RaDIATE Admin Meeting October 2014 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)
HiRadMat Beryllium thermal shock test Kavin Ammigan PASI 2 nd Annual Meeting RAL, UK April 2013 Contributors: P. Hurh, B. Hartsell.
IPASI Collaboration High Power Targets Chris Densham & Patrick Hurh Targets Working Group Co-conveners 1.RaDIATE Collaboration 2.UK-PASI programme 3. Collaborative.
PASI WP1 PASI meeting April 2013 WP1 progress report D.M.Jenkins.
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Outline agenda for 2 nd RaDIATE Collaboration Meeting (Draft 2) C. Densham P.Hurh.
RaDIATE Meeting February /21/14P. Hurh RaDIATE Feb 2014 Meeting 1.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
F. Pellemoine PASI Workshop - April 3-5, 2013 Capabilities of NSCL - FRIB.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015.
Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
RaDIATE 1 st Annual Collaboration Meeting May Welcome and News & Notes Radiation Damage In Accelerator Target Environments.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
Lessons learnt at 5 th High-Power Targetry Workshop Fermilab, May 2015 Federico Carra EN-MME ColUSM
HRMT24 BeGrid – Technical Review P. Hurh 1, B. Hartsell 1, B. Zwaska 1, K. Ammigan 1, C. Densham 2, A. Atherton 2, M. Fitton 2, J. O’Dell 2, T. Davenne.
RaDIATE Meeting December /13/12P. Hurh RaDIATE December 2012 Meeting 1.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
CARRUTHERS LSC 3/20/06 1 LIGO-G M The View from NSF Tom Carruthers LIGO Program Officer National Science Foundation (703)
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
RaDIATE March 2015 Admin Meeting P. Hurh Fermilab 20 March 2015.
RaDIATE Meeting September /22/13P. Hurh RaDIATE July 2013 Meeting 1.
NBI CERN Experimental Assessment of Radiation Damage in Targets Considered in Neutrino Superbeam and Neutrino Factory Initiatives N. Simos, BNL.
RaDIATE Meeting July /22/13P. Hurh RaDIATE July 2013 Meeting 1.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
DTC Status Report. Status Report DTC Charter was signed on 15 September. Don Berchoff is in the process of setting up DTC Executive Committee. Likely.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
RaDIATE Meeting February /20/13P. Hurh RaDIATE February 2013 Meeting 1.
RaDIATE Meeting March /20/13P. Hurh RaDIATE March 2013 Meeting 1.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
RaDIATE Meeting May /28/13P. Hurh RaDIATE May 2013 Meeting 1.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
RaDIATE February Technical MeetingFebruary BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
FETS-HIPSTER A High-Flux Proton Irradiation Facility Steve Roberts (University of Oxford) Chris Densham (RAL), Alan Letchford (RAL), Juergen Pozimski (Imperial.
HIGH POWER TARGETS AND MACHINE/DETECTOR INTERFACE WORKING GROUP SUMMARY REPORT PASI 2012 Workshop, 1/14/12 Co-conveners: C. Densham, P. Hurh, J. Thomas,
6th High Power Targetry Workshop 11th -15th April 2016 Merton College, Oxford Chris Densham.
ORNL is managed by UT-Battelle for the US Department of Energy High Power Targets for Accelerator Based Research Facilities Bernard Riemer Spallation Neutron.
BLIP capsule update Beryllium, Graphite, Titanium K. Ammigan
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
1 Status Report: Experimental investigation of beryllium. October 2014 Viacheslav Kuksenko, Steve Roberts University of Oxford, UK.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Irradiated T2K Ti alloy materials test plans
HiRadmat requests A. Fabich MSWG, 30. January 2015.
Overview of radiation damage studies and the RaDIATE Collaboration
Advanced Test Reactor National Scientific User Facility/NEUP Interface
“hot spots” SIS100 internal beam dump Super-FRS production target
Materials for extreme thermal management (PowerMat)
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Budget & Planning Calendar.
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Welcome Update on ESS Construction Project
Student Assignment Review Advisory Committee
Instructional Planning Council October 5, 2018
Presentation transcript:

RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1

Agenda RaDIATE News and Notes NSUF experiment proposal HiRadMat BeGrid Status NBI Workshop (Sept 2014) IWSMT Workshop (Oct 2014) MatX Workshop (Nov 2014) High Brightness Workshop (Nov 2014) ESS Milestone reached MOU Revision Status Status Updates Beryllium (Slava K.) Graphite (Nick S. & Kavin A.) Tungsten (Chris D.) FRIB/MatX studies (Graphite, Ti alloy; Frederique P.) Ideas for next Technical Meetings (March & April) 2 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting

RaDIATE News NSUF Experiment Proposal Experiment to irradiate Be at Michigan Ion Beam Laboratory to simulate NuMI beam window conditions PI’s: D. Senor (PNNL), G. Was (Mich), S. Roberts (Oxford), V. Kuksenko (Oxford), P. Hurh (FNAL) Pre-proposal submitted October 2 Utilizes NE funding for facility access only (irradiation and PIE) 3 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting

RaDIATE News HiRadMat Be experiment (“BeGrid”) status Scientific and Technical (safety) Board Reviews next week at CERN Design by Andrew Atherton at RAL has progressed well Talk by Kavin Ammigan at NBI has good description Current hurdles: Strain gauge DAQ system Be sample manufacture (witness samples late by 4 weeks) In-situ, on-rig beam position monitoring (foils and camera?) 4 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting

RaDIATE News NBI Workshop held at Fermilab in September Neutrino Beams and Instrumentation Several good talks on neutrino targets Talks available online: Upcoming Workshops: IWSMT Workshop (Oct 2014) – Spallation Materials MatX Workshop (Nov 2014) – Materials in Extreme HB Workshop (Nov 2014) – High Brightness Beams /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting

RaDIATE News ESS Milestone Reached Construction started in September Foundation Stone Ceremony Today! 6 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting

MOU Status Revision text finalized Slight edit results in draft 6 Still need GSI signatory information (M. Tomut?) US DOE Labs should be submitting to site offices and then to DOE HQ for approval to sign (largest hurdle) Then MOU signing “tour” 12 original hard copies required? CERN will hopefully be added in following addendum next year 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 7

Status Reports Beryllium update (V. Kuksenko) Graphite update (N. Simos & K. Ammigan) Tungsten update (C. Densham) FRIB materials studies (F. Pellemoine) 8 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting

Technical Meeting Topics What should be the next 2 tech meeting topics? November: EDXRD studies at BNL – N. Simos? In-situ He irradiation of Be at MIAMI – V. Kuksenko? December: Differences in High Energy Proton irradiations and Low Energy (fission reactor) irradiations and Fast Ion irradiations (speaker?) The effects of He gas production in metals (graphite?) (speaker?) Other ideas? 10/09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 9