Tracking R&D at SCIPP: Charge Division Long Ladder Readout Noise Non-Prompt Tracks with SiD CERN Linear Collider Workshop October 18-22 2010.

Slides:



Advertisements
Similar presentations
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
ILC R&D at SCIPP: Progress Report De-scoped ($97.5K) Proposal Activities Radiation Hardness for BeamCal sensors (new; with SLAC) KPiX/Double Metal Performance.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Highlights from the Tracking Sessions 12 talks in three sessions Rough accounting: ILD SiD Generic OR- Gaseous Solid State
E cm up to 1 TeV, de- pending on site chosen Design luminosity of 2x10 34 cm -2 s -1 Beam spot: 550x5.7 nm Crossings every 337 ns for about 1  s; repeats.
Search for Long-Lived Particles at DØ Todd Adams Florida State University July 19, 2005 SUSY05 IPPP Durham.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
1 Adventures In Calorimeter Assisted Tracking Chris Meyer, Tyler Rice UC Santa Cruz October 16, 2007.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
ATLAS SCT module performance: beam test results José E. García.
MC Study on B°  J/  ° With J/      °     Jianchun Wang Syracuse University BTeV meeting 03/04/01.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Silicon Microstrip R&D at SCIPP and the University of California at Santa Cruz Future Linear Colliders Spanish Network Universidad de Sevilla February.
D 0 Measurement in Cu+Cu Collisions at √s=200GeV at STAR using the Silicon Inner Tracker (SVT+SSD) Sarah LaPointe Wayne State University For the STAR Collaboration.
SiD Tracking Simulation: Status and Plans Richard Partridge for the SiD Tracking Group Vancouver Linear Collider Workshop July 19-22, 2006.
ILC Tracking R&D at SCIPP SiD Workshop Thursday, June Bruce Schumm Santa Cruz Institute for Particle Physics.
Chevron / Zigzag Pad Designs for Gas Trackers
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
R&D Towards a Linear Collider Detector DOE Site Visit Wednesday July 27, 2011 Senior: Fadeyev, Schumm, Spencer Students: Bogert, Carman **, Chappelletvolpini.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Studying Very Light Gravitino at ILC Collaborators: T. Moroi (Tokyo) [for basic idea: arXiv: ] & K. Fujii (KEK), T. Moroi (Tokyo), T. Suehara (ICEPP)
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
LCWS11 – Tracking Performance at CLIC_ILD/SiD Michael Hauschild - CERN, 27-Sep-2011, page 1 Tracking Performance in CLIC_ILD and CLIC_SiD e + e –  H +
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
07/24/07 Francisco Carrion OPTIMIZING THE TRACK DETECTOR Francisco Javier Carrión Ruiz Mentor: Hans Wenzel 07/08/09 SID CONCEPT FOR THE INTERNATIONAL LINEAR.
STAU CLIC Ilkay Turk Cakir Turkish Atomic Energy Authority with co-authors O. Cakir, J. Ellis, Z. Kirca with the contributions from A. De Roeck,
Kalanand Mishra February 23, Branching Ratio Measurements of Decays D 0  π - π + π 0, D 0  K - K + π 0 Relative to D 0  K - π + π 0 decay Giampiero.
Régis Lefèvre (LPC Clermont-Ferrand - France)ATLAS Physics Workshop - Lund - September 2001 In situ jet energy calibration General considerations The different.
Oct/12/07 Su DongSiD Tracking Meeting1 Thoughts on VXD Sensor Configuration Su Dong.
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
A novel two-dimensional microstrip sensor for charge division readout D. Bassignana, M. Lozano, G. Pellegrini CNM-IMB (CSIC) M. Fernández, R. Jaramillo,
A novel two-dimensional microstrip sensor with charge division readout M. Fernández, R. Jaramillo, F.J. Muñoz, I. Vila IFCA (CSIC-UC) D. Bassignana, M.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Tracking: An Experimental Overview Richard Partridge Brown / SLAC Fermilab ALCPG Meeting.
I.Rashevskaya- SVT Meeting - Frascati SuperB SVT Strip Pairing: impact on the capacitance value Irina Rashevskaya, Luciano Bosisio, Livio.
L. Bosisio - 2nd SuperB Collaboration Meeting - Frascati SuperB SVT Update on sensor and fanout design in Trieste Irina Rashevskaya, Lorenzo.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
QWG Sept 20-22, Jundong Huang Indiana University 1 DØ Quarkonium Production at DØ Jundong Huang Indiana University Quarkonium Workshop FermiLab September.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
Time-Over-Threshold Readout Long Ladder Readout Noise
Non-Prompt Tracks with SiD BeamCal Radiation Damage Studies (Proposal)
Integration and alignment of ATLAS SCT
SuperB SVT Definition of sensor design and z-side connection scheme
Pixel-strip-EMC tracker and DC option
ILC Instrumentation R&D at SCIPP
The LHC collider in Geneva
The KL reconstruction for the Belle experiment at KEK B-factory
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Presentation transcript:

