Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Multichannel readout system of inner tracker for NICA-MPD Rogov Victor AFI, JINR, Dubna Afi.jinr.ru.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.

Sergey Belogurov, ITEP, Moscow STS CAD model. GSI, STS mechanics: Conceptual CAD model development Sergey Belogurov ITEP, Moscow Engineer: Sergey.
Characterization of double sided silicon micro-strip sensors with a pulsed infra- red laser system for the CBM experiment Pradeep Ghosh 1,2 & Jürgen Eschke.
V. Pugatch CBM Collaboration Meeting, Dubna, Oct CBM Silicon Tracking System. Results of the pre-prototype detector module test. V.M. Pugatch.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 16 October 2008 CBMCBM Status.
Mechanics and Cooling Systems for the CBM STS SAINT-PETERSBURG STATE UNIVERSITY S.Igolkin, CONTENT.
1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,
1 The 3-rd Work Meeting of the CBM -MPD STS Consortium “Technical challenges of the CBM and MPD Silicon Tracking Systems 2009” THE CABLES FOR THE CABLES.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
"Indian Participation in FAIR: Science and Technology"
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
CBM-MPD STS consortium – status of activities Yuri Murin for the Consortium –Engineering of STS module, ladder, station –Cooling system concept and plans.
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA Yu.A.Murin LHEP JINR Yu.A.Murin, Kuokola, 25 June, 2013.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
Large Area Fast Silicon Tracking Systems for MPD and CBM setups of NICA and FAIR megaprojects Yu.A.Murin LHEP JINR 1 NICA-Praha-2013, 7-13 July, 2013.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Status of RF stations for NICA project MAC meeting october 2015.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Johann M. Heuser – The CBM Experiment at FAIR 1 STS and magnet engineering.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser CBM Collaboration Meeting GSI Darmstadt, 12 March 2009 Status of the CBM Silicon.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
N- XYTER Front-End Boards Christian J. Schmidt, GSI Darmstadt 13. CBM Collaboration Meeting, GSI, Darmstadt, March 10 – 13, 2009.
Dec
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 102 nd Session, September 2007, Dubna.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
The Silicon Tracking System of the CBM experiment FAIR 2014, Worms, October 2014 requirements and detector concept system performance prototype.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
SPHENIX Silicon Tracker 2015/07/10 Radiation Lab meeting Y. Akiba (RIKEN)
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov.
Design and development of thin double side silicon microstrip sensors for CBM experiment Mikhail Merkin Skobeltsyn Institute of Nuclear Physics Moscow.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
The STS-module-assembly:
BM&N STS ladders assembly in VLHEP
n-XYTER Hybrid Developments
Progress with System Integration of the CBM Silicon Tracking Detector
The workflow of module assembly for the CBM Silicon Tracking System
PANDA Muon Group Meeting, Protvino 7 June 2011 G
STS Work Meeting on CBM and JINR VB-LHEP, May 2017
Status of the PANDA Magnet
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
V.M. Pugatch Kiev Institute for Nuclear Research
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Vertex Detector Overview Prototypes R&D Plans Summary.
Calice Tile-HCal and Tail-catcher/Muon Tracker
East Hall under construction
Presentation transcript:

Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI Dubna, May 19-22, 2009

Dubna GSI, Protvino, Dubna Dubna, Protvino Moscow Kharkov St.Petersburg 7 institutes 3 countries Modules assembly Components Ladder assembly Radiation tests (SPb+?) In-beam tests GOAL:to organize an East Slavic cluster of teams for production of the CBM and MPD STS The Consortium Structure

The Starting Point Dubna, May 19-22, 2009

The Consortium tasks for 2008 Technical task definition for CBM STS ladder section (ALL) A pilot batch of Russian-made CBM STS Si sensors (SINP) Design and production of specific mechanics sample elements Development n-radiation site the CBM STS components (KRI Cyclotron Lab, SPb) Task Force interaction improvement (ALL) Infrastructure development of the Consortium sites (KRI,JINR) Support of microcable production team in Kharkov via JINR-GSI cooperation Dubna, May 19-22, 2009

CBM STS Ladder: Steps to Technical Task Definition (ALL) To agree of ladder design To agree of sensor topology To agree of connection to FEE Solution AGREED : flat semi-tiling of sensors on the 3D CF support ladder Dubna, May 19-22, 2009

CBM STS Ladder: Steps to Technical Task Definition To agree on central ladder design To agree on hybrid Back End Dubna, May 19-22, 2009

CBM STS Sensors: Pilot Batch (M.Merkin) Manufacturer RIMST– Zelenograd, Moscow region Active area x 60.0 mm2 Strips pitch on both sides of detectors - 58 µ Stereo angle - ±7.5degrees Number of strips on each side (8 readout chips) With bondning/test pads topology suitable for TAB bonding (standard for the whole CBM STS !) Status : Draft of the contract (three mile stones!) is ready, pending on baby-sensors photomask files accomplishment (Merkin). Expected time for the first batch is 30 April 2010 Dubna, May 19-22, 2009

CBM STS: CF sample prototypes (S.Igolkin) 1/2 Technical drawings of the 4-th station have been accomplished but found not to fit the magnet size ( currently passed for the ANSI calculations) Jigs and accessories (vacuum oven for the CF ladder processing) are under design and production Imitating samples for the 3-sensor module and sensor support pins manufactured and tried for the rigidity Dubna, May 19-22, 2009

CBM STS: CF sample prototypes (S.Igolkin) 2/2 Dubna, May 19-22, 2009

Radiation test KRI, SPb,RF (V.Jakovlev & S.Lashaev, KRI D.Karmanov, SINP ) 17 MeV pBe->n or DD->n? From 9Be(p,n)9B (g.s.) reaction; From 9Be(p,n)9B* reaction; 9Be + p  4He + 5Li + n – 3.5 MeV  8Be + p + n – 1.7 MeV  2 4He + p + n – 1.6 MeV Dubna, May 19-22, 2009

Task Force Interaction Improvement 1/3 To keep the teams having a clear joint goal each year (demonstrator test policy with tests in Protvino) To develop the infrastructure of the key sites (restoration of rooms and procurement of capital equipment) To Organize regular work Work Meetings Dubna, May 19-22, 2009

Task Force Interaction Improvement 2/3: In-beam tests in Protvino Thanks Thanks to Yuri Zaitsev, ITEP for funding! Dubna, May 19-22, 2009

Task Force Interaction Improvement 3/3 2-nd Work Meeting of Consortium in Protvino June, d Work Meeting of Consortium in Sortavala, Karelia, June 1-4, 2009 Dubna, May 19-22, 2009

2008 Achievements The Consortium chain started to operate as a whole Mechanical design of the ladder almost accomplished n-irradiation 20 MeV cyclotron evolved Preparations for prototype manufacturing KRI(CF production, bench for the C-I-V measurements), JINR (Assembling&Certification) First stage of organization of the CBM STS in-beam testing Protvino realized Additional funding for Kharkov and Dubna teams acquired for 2009 via JINR-GSI scientific cooperation Grants for the 3-d Work Meeting gained from RF focused funding agencies (ISTC) Dubna, May 19-22, 2009

Tasks to remedy in 2009 The mismatch of the STS size and the clearance of the Magnet n-XYTER FEBs supply for the JINR team CF Prepreg supply for Igolkin Mold manufacturing for Igolkin Other problems could be resolved locally Dubna, May 19-22, 2009

Basic Problem: Keep going on grants only Dubna, May 19-22, 2009

2009 Tasks and their sharing Demonstrator 1: A 3-sensor module prototype Organization of in-beam tests in Protvino, November, 2009 Formulating irradiation plan for KRI Cyclotron team for 2009 Testing bench with collimated Ru-106 JINR to operate with n- XYTER FEB read-out Production of CF parts for the full ladder prototype Cooling system definition work plan (additional funds application) Analogue long cable conceptual bench tests based on FEB and existing Demonstrator-0B and n-XYTER FEBs Attraction of new members to Consortium (Czech Republic for sensor production?) Dubna, May 19-22, 2009

Thank you for your attention! Acknowledgments to all many Consortium members not mentioned! Dubna, May 19-22, 2009