1 Division of Astronomical Sciences Update (Life After the Senior Review) Astronomy and Astrophysics Advisory Committee 11 October 2007

2 Outline Senior Review implementation Senior Review implementation  Progress  Concerns Interagency and AST News Interagency and AST News FY2008 and beyond FY2008 and beyond

3 Finding 1 - The Scientific Challenge NSF finds this the most important conclusion of the report: “Proper maintenance of current facilities while simultaneously developing and beginning operation of the proposed new facilities is infeasible under any reasonable expectations for federal budget support based on past funding levels. The cuts that are proposed to the existing program are as deep as possible without causing irreparable damage and will only allow a start to be made on new initiatives.”

4 “Senior Review” Recommended changes Recommended changes  Reduce support to VLBA to $3M by FY2001, closure if sufficient outside funds not found  Reduce support to Arecibo/NAIC to $8M by FY2009 and to $4M in FY2011, closure if additional outside funds not found  Support of GONG++ to cease 1 year after successful deployment of NASA’s Solar Dynamics Observatory (unless other support forthcoming)  Investigate possible reductions in administrative costs, scientific staff costs, selective observatory programs and site operations  Shift balance of NOAO programs to provide increased access to an optimized suite of high performance telescopes of all apertures in both hemispheres

5 From the Conclusion “It should be emphasized that, in none of the proposed actions can the facilities targeted be seen as redundant to the scientific enterprise. Instead, the SR is recommending reduced AST funding or closure of some telescopes that could be unique and productive for 20 years.” “These findings, which go beyond the SR’s charge, may appear defeatist to some. However, the SR developed the more optimistic view that, with patience, cooperation and wise planning, it will be possible to realize the promise of the next generation of major observatories.”

6 Executive Summary Radio-millimeter-submillimeter Program

7 NRAO Transition Program Very Long Baseline Array Very Long Baseline Array  Seek partners who will contribute personnel or financial support to the operations of the VLBA by 2011.  Limit AST support to $3M, close if remaining costs are not found elsewhere. Reduction in operating costs of GBT Reduction in operating costs of GBT Reduction in the cost of administrative support Reduction in the cost of administrative support Reductions in scientific staff costs Reductions in scientific staff costs

8 NAIC (Arecibo) Transition Program Taper to $8M per year AST support over next 3 years   Concentrate on surveys   ~20% time for individual PIs   Assumes ATM support at ~$2M/yr continues   Need to consider alternate operational models   See cost review slides Seek other sources of support for operations By 2011, AST support limited to $4M. If other support not sufficient to produce a viable operational model, recommends closure. Cornell plan closes planetary radar ~ Oct 2008

9 Executive Summary Solar Program

10 NSO Transition Program NSO should:   organize an orderly withdrawal of personnel and resources, including the SOLIS telescope, from Kitt Peak/Tucson and Sacramento Peak and start to close down operations at these sites as soon as ATST funding begins.   consolidate its management and science into a single headquarters as soon as possible.   Support of the Global Oscillations Network Group (GONG++) project should cease one year after the successful deployment of NASA’s Solar Dynamics Observatory, unless the majority of operations support is found from other sources.

11 Towards a National GSMT Program Need to assure a healthy scientific enterprise going into the GSMT era (community was heard in SR process) Need to assure a healthy scientific enterprise going into the GSMT era (community was heard in SR process)  Define the “System”  Appropriate range of aperture and access  Necessary instrumentation, maintained and supported  Assure that the system is robust against delays and uncertainty along the GSMT path Path from development through construction and into operations, including successful partnership formation, is complex Path from development through construction and into operations, including successful partnership formation, is complex  Requires leadership and planning at unprecedented level at NSF

12 Towards a National GSMT Program NOAO’s Role NSF has asked AURA/NOAO to act as NSF’s “Program Manager” for GSMT development NSF has asked AURA/NOAO to act as NSF’s “Program Manager” for GSMT development  Role similar to NASA center in development of major space missions Lead in defining the “system” and assuring its long-term health Lead in defining the “system” and assuring its long-term health Understand and champion national needs for a GSMT Understand and champion national needs for a GSMT  National Science Working Group (Meeting 8-9 November)  National “Design Reference Mission” to set scientific performance expectations, operational models Promote development at a pace that recognizes both private and federal timescales Promote development at a pace that recognizes both private and federal timescales Establish appropriate, symmetrical interfaces with TMT and GMT Establish appropriate, symmetrical interfaces with TMT and GMT

13 Developing an NSF Response and Implementation Plan AST is working closely with facilities to understand implications of recommendations as we consider possible implementation paths NSF is active in encouraging and engaging in discussion with other possible partners in facility operations, including international partners and other funding agencies.   NASA for Arecibo, VLBA, GONG++   Commonwealth of Puerto Rico; Puerto Rican Universities; local business   International agency meetings convened by AST AST is working with the community and NOAO to determine where re- investment in existing OIR facilities should occur and in the development of an integrated and coordinated “System”   NOAO’s ReSTAR deliberations

14 Developing an NSF Response and Implementation Plan AST is undertaking detailed cost reviews of each observatory necessary to understand where cost reductions can be made   Understand operational costs, appropriate staffing levels   Consider other operational and business models   RFP has been issued; three bids likely Explore costs and legal issues associated with recommendations e.g. environmental, deconstruction, divestiture, termination costs – engaging outside studies over the next year; first study is for Arecibo and first site visit just finished yesterday (report due ~ 1 Feb) Now constructing the forward look - What can we accomplish as the funds become available under various budget models?

15 The Operations Challenge We have a 50 year tradition of operations that we must examine, both for now and for future facilities We have a 50 year tradition of operations that we must examine, both for now and for future facilities Can current level of service be delivered for less? Can current level of service be delivered for less?  Some opinions based on university-scale ops  We must understand the costs thoroughly  Answer may well be, “No” Do we need to look at different service models? Do we need to look at different service models?  Changes similar to those at NAIC may be necessary at all AST facilities  Facilities managers and NSF must have an open dialogue  Domenici press release, e.g., is not a healthy reaction

16 AST Concerns Apparent short half-life of community attention Apparent short half-life of community attention  Many rumors  Statements indicating report not read/assimilated  AST met with community leaders in Chicago and jointly crafted “Dear Colleague” letter recently circulated by AAS Increasing political pressure and interference with science community-based process and plan. Increasing political pressure and interference with science community-based process and plan.  Budget doubling removes need for Senior Review and invalidates conclusions?  Growth in MREFC account can easily cover Arecibo problem?  Arecibo future being determined without ATM consultation?  Letters from members of Congress to Director  Bill introduced to guarantee continued support of Arecibo

17 Good Interagency News! Virtual Observatory MOU signed! Virtual Observatory MOU signed!  Onward to a joint solicitation Excellent interactions with both NASA and DOE Excellent interactions with both NASA and DOE  Joint consideration of decadal survey proposal review and structure (including OMB and OSTP)  Regular, fruitful discussions between AST and NASA Astrophysics Division  NSF AST – DOE HEP interface very effective in on- going, joint reviews, decisions, and oversight

18 Other AST News 2008 Committee of Visitors 2008 Committee of Visitors  Planning underway - John Carlstrom will chair the committee  Dates: 6 – 8 February  Consider serving if asked! FY2007 Close out FY2007 Close out  Success rate – 24% NSB declared ATST to be ready for inclusion in a future budget NSB declared ATST to be ready for inclusion in a future budget

19 Charting the Future Sine qua non Sine qua non  Healthy grants program  Successful completion and operation of ALMA  Robust support of base facilities (as defined by Senior Review) Progress on GSMT, LSST, SKA → “TDPs” Progress on GSMT, LSST, SKA → “TDPs” Resources for mid-scale projects → “Mid- scale” {CMB, DETF, ExoPlanet, next Decade Survey small and moderate} Resources for mid-scale projects → “Mid- scale” {CMB, DETF, ExoPlanet, next Decade Survey small and moderate} Models of budget outlook Models of budget outlook

20 Looking Forward to 2008 (At President’s Request Level) Healthy increase (~10%) in grants program Healthy increase (~10%) in grants program  Grant support for facility users under study Partnerships in Astronomy and Astrophysics Research and Education (PAARE, NSF 07-561) Partnerships in Astronomy and Astrophysics Research and Education (PAARE, NSF 07-561) New program helping young investigators start instrumentation careers (grad students, post-docs, beginning faculty) New program helping young investigators start instrumentation careers (grad students, post-docs, beginning faculty) Increases in ATI (30%), TSIP (25%) and UROs Increases in ATI (30%), TSIP (25%) and UROs NOAO up $2.3M to refurbish and modernize KPNO and CTIO facilities NOAO up $2.3M to refurbish and modernize KPNO and CTIO facilities NRAO up $2M for ALMA early operations NRAO up $2M for ALMA early operations GSMT program at $5M and SKA TDP at $3M per year GSMT program at $5M and SKA TDP at $3M per year