Tracking R&D at SCIPP: Charge Division Long Ladder Readout Noise Non-Prompt Tracks with SiD CERN Linear Collider Workshop October

Charge Division Can a longitudinal coordinate be measured with microstrip sensors? Explore with PC-board microstrip mock-up and PSpice simulation

Final step: practical detectors are not isolated strips. Include two nearest-neighbors in simulation: Network effects lead to ~5% reduction in longitudinal resolution.

Long-Ladder Readout Noise Probe conventional notions about dependence of readout noise on distributed capacitance and series resistance

Standard Form for Readout Noise (Spieler) Series Resistance Amplifier Noise (series)Amplifier Noise (parallel) Parallel Resistance F i, F v are signal shape parameters that can be determined from average scope traces. Dominant term for long ladders (grows as L 3/2 )

Expected Noise vs. Ladder Length Series noise expected to dominate for narrow (50  m) pitch sensors above ~25 cm long

Sensor “Snake”: Read out up to 13 daisy-chained 5cm sensors (with LSTFE-1 ASIC) Sensor “Snake” LSTFE1 chip on Readout Board Can read out from end, or from middle of chain (“center-tap”)

Expected for end readout (Spieler formulation) Observed: End readout Center tap PSpice predictionsEnd readout (include network effects) Center tap Comparison of Results and Expectations PSpice simulation is “first pass” (crude amplifier model; parasitic effects not yet incorporated, etc.)

Non-Prompt Tracking with the SiD Explore performance via explicit signature: Metastable stau NLSP (Gauge-Mediated SUSY)

Reconstructing Metastable Staus w/ SiD Gauge-Mediated SUSY Large tract of parameters space as stau NLSP Metastable (  c  stau ~ centimeters) is in cosmologically preferred region Process is with

Reconstructing Metastable Staus w/ SiD Start with: 5+1 layers for inside track 4 layers for outside track  Restricted range in r decay for now; will expand soon

Measuring Staus with the SID Stau sample: 11.1 fb -1 of e + e -  stau pairs with m stau = 75 GeV E cm = 500;   = 90 fb  c  = 23 cm Background sample: 5.3 fb -1 combined SM background

Reconstructing Metastable Staus w/ SiD Focus initially on r decay = cm… Reconstruct decays by requiring: - Outer hit of primary track on first tracker layer - Inner hit of non-prompt track on second tracking layer - Both tracks be on the same side of the Barrel (in z) - The sign of the track curvatures match - Non-prompt track curvature larger than the primary - Tracks have a geometric intersection in the x-y plane Of 294 staus with 22<r dec <27 and |cos  | < 0.5, 239 staus are reconstructed, of which 232 truth-match

Stau Reconstruction Efficiency Truth-Matched Staus

Signal to Background for 10 fb -1 Truth-matched stau: 210 Background kinks: 1338 Perhaps slight preference for background kinks to show up at material layers at 22 and 47 cm 22cm 47cm

Signal to Background (10 fb -1 ) Kink angle Curvature ratio

Signal to Background (10 fb -1 ) Good separation between signal and background for #tracks/event and track p t #Tracks/event p T of prompt track

Wrap-Up Charge Division: Longitudinal resolution of  z =6mm seems achievable for a 10cm-long sensor. Long Ladder Readout Noise: Simulation and data show significantly less readout noise for long ladders than expected. “Center-tapping” yields even further reductions. Non-Prompt Tracks with SiD: Reconstructing clean metastable stau signature between first and second tracking layer seems quite plausible. Beginning to look in different radial regions.