk Storage in Edinburgh FAStT700 or FAStT900 ( see next slide ) 5 TB of Disk Storage in Glasgow Agreed to relocate existing FAStT500 from Edinburgh to Glasgow Edge Servers for Edinburgh EDG SE:1 from Glasgow (x340) LCFG, CE: 2* x205, 1 x 1.8 GHz, 256MB, 40GB Summary of ScotGRID Upgrade New Kit for Glasgow CDF & eDIRT Kit

9 20TB vs. 18TB Storage System

10 Dual FastT900 + 24 TB IBM@server: xSeries 440 8* Xeon IBM@server (1.9GHz) 32 GB, Scalable configuration x340 dual PIII/1 GHz /2 Gbyte RH7.3 x205 P4/1.8 GHz /256 MB RH7.3 x205 P4/1.8 GHz /256 MB RH7.3 Storage Nodes CE LCFG ScotGRID-Edinburgh: Schematic Fibre connection Gbps

11 The CDF kit has 1 rack with only UPS 1 rack with 10 Dell dual Xeon 2.4 GHz 4GB, 7.5 TB disk, UPS 1 rack with IBM x370 8 of 700 MHz Pentium III with 8GB, 1 TB via FAStT500, UPS 1 tape library ScotGRID-Glasgow: CDF Kit IBM: http://www.xcat.org/http://www.xcat.org/ CDF: http://www.scali.com/

12 The eDIKT kit has: http://www.edikt.org/  4th rack on the right and has  6 IBM x335 (1U high) dual Xeon 2.4 GHz and 1.5 GB memory  2 IBM BladeCentres (7U high) each with 14 Blades x335 dual Xeon 2.4 GHz and 1.5 GB memory ScotGRID-Glasgow: eDIKT Kit

13 Possible ScotGRID Config Cluster Worker nodes Front-end Globus gatekeeper + job manager Globus GRIS EDG Job Grid Manager Information Providers: queues, jobs, users PBS Working Directories /session1 /session2... GridFTP Storage Element (GridFTP) control connection data connection Globus Replica Catalog GIIS Cluster Tier2 GateWay (Broker) A u t h Virtual Org. Catalog

14 Summary of Tier-2 ScotGRID Project  Have Successfully completed Phase-1  ScotGRID had been upgraded – Phase-2  eDIRT Kit, CDF Kit  HPS + Larger DataStore  ScotGRID: will concentrate on commissioning the new hardware during the next few month. before going to EDG2.0  There will be an ad. for ScotGRID Technical Coordinator  We will have to start to think about restructing the ScotGRID team for production running – early next year  In the New Year plan to integrate the Durham CPU Farm

15 BackUp Slides

16 Internet VLAN 10.0.0.0 VLAN 100 Mbps 1000 Mbps MasternodeStorage NodesHead Nodes Compute Nodes Campus Backbone 59 x330 dual PIII 1GHz/2 Gbyte x340 dual PIII/1 GHz /2 Gbyte x340 dual PIII/1 GHz/0.5 Gbyte ScotGRID-Glasgow: Schematic

17 Disk Arrays(Total 4.6 Tb) FastT 500 Storage Controller Server (4*Pentium Xeon, 16Gb RAM) SRIF Network ScotGRID-Edinburgh: Schematic


Download ppt "ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the."