Task 3.5 Tests and Integration (http://ific.uv.es/grid/CROSSGRID-IFIC/) Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.

Similar presentations


Presentation on theme: "Task 3.5 Tests and Integration (http://ific.uv.es/grid/CROSSGRID-IFIC/) Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la."— Presentation transcript:

1 Task 3.5 Tests and Integration (http://ific.uv.es/grid/CROSSGRID-IFIC/) Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz Institut de Física Corpuscular Universitat de Valencia - CSIC Spain

2 Summary Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 1 Goals Partners of this task and Integration Team Infrastructure Tasks software Dependencies between this task and other WP's or Grid projects IFIC's Infrastructure as CrossGrid testbed (http://ific.uv.es/grid/)http://ific.uv.es/grid/ Time schedule

3 Goals Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 2 To deliver a release version of WP3 before each prototype. To combine the Crossgrid middleware and Globus services to provide a functional Computing platform Test all tools and services of WP3 The integration and validation phase will require significant effort from all of the tasks

4 Partners and Integration Team Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 3 Partners CYFRONET PSNC UAB CSIC CSIC Santander CSIC Valencia U. A. Barcelona PSNC, Poznan CYFRONET, Cracow

5 Partners and Integration Team Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 4 Who? Miroslaw Kupczyk 3.1 Miquel A. Senar 3.2 Brian A. Coghlan 3.3 Jacek Kitowski 3.4 S. González 3.5 ?? Where is information available ? http://www......http://www When are the meetings? (For example, via VRVS)

6 Infrastructure Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 5 CVS Repository Package Repository Support Tools Task3.1: Portal, What is the Delivery? Task3.2: Grid resource management Task3.3: Grid monitoring Task3.4: Large data manipulation Source and binary RPM's Access via HTTP Docs Contac list Bug/incident tracking system (Bugzilla) CVS project database management, where?? see for example: http://datagrid.in2p3.fr/cgi-bin/cvsweb.cgi/ http://marianne.in2p3.fr/datagrid/testbed1/repositories/pkg-repository.htmlhttp://marianne.in2p

7 Tasks Software Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 6 Task 3.1: Portal access to the Grid independetly from the user location: 1 It will use existing tools developed by other projects: GRAM, MDS, etc.. (standard elements from Globus), LDAP, XML, etc... 1 From the integration point of view, important to define interfaces between two parties (to connect all tools developed in the WP3 and in WP2 and providing easy access to the applications deployed by WP1). Task 3.2: Construction of new resource management techniques for parallel applications submitted to a Grid based on scheduling agents. Task 3.3: Design specification of the monitoring tool. Task 3.4: Data management and archiver systems.

8 Dependencies Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 7 WP4 (International Testbed Organisation): This task is very stronly correlated with the prototypes released in WP4 because the testbed will provide the framework to run the applications made in the differents WP's. WP1 (CrossGrid Application Development) and WP2 (Grid Application Programming Environment): All tools and services of WP3 will be used by the aplications. European DataGrid project: The WP6 (Testbed and Demonstrators) and more concretly with the Integration Team because they are doing the tests and integration of the DataGrid middleware at the moment. (http://marianne.in2p3.fr).

9 IFIC's Infrastructure Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 8 The IFIC is participating in the DataGrid project. We are working togheter other Spanish groups in the WP6 (http://ific.uv.es/grid/DATAGRID-SPAIN/).http://ific.uv.es/grid/DATAGRID-SPAIN/ So, the IFIC is working in a DataGrid testbed at the moment, with the corresponding software. 134 Pc's running Linux 6.2 with 40 Gb disk space per machine. Globus 2 (beta 21 version) is running. Condor 6.2.1 as batch system is running.

10 IFIC's Infrastructure Our farm Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 9 The IFIC has the minimum hardware required for the deployment of a local CrossGrid testbed: GIIS (Grid Index Information Service) machine, Dedicated 100 Mbps switch, More than three machines (standard type, PIII>1GHz, 512 Mb RAM, HD40GB), One CA (Certification Authority) machine per country.

11 Our farm Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 10

12 Our farm Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 11 K7 @1.4 Ghz, 1Gb RAM, 40 GBytes, network 100 and 2U height 100 Mbps switch for each rack

13 Our farm Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 12 GIIS (Grid Index Information Service) machine: The Globus host is the GIIS of a country or an institut. We recommed to install the Institut GIIS on a machine without gatekeeper (IFIC GIIS mds.ific.uv.es). This GIIS has to register itself to the Spanish (Country ) GIIS. The Spanish GIIS is the top level of Proyecto Datagrid España. The Spanish GIIS is grid001.ifca.unican.es, port 2166 and it is registered to the European GIIS (tesbed001.cern.ch). CA (Certification Authority) machine per country: In Spain the Certification Authority is IFCA (Instituto de Física de Cantabria) in Santander. The IFIC has personal certificates for the users and machine certificates for the gatekeepers.

14 Time Schedule Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 13 Milestones: 1 Month 3: To define The integration team and the CVS database. 1 Month 6: Co-ordination established with other WP and projects (WP4 Testbed Organisation). 1 Month 10-12: First delivery version of WP3 prototype running in distributed local mode (First tests of the alpha software versions). 1 Month 18: Component integrations on local grid (monitors, managers, applications and tests of the beta versions). 1 Month 24: Integration on the International CrossGrid Testbed 1 Month 33: Final deployment in CrossGrid.

15 Time Schedule Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la Hoz 14 Deliverable documents: 1 Installation Guide (by The Integration Team); The aim of this document is to give an overview of the WP3 Middleware released for Prototype 0 and 1 as well as to lead site administrators through the whole installation, configuration and customization process. 1 Crossgrid WP3 Reports; The correspondent deliverable reports of the WP3 (Current situation, issues, partner details, meetings, etc..)


Download ppt "Task 3.5 Tests and Integration (http://ific.uv.es/grid/CROSSGRID-IFIC/) Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la."