Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.

Slides:



Advertisements
Similar presentations
Astro 2010 Decadal Survey Alan Boss (Carnegie Institution) Tom Greene (NASA Ames) Pathways to Habitable Planets Conference Barcelona, Spain September 17,
Advertisements

UCSC History. UCSC: A brief history 60s University Placement Committee A lot of field trips/interaction with employers.
OFFICE OF SCIENCE 1 Large Synoptic Survey Telescope News since the February update Astronomy & Astrophysics Advisory Committee Telecon May 2012 Fred Borcherding/Nigel.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
Jim Peterson October 13, 2007Swinburne Astronomy Online AstroFest 2007 A Brief History of the Astrophysical Research Consortium and the Apache Point Observatory.
2012 March 22RIA Workshop - Science with ORM and CAHA in the next decade.
AST Portfolio Review Tom Statler, NSF/AST AAAC Meeting 13 Oct 2011.
SUGGESTIONS From White Papers received as of 10/06/14.
Particle Physics, Nuclear Physics and Particle Astrophysics meeting October 2010 John Womersley Director, Science Programmes, STFC.
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
NFAC Neutrino Facilities Assessment Committee Barry Barish Chair 19-Sept-02 for National Research Council.
NSF Program Update Astronomy & Astrophysics Advisory Committee 13 February 2006.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
Keck Observatory and The System: Astro2010 Activities Mike Bolte, Shri Kulkarni, Taft Armandroff Keck Strategic Planning Discussions September 18, 2009.
OIR C OMMITTEE S TATUS R EPORT 2 nd face-to-face meeting Oct , 2014 Beckman Center of the National Academies Irvine, CA.
September 4, 2012 Michael Moore Program Executive Astrophysics Division Science Mission Directorate Princeton Astrophysics Community Meeting.
W. M. Keck Observatory Subaru Users’ Meeting
Long Range Facility Planning assisted by Silver Falls School District.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Activities of and Prospective Issues before the Committee on Astronomy and Astrophysics Report by David Spergel, CAA Co-Chair Disclaimer: These slides.
NSF Program Update Astronomy and Astrophysics Advisory Committee February 15, 2005.
AST Portfolio Review Tom Statler, NSF/AST AAAC Telecon, 11 May 2012.
NSF Program Update Astronomy and Astrophysics Advisory Committee May 16, 2005.
A Roadmap forNationalOIRFacilities AAAC May 2005 OIR Long Range Planning Committee Document for submission to NSF AST and CAA May 2005.
Association of Universities for Research in Astronomy Presentation to Subaru Users Committee.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
Polar Research Board Future Science Opportunities in Antarctica and the Southern Ocean Update to OPP OAC May 18, 2011 David Bromwich.
NSF Update AAAC 8 February Update Topics FY2007 Budget Situation FY2007 Budget Situation FY2008 Request FY2008 Request Senior Review Status and.
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
NSF Program Update Astronomy & Astrophysics Advisory Committee 12 October 2006.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
AAS ALMA Town Meeting, Washington, DC 2006 Community Input into the operations of the Global ALMA project and North American ALMA Science Center.
National Science Foundation Division of Astronomical Sciences Facility/Large Project Oversight and Role of Managing Organization Committee of Visitors.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Suggested Subaru-NAOJ/Princeton Consortium: Overview Michael Strauss, Ed Turner, Jim Gunn January 25, 2007.
ARIN Fee Discussion John Curran. Situation Fee Structure Review Panel completed and discharged – Final Fee Structure Review Report released September.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
NSF Division of Astronomical Sciences Senior Review Update Astronomy and Astrophysics Advisory Committee 11 October 2005.
11 Welcome to All! October 26-28, 2009 Washington, D.C. Welcome to All! Accelerators for America’s Future Symposium and Workshop October 26-28, 2009 Washington,
AST Update Astronomy and Astrophysics Advisory Committee 10 May 2007.
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
What the Data Products Program Offers Users Todd Boroson Dick Shaw Presentation to NOAO Users Committee October 23, 2003.
Why Collaboration?  Better science through collaboration If you want to do a big survey, you need to benefit (or persuade) many scientists. (Democratic.
ALTAIR: Access to Large Telescopes for Instruction and Research Chair: Larry Ramsey (14 members, 8.5L, 2S, 3.5U) Report: Submitted Mar 9, 2009
NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006.
7/17/08NASA/USRA Management review- Clocktower TLR - 1 A New SOFIA Science Vision Introduction and Schedule Progress Tom Roellig.
The View from NSF Very Wide Field Surveys in the Light of Astro2010 Space Telescope Science Institute June Nigel Sharp 1.
AAAC Jim Ulvestad December 1, Divestment issues  “Divestment,” in the parlance of the Portfolio Review, implies removal of a telescope from the.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Telescope Access Metrics Presentation to Program Review Panel September 16, 2004.
Division of Astronomical Sciences Update (Life After the Senior Review) Astronomy and Astrophysics Advisory Committee 11 October 2007.
1 LSST Town Hall 227 th meeting of the AAS 1/7/2016 Pat Eliason, LSSTC Executive Office Pat Osmer, LSSTC Senior Advisor.
An NSF Facility Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
Division of Astronomical Sciences Senior Review Astronomy and Astrophysics Advisory Committee 10 May 2007.
Jim Ulvestad Division Director, AST May 6, 2011 Division of Astronomical Sciences.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
Preparing for the Future: NASA's Planning for the Decadal Survey
Large Synoptic Survey Telescope
Telescope Access Metrics
Draft thoughts on selecting LSST DDFs
Community Science Updates
National Science Foundation Update
APPA – Term 3 Breakfast Session
A 10-m Diameter Submillimeter-wave Telescope for the South Pole
Astronomy and Astrophysics Advisory Committee Oct 11, 2005
Scientific Potential Current Design Efforts Complementarity with JWST
Presentation transcript:

