1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.

Slides:



Advertisements
Similar presentations
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Agency Charging Statement Overview of Consultation 11 th February 2008.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
Proposed publication of objection rates for LSP Supply Points On behalf of Gazprom Marketing and Trading-Retail.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
UNC Modification Proposal 0192 National Grid Distribution Proposal 0182: “ Introduction of DNO obligations to facilitate resolution of unresolved USRVs”
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Options for Mod 640 Replacement
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
Removal of redundant legacy standards
Must Read Process Guide For Shippers
Modification Proposal 0192 – Draft Business Rules.
Confirmation Notice Period for Certain ‘Unique’ Sites
Assignment Workshop 2 16th September 09, Solihull.
Project Nexus Workgroup
Connected System Exit Points Administration Options
Project Nexus Workgroup
RAASP – Solution Options Scenario Comparison
User Pays – Changed & New Services
Action: DX0602 Xoserve; to look to provide performance related data appertaining to the confirmations / reconfirmations process. The following values are.
Modification 0117 – Additional Considerations
Connected System Exit Points Administration Options
Distribution Workgroup 8 August 2012 Joanna Ferguson
Topic raised at July 2009 Distribution Workstream
xoserve core + user pays discussion
Project Nexus Workgroup
Interruptible to Firm – NTS Supply Point Transition
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Deferral of Retrospective Updates Functionality
Lessons Learnt UKLC - November 2015
Project Nexus Workgroup
DN Interruption Phase II
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
Entry Capacity Transfers - Constrained Period
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Transmission Workstream 05 November 2009
Retail Energy Code - Data Access Schedule
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at a point in time) for meter point asset and read information for the current registered user for a defined period prior to their current registration of the relevant supply point Shippers have advised that there is a requirement for this meter point asset and read information for the period prior to the relevant supply point registration to be available on a more frequent basis to allow the timely resolution of any data discrepancies. Two feasible options have been identified.

2 Mod options Option 1a –Extend permission in UNC to make the data available on an ongoing basis –Remove the UNC service. Shippers contract directly with Xoserve to obtain the information Option 1b –As option 1a but the annual service becomes a non-code User Pays service for the annual service Option 2a –Extend permission in UNC to make the data available on an ongoing basis –Withdraw the annual service, create new UNC services for annual monthly service (12 reports per year) for the forthcoming year, and an annual quarterly service (4 reports per year) for the forthcoming year Option 2b –As option 2a but the services are non-code User Pays services (not UNC services)

3 Mod 279+ option considerations The development of the report has already been completed and funded via User Pays mechanisms so there are minimal development costs for any option. Any change in data from the original Mod 279 service will require development costs The annual service can be withdrawn as two more frequent services are available Shippers can contract directly with Xoserve for bespoke services that include the Mod 279 data Utilising the non-code User Pays service still retains the obligation to provide the service under GT SSLC A15 and simplifies the service order, invoicing processes and the UNC legal text drafting For all permissions and options the data available to be provided would be for a maximum of 12 months history from the relevant confirmation effective date. Following discussion at this meeting raise a UNC modification for a single option

4 Mod 279+ data items For information, the data items for mod 279 and proposed for the revised modification are: Shipper short code, meter point reference number, meter reading, meter reading date, read type, corrector corrected reading, corrector uncorrected reading, meter manufacturer code, meter model name, meter serial number, meter number of dials or digits, number of corrected dials, meter through the zeros count, corrector through the zeros count, imperial meter indicator, meter reading factor, reading units, correction factor, exchange meter serial number, exchange correction factor, exchange imperial indicator, exchange reading factor, exchange reading units, exchange number of digits or dials, exchange meter through the zeros, exchange start reading, exchange start reading date, exchange end reading, exchange end reading date, corrector exchange start reading, corrector exchange start reading date, corrector exchange end reading, corrector exchange end reading date, filter failure triggered