Feedback Safety Photo of the Week Collider-Accelerator Department 1-26-2010 Take 5 for Safety.

Slides:



Advertisements
Similar presentations
Accident Investigation vs. First Report of Injury.
Advertisements

What is a Forest School? Forest School offers children regular opportunities to achieve and develop confidence and self-esteem through hands on learning.
Safety Committees for Accelerator Facility Modifications Upcoming ESH Assessment/Audit What a Bad Day Looks Like Collider-Accelerator Department
DOE Electrical Assessment of C-AD: Inaccurate Electrical Panel Schedules Missing Knockouts Panel Modifications Picture of the Week Collider-Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Building Effective Leadership Teams: A Practitioner’s Look
NSF Audit Accelerator Safety Envelopes Picture of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Facility Authorization Basis at BNL Safety Photos of the Week Collider-Accelerator Department Take 5 for Safety.
Brookhaven Science Associates U.S. Department of Energy Brookhaven National Laboratory Collider-Accelerator Department FY06 Summary of Safety Feedback.
New Blueprint Project Impacting C-AD Mystery Injury Rate Pattern Photo of the Week Collider-Accelerator Department Take 5 for Safety.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Towards B+ HSS Assist Visit March Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Injuries Photos of the Week Collider-Accelerator Department Take 5 for Safety.
Credited Controls at C-AD Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Safety at Specialized Incidents 7-1 Chapter 7. Learning Objectives Describe the safety issues related to hazardous materials incident response. Describe.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
Feedback from Recent Group Meetings Positive Events High Voltage Hazards Safety Photos of the Week Collider-Accelerator Department Take 5 for.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Deferral of Services WEATHERIZATION ENERGY AUDITOR SINGLE.
Results of Feedback from Lab Stand-down Picture of the Week Collider-Accelerator Department Take 5 for Safety.
Incident Management System An Overview FGCICSIMS.
Contents Click the link below to go directly to the slides for that chapter. Chapter 1 ■ Your Personal Strengths Chapter 2 ■ The Roles You Play Chapter.
Why Do Monitoring Projects Succeed or Fail? L.M. Reid The epidemiology of monitoring. J. AWRA 37(4):
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Development plan and quality plan for your Project
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
Winter Planning in Dumfries and Galloway. CHP involvement Dumfries and Galloway has single CHP covering acute, community and mental health settings Historically.
Presented by: Insert Name Safety Management Consultant
Safety Topic MOU with Facilities and Operations (F&O) Collider-Accelerator Department Time Meeting – March 9, 2010.
Feedback and Improvement Bizarre Accident of the Week Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Scotty E. Hancock Rome/Floyd LEPC LEPC EXERCISING.
Type B Report - Draft Facts for Startle Hazard Event Collider-Accelerator Department Take 5 for Safety.
Information presented at the First meeting of the PDQI Team Facilitated by Scott Montgomery, Manager Sarasota County Emergency Services Team.
Public Safety Week 2010 A joint partnership between Colorado law enforcement and fire agencies.
Chapter 4 Performance Management and Appraisal
HUNCHHUNCH Title and Objective. Vision. Critical areas identified for implementation. Major phases planned. Outcome with advantages. Feedback received.
For the project to be effective, all ASCA member agencies must be trained and committed to entering PBMS data each month. Participation.
Officer Development Program Promotional Workshop.
Health and Safety Policy
Snow Collider-Accelerator Department Take 5 for Safety.
1. 2 Ergonomics 3 THE ERGONOMIC PROCESS There are two approaches to ergonomics:  Pro-active intervention (NIOSH Model)  Reactive intervention.
Portsmouth Public Schools. B-E-S Approach Building Safety Employee Safety Student Safety.
Brookhaven National Laboratory Lessons Learned (LL)Program.
7 Variable Model to Manage Things Collider-Accelerator Department Take 5 for Safety.
Safety Review for Modifications Calling For Help Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
ERCOT 2014 Hurricane Drill (HD) Summary Brian Barcalow Training Specialist, Sr.
Module 4: Unit 3, Session 3 MODULE 4: TIERED INSTRUCTION Adolescent Literacy – Professional Development Unit 3, Session 3.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Work Planning Human Performance Ray Karol May 2010 EBIS ARR.
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
Reasons Why SERVPRO is a better Restoration Vendor The Premier Cleaning and Restoration Company “Nationally Known, Locally Owned” Of Birmingham.
Brookhaven Science Associates U.S. Department of Energy Sustaining Excellence in Radiological Operations Through Peer Surveillance C. Schaefer, CHP D.
SAFETY AND SECURITY PRESENTATION Armstrong Jim Quinn, Principal Andrea DePiro, Assistant Principal Ken Baine, Security Planning Officer.
 Induction aims to familiarise new members of staff with the organisation and its environment  Can be informal or highly structured  Includes organisation’s.
Emergency Response Worker Health & Safety Training Interagency Communications.
New Supervisors’ Guide To Effective Supervision
Ray Karol Collider-Accelerator Department ESSHQ Division Head August 19, 2009 Human Performance Initiative at Collider-Accelerator Department.
Barriers Against Unknown Hazards The Flu Collider-Accelerator Department Take 5 for Safety.
Organizational Structure District Assessment Office Campus Test Coordinators Calendar Of Events Training Schedule Other District Staff Involved Testing.
The Ripple Effect C-AD ESSHQ Website More on Housekeeping Collider-Accelerator Department Take 5 for Safety.
Creating a retention schedule 10 July 2014 local.gov.uk/lginformplus.
3 STUDENT ASSESSMENT DEPARTMENT
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
IAEA International Atomic Energy Agency Arusha, Tanzania (NIGERIA) Dr Yau IDRIS 2 – 5 December 2013 RAF9038 Final Coordination Meeting.
Malcolm “Mac” Legault, Ph.D., CSP, STS.  How do we identify a good or poor culture?  How does this relate to safety?  Components of a good safety culture.
Measuring and Reviewing Performance
North Penn School District
Week of: December 3, 2018 Math - divide decimals to hundredths, using concrete models or drawings and strategies based on place value Attendance Is a crucial.
SETTING EXPECTATIONS For Staff and Campers.
The Edge Extreme Makeover.
SETTING EXPECTATIONS For Staff and Campers.
Presentation transcript:

Feedback Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety

Feedback  5 Groups out of 33 have participated to date; ~1 Group per week  Over 50 reasonable issues to date; examples:  Facility: lighting, vehicles, custodial service, HVAC, roof leaks, sewer backups  Training issues (training not coordinated; overwhelming, too much to remember)  Snow storm issues (priorities, communication with staff, with F&O)  Running accelerators during severe weather (need decision points / procedure)  Management does not consider workload when scheduling work  Warehouse needed for accelerator parts and tools  Its too difficult to follow links in SBMS  R2A2s are too long and complicated  Access Control System testing procedures need improvement  PPE rules not enforced as strongly as radiological rules  PPE needs to be assessed for some groups (as complicated as fire fighters)  Uniforms for C-AD groups  Low-risk work planning should be done the same throughout C-AD  Contention with allocated personnel and peers is avoided even though ESH is compromised 2

BNL Training Changed 3

Safety Photo of the Week 4 Not a step