Senior Review of NSF Facilities NOAO Users Committee October 4, 2005

MEMBERSHIP -- Senior Review Committee Chair - Dr. Roger Blandford, Kavli Institute for Particle Astrophysics & Cosmology, Stanford U We have requested suggestions for membership from members of the community, advisory committees, such as the Astronomy and Astrophysics Advisory Committee (AAAC) and the Committee on Astronomy and Astrophysics (CAA), the AAS, and the facilities managers and directors. We have received many nominations, and are in the process of convening the committee. We expect membership to be finalized shortly, and will post it here when complete.

Goal of the Senior Review examine the balance of NSF investments enable progress on recommendations of Decade Survey, including –operations funds for ALMA, –other priorities. preserve & grow healthy core program of astronomical research. seed the next generation of capability, and attract, train, and retain the next generation of astronomical researchers Charge to the committee TBA

What will the $30M/year be spent on ? operations funds for ALMA –$24M/year, US share other priorities –not defined yet guess: –GSMT Design & Development needs $8M/year –Gemini Aspen instruments need $7M/year (US share) –LSST Design & Development (already funded) –NVO Operations (already funded) “Committee not advising on expenditure” –Priorities are those of the Decadal Survey

SCHEDULE several meetings through the fall and winter final recommendation/report to NSF spring2006 first meeting October 19,20 at NSF, closed. –committee will consider material observatories have provided and be presented with several scenarios developed by NSF. –Directors of the national observatories will be present for brief sessions to answer questions and provide clarifying background information. second meeting in December or January –perhaps with a public session with an opportunity for community input. final meeting several months later (April) –committee => final recommendations and report

TOWN MEETINGS NSF will hold a number of ‘town meetings’ –to provide an opportunity for NSF staff to interact with the community, answer questions, listen to concerns, observations, and suggestions meet one-on-one with interested individuals. Boston, Massachusetts - 29 September 2005 Minneapolis, Minnesota - 7 October 2005 Washington, DC - 14 October 2005 Clemson, South Carolina – 15 October 2005 Boulder, Colorado – 24 October 2005 Berkeley, California - December 2005, Washington, DC, AAS Mtg 8-12 January 2006

COMMUNITY INPUT NSF welcomes constructive input to deliberations of senior review committee. Over the next few months, we expect to formulate some questions for the community to address. We look forward to your response. Contributions from national facilities to the senior review are public, posted at for NAIC, for NOAO, for NRAO, for NSOhttp:// astronomy.org/nv/nuresult.asp?nuid=97 for Gemini. astronomy.org/nv/nuresult.asp?nuid=97

NSF Senior Review of Astronomy Facilities NOAO is approaching the goal of investing 25% of program plan funds in decadal survey initiatives—even without including TSIP. The Senior Review’s announced purpose is to re- direct $30M out of $120M in AST facilities funding to these projects. The transition plan presented here is intended to realize NOAO’s share of that goal.

NOAO submission to NSF Senior Review There is a very strong science case for OIR facility based astronomy in the coming decades The optimum (economical) approach for NSF is to fund a non-redundant OIR system NOAO is already doing its share to create an accessible system of 1 to 30 meter OIR telescopes A transition plan is presented which retains 50% share of the four meters for peer reviewed access through 2011 –backed by AURA Observatories Council and –NOAO Users Committee Performance metrics for oversubscription, publication, citation, and broader impacts are strong

Refereed publications

Details of unique wide field and infrared capabilities ObservatoryInstrumentCapabilityField Size KPNOMosaic on Mayall CCD imaging 36 x 36 arcmin CTIOMosaic on Blanco CCD imaging 36 x 36 arcmin KPNO or CTIO NEWFIRM on 4-m Wide field IR imaging 28 x 28 arcmin WIYNHydra MOSCCD spectroscopy 1 degree (93 fibers) CTIOHydra MOSCCD spectroscopy 40 arcmin (138 fibers)

Planned development of unique wide field and infrared capabilities TelescopeInstrumentCapabilityField SizeFirst light WIYNODICCD imaging 1 degree2009 BlancoDECamCCD imaging 2 degrees2009 SOARSAM GLAO Optical AO imaging 1-2 arcmin2007 Gemini-SMCAOIR AO imaging 1-2 arcmin2007 Gemini- Subaru WFMOSCCD spectroscopy

Last week’s request for info – all centers Program Plan funds FY05

What would be a good outcome for NOAO ? NRAO pays for ALMA operations radio/OIR firewall/levy leaks but doesn’t burst -- not in the charge NOAO’s $1.4M/year offering is recycled AURA GSMT (#1 in decadal survey) gains 4 x $0.5 M/year from our rich siblings

Epilog economist J.K. Galbraith: politics is not the art of the possible. Rather it consists of choosing between what is disastrous and what is merely unpalatable