Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 Texas Nodal Registration Meeting #3 Matt Mereness July 30 th, 2007.
Advertisements

1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Lead from the front Texas Nodal 1 TPTF Update for TAC December 4, 2008 Joel Mickey
Lead from the front Texas Nodal 1 EDS 3R5 Phase 1 Testing Detailed Approach and Demonstration August 16, 2007.
RARF QnA Session April 17, Resource Registration Process and Schedule Final RARF forms sent during week of April 7 –New Resources should get blank.
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
1 GENMAP Registration Workshop Jan 14, 2010.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Lead from the front Texas Nodal 1 Registration Deep Dive Overview / Kick Off Sept 25, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates March 07, 2008.
Integration Update 1 External Interfaces & Integration October 14, 2008 Brian Brandaw.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Kickoff Meeting August 1, 2007.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Lead from the front Texas Nodal 1 Registration and RARF Update to TPTF August 27, 2007.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Registration Data Collection June Window May 22, 2009 Kick Off Meeting.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
Lead from the front Texas Nodal 1 Registration Market Call Oct 31, 2008.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 19, 2009.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
Lead from the front Texas Nodal 1 Registration Data Update Aug 25, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
1Texas Nodal Update on Disclosure Issues, including NMMS/RARF Data Discussion ERCOT Staff October 27, 2009.
RARF QnA Session November 1, General Information EDS 4-1 RARF due on Friday, November 9, This includes pink, blue, white cells. (Also should.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
October 12, 2012 RPG Planning Guide 5.3.2(2) Developer obligation to keep RARF data updated Cathey Carter Resource Integration.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
June 9 th, 2008 TPTF Texas Nodal Program: Market Readiness Metrics Update Mike Beck.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
Lead from the front Texas Nodal 1 Registration Market Call Nov 14, 2008.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
1 Market Trials Update NATF January 5, 2010.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Registration Data Collection September Window
Resource Registration Update
Presentation transcript:

Resource Registration Update Dana Showalter Patrick Coon March 4, 2008

2 Lead From The Front Texas Nodal Resource Registration Status (MP11) as of February 1, 2008 as of February 29, 2008

3 Lead From The Front Texas Nodal Resource Registration Status (MP11) as of February 1, 2008 as of February 29, 2008

4 Lead From The Front Texas Nodal Resource Registration Status (MP11) as of February 1, 2008 as of February 29, 2008

5 Lead From The Front Texas Nodal Resource Registration Status (MP11) as of February 1, 2008

6 Lead From The Front Texas Nodal Resource Registration Status (MP11) as of February 1, 2008

7 Lead From The Front Texas Nodal RARF Addendum Status Addendum 1 – all Generation Resources –Received 72% of addendums that were sent out –Not sent to those where no RARF has been received –Due date was January 31, 2008 Addendum 2 – all Combined Cycle Resources –As of February 28, 2008 received 28% of addendums –Haven’t processed all submittals Any submittal not received by March 15 will not be included in the pre-population of the final RARF

8 Lead From The Front Texas Nodal Resource Registration – Current Activities (MP11) RARFs - Quality vs. Quantity Created list “ResourceRegistration” to communicate: –Market-wide issues with RARF fields –Answers to common questions –Posting of presentations, guides, and other supporting documentation –Sign up at Validation of data is leading to market clarifications –Ramp Rate Curve issues need revisited by March 15 –Others issues will be addressed as we move to the official RARF Scheduled workshops – to address data completeness and quality –By Resource Type (Wind, CC, Other Gen, Load) –Simultaneous presentation at Taylor Facility and via WebEx –Register through LMS

9 Lead From The Front Texas Nodal Resource Registration Workshops By the end of these workshops, attendees should have a solid understanding of the data being requested on the RARF and how it will be used by ERCOT Nodal systems. To achieve this goal, ERCOT will take the following steps: –Review the data fields on the RARF section by section to assist attendees with completing and understanding the form –Review key sections where there are market-wide inconsistencies –Make experts available to field questions Attendees of this workshop should be ready for the following: –Review RARF submittals and guides prior to attending the class –Submit specific comments or questions to in advance, if possible –Use the information from this workshop to review and revise final, pre- populated RARF prior to official submittal

10 Lead From The Front Texas Nodal Resource Registration Workshops – Typical Agenda Review new form General Information and Ownership Generator Unit Information Combined Cycle Configurations (Combined Cycle Session only) Resources Parameters Operational Resource Parameters (i.e. fields that QSE will be able to update through MMS) –RUC –Ramp Rate Curves Generator Step-Up Transformer Additional Planning Data –Generator Details –Plant Protection –Auxiliary Load –Subsynchronous Resonance PSSE Model Additional Assets Private Network

11 Lead From The Front Texas Nodal Resource Registration Workshops Resource Registration Workshops to be held at the ERCOT Taylor facility and via WebEx –Monday, March 10, 2008 – Conventional Generation (non Wind, non CC) –Thursday, March 13, 2008 – Combined Cycle Resources –Monday, March 17, 2008 – Wind Resources –Thursday, March 20, 2008 – Load Resources Registration and Attendance: –Registration is being managed through the Learning Management System ( –Select the proper section – by resource type and by attendance (Taylor or WebEx) –Attendees from all Resource Entities and associated facilities, including QSEs, are encouraged, but not required. Participation will be documented.

12 Lead From The Front Texas Nodal Resource Registration Form and Clarifications NPRR QSE representing this Generation Resource shall submit Resource Parameters for operational purposes in accordance with Section

13 Lead From The Front Texas Nodal Resource Registration – Next Steps (MP11) RARF Workshops – March, 2008 Freeze data from EDS RARF as of March 15, 2008 –Changes needed to data during the database freeze will need to be made to the permanent RARF by the Resource Entity when it is released Pre-populate final RARF between March 18 - April 7, 2008 Send to Resource Entities during the week of April 7, 2008 Official RARF due to ERCOT by May 1, 2008 Populate new database with official data as received Develop project for database with market interface option

14 Lead From The Front Texas Nodal QSE Attestations Why revisiting this? –Problems with form Mnemonics not used CC Mnemonic not known in September Not sent by representing Qualified Scheduling Entity Resources moved –Sent only to QSEs with problems on form submitted in September –Key to mapping Ancillary Services to the Units/Trains that will provide them Resolution –Pre-populated with mnemonics and sent to representative QSE –Due to ERCOT February 22, Received 60% Attestation information to MMS by March 7, 2008

15 Lead From The Front Texas Nodal Resource Mapping (MP10) Send by Generation Site to Resource Entity Authorized Representative by March 15, 2008 Preliminary review of a few sites has been completed and comments will be incorporated Package will include –Spreadsheet mapping Resource to Resource Nodes Resource to EPS Meters Load EPS Meters –NMMS One-line Screenshot(s) –Guide –Form Resource Entities to return verification form to by April 15, 2008

16 Lead From The Front Texas Nodal Questions??? Any additional questions and all submittals regarding the registration process or the RARF should be directed to: