Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.

Slides:



Advertisements
Similar presentations
LC-ABD Phase 2 Outcome G. A. Blair, RHUL LC-ABD Meeting RHUL 12 th April 2007 PPRP Meetings Feedback from PPRP Outcome.
Advertisements

April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
QS 702 Phase II: Encouraging the Integration of Technology Into Higher Education.
MENA-OECD Investment Programme Draft Policy Considerations on Incentives Working Group 3 Meeting Cairo, Egypt 6-7 September 2006.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Organically evolving CBC opportunities and areas of work INTOSAI Capacity Building Committee - Meeting in Lima, Peru 9-11 September 2014.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 A Discipline of Software Design.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Beijing ILC Workshop Global Design Effort 1 The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Current and future work of the Adaptation Committee in the area of adaptation technologies Workshop on technologies for adaptation Bonn, Germany, 4 March.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Software Engineering Lecture 9: Configuration Management.
1 Impedance-related and others collective effects Impedance-driven collective effects/Instabilities –Single-Bunch (very high priority) –Multiple-bunch.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
IANA Stewardship Transition & Enhancing ICANN Accountability Panel and Audience discussion | WSIS Forum | 5 May 2016.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Upcoming Work on the Enabling Environment for Civic Engagement Initiative Jeff Thindwa Participation and Civic Engagement Group Social Development Department,
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Software Project Configuration Management
Conventional Facilities and Siting Global Group (ARCFS)
Formulating and implementing national adaptation plans (NAPs)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
International Relations Sector and IR-ECO Group
The ILC Control Work Packages
Technical Design Report preparation
ILC Global Design Effort
Barry Barish GDE Caltech
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
Meeting Outcomes “Building International Partnership To Enhance Science Based Ecosystem Approaches In Support Of Regional Ocean Governance” November.
Lyn Provost, IAASB Member and Task Force Chair IAASB Meeting
Presentation transcript:

Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY

September 20-22, 2006 MAC Review Global Design Effort A Start – Ideal List input from technical leaders topics lead institutes status R&D Board introduces priorities very high, high, moderate, low list serves as a starting point for further discussion on Global R&D concerning coordination funding tracking

September 20-22, 2006 MAC Review Global Design Effort 3 1 st MAC Input GDE MAC emphasizes the need for a global R&D plan with milestones coordinated use of resources in all regions US R&D programs centrally funded other regions have a larger variety of funding mechanisms, which need to be made more transparent to guarantee overall success lack of overall funding prioritized plan with means of tracking results MAC emphasizes SC RF to achieve the ambitious gradient goal of 35 MV/m other areas have to be addressed as well 3

September 20-22, 2006 MAC Review Global Design Effort 4 Since then… GDE R&D Board advised G Dugan in the US FY07 Fiscal program initial input from Ideal List where adequate complemented by comments on interaction between R&D groups parallel developments in different institutes discussion on practical constraints GDE R&D Board advised UK LC-ABD cross correlation with Ideal list comments role of topical vs focussed program priorities complementarity 4

September 20-22, 2006 MAC Review Global Design Effort 5 …Launch of Task Forces… urgent areas Klystrons S0/S1 on SC cavities/modules S2 on SC system tests addressing important areas S3 Damping Rings S4 Beam Delivery System S5 Positron Source while maintaining an overview on controls diagnostics, etc. 5 focus of activities

September 20-22, 2006 MAC Review Global Design Effort 6 Role of Task Forces identify the burning R&D needs for the ILC in the particular area negotiate priorities for a solution compatible with the overall time planning of the ILC amongst all regions enable an agreement between all institutes involved to follow the prioritized approach in the R&D 6

September 20-22, 2006 MAC Review Global Design Effort 7 Maintaining R&D Overview the original Ideal List contains ~500 R&D tasks provided valuable help shortfalls were identified static cumbersome to correlate to other lists, e.g. funding plans assignments of priorities change as design evolves practicality of the tool attempts were started with CERN for a more professional implementation requirements evolved faster than could be specified 7

September 20-22, 2006 MAC Review Global Design Effort 8 Snapshot of the Original List

September 20-22, 2006 MAC Review Global Design Effort 9 Use case: Proposal driven R&D in the absence of centralized global funding R&D board has to take stock of R&D proposals to get informed about the status of (all related) R&D programs addressing the needs of the ILC note: there is no "formal" mechanism to enforce such input. Nevertheless the R&D Board has been able to influence the process on numerous occasions requires guidance from regional directors to instigate new R&D the tool has to provide the R&D board with various views onto the database US FY07, UK LC-ABD, EUROTeV, … 9

September 20-22, 2006 MAC Review Global Design Effort 10 Funding View to R&D Tasks RD Task FY07 Review LC ABD Review Ideal List EUROTeV FY07

September 20-22, 2006 MAC Review Global Design Effort 11 Use case: Resources in a globally dispersed ILC project maintain overview on experts existing resources possible synergies with other projects database has to provide views personnel laboratory engagement regional engagement … 11

September 20-22, 2006 MAC Review Global Design Effort 12 Person Resource View to R&D Tasks RD Task KEK FNAL SLAC Person

September 20-22, 2006 MAC Review Global Design Effort 13 R&D database has to support various reviews various funding plans time evolution of projects (completion, termination) association of investigators/institutes to tasks has to provide reports by R&D area institute, investigator, funding plan, … technically it has to be based on a relational DB model 13

September 20-22, 2006 MAC Review Global Design Effort 14 at the heart the actual R&D activity

September 20-22, 2006 MAC Review Global Design Effort 15 Some Relationships

September 20-22, 2006 MAC Review Global Design Effort 16 Status early test version of relational database is existing needs optimization initially abstracted from Ideal list updates will be used to generate reports initially internal to R&D board to consolidate to optimize specific reports on demand reviews, funding plans subset of the information will be made publicly available initially static possibly dynamic access 16

September 20-22, 2006 MAC Review Global Design Effort 17 Conclusion on Tools initial tools to support the work of the R&D board have been readily available the use cases have considerably expanded demands can only be fulfilled with an implementation that takes the multitude of relations into account the specifications for a relational DB approach have been made test implementations are existing first release soon to come 17