Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.

Slides:



Advertisements
Similar presentations
1 Pixel Bus Development Atsushi Taketani RIKEN/RBRC 1.Who is working 2.Over view of pixel bus 3. Manufacture process 4. Issues 5. Development / Production.
Advertisements

Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
The ATLAS Pixel Detector
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Silicon Stripixel Detector Junji Tojo RIKEN Vertex2005 Lake Chuzenji, Nikko, Japan November 7-11, 2005.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
LHCb VErtex LOcator & Displaced Vertex Trigger
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
1 Silicon Vertex Detector at PHENIX Atsushi Taketani RIKEN / RBRC 1.Physics Goal 2.Detector Concept 3.Structure 4.Pixel detector 5.Strip detector 6.Summary.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
Sept. 7, 2004Silicon VTX Workshop - Brookhaven National Laboratory, Long Island, New York Prototype Design of the Front End Module (FEM) for the Silicon.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
The Silicon Pixel Detector (SPD) is part of the Inner Tracking System (ITS) of the ALICE experiment. ALICE is designed to study the properties of strongly.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Low Mass Alice Pixel Bus Rui de Oliveira TE/MPE/EM 6/9/20161Rui de Oliveira Alice worshop.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Si Sensors for Additional Tracker
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Simulated vertex precision
Roberto Dinapoli CERN-CEM II,Montpellier For the ALICE Collaboration
VELO readout On detector electronics Off detector electronics to DAQ
Silicon tracker and sensor R&D for sPHENIX
TPC electronics Atsushi Taketani
The CMS Tracking Readout and Front End Driver Testing
PID meeting Mechanical implementation Electronics architecture
SVT detector electronics
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary

2 Full ladder ~4mm Pixel bus Pixel sensor modules Pixel stave (with cooling) Pixel detector = inner 2 layers of VTX 1 st layer: 10 full pixel ladders = 20 half ladders = 40 sensor modules 2 nd layer: 20 full pixel ladders = 40 half ladders = 80 sensor modules Pixel Detector SPRIO 57mm (32 x 4 pixel) 13mm 256 pixel Sensor module 50  m x 425  m

33 Specification Collision Rate ~ 10MHz -> Timing Resolution < 100nsec Trigger Rate Max 20KHz Occupancy < 1% for pixel detector Pixel size 50 * 425  m 2 Tracking Resolution 50micron for displacement High precision at mechanical construction ~ 25 micron for internal Material Budget ~ 1% of radiation length Technology: Pixel detector developed for ALICE experiment at LHC. Budget: –RIKEN : Ladders and Front End Module –DOE: Mechanical and infrastructure –Ecole Polytechnique :SPIRO board

44 PIXEL (Sensor and Readout) Pixel size(  x z ) 50 µm x 425 µm Sensor Thickness 200  m  r  = 1.28cm,  z = 1.36 cm (Active area) 256 x 32 = 8192 channel / sensor 4 chip / sensor 4 sensor / stave Readout by ALICE_LHCB1 chip Amp + Discriminator / channel Bump bonded to each pixel Running 10MHz clock ( RHIC 106nsec ) Digital buffer for each channel > 4  sec depth Trigger capability > FAST OR logic for each crossing 4 event buffer after L1 trigger

55 PIXEL (Sensor and Readout) Readout by ALICE_LHCB1 chip Amp + Discriminator / channel Bump bonded to each pixel Running 10MHz clock ( RHIC 106nsec ) Digital buffer for each channel > 4  sec depth Trigger capability > FAST OR logic for each crossing 4 event buffer after L1 trigger

66 Pixel detector ladder Sensor module consists of 4 ALICE Pixel readout chips Bump-bonded to silicon sensor Sensor Thermo plate + cooling ALICE LHCB1 chip SensorSensor Module

77 Pixel detector ladder Sensor module consists of 4 ALICE Pixel readout chips Bump-bonded to silicon sensor Sensor Thermo plate + cooling One readout unit, half stave, made from two sensor modules ALICE LHCB1 chip SensorSensor Module

88 Pixel detector ladder Sensor module consists of 4 ALICE Pixel readout chips Bump-bonded to silicon sensor Sensor Half stave is mounted on the support structure Thermo plate + cooling One readout unit, half stave, made from two sensor modules ALICE LHCB1 chip SensorSensor Module

99 Pixel detector ladder Sensor module consists of 4 ALICE Pixel readout chips Bump-bonded to silicon sensor Sensor Half stave is mounted on the support structure Thermo plate + cooling Pixel BUS to bring data out and send control signal in to the readout chip is mounted on the half stave Half stave Pixel BUS Data One readout unit, half stave, made from two sensor modules ALICE LHCB1 chip SensorSensor Module

10 Pixel detector ladder Sensor module consists of 4 ALICE Pixel readout chips Bump-bonded to silicon sensor Sensor Half stave is mounted on the support structure Thermo plate + cooling Pixel BUS to bring data out and send control signal in to the readout chip is mounted on the half stave Each detector module is built of two half staves, read out on the barrel ends Half stave Pixel BUS Data One readout unit, half stave, made from two sensor modules Full stave 22cm 1.4cm ALICE LHCB1 chip SensorSensor Module

11 Bus structure Power 50  m Al GND 50  m Al 6 layers structure GND, Power and 4 signal lines Signal 2; (Vertical line) line connected with pixel chip with wire bonding Signal 4; (for manufacture reason) Signal-4 3  m Cu Signal-3 3  m Cu Signal-2 3  m Cu Signal 1; (for Surface Mount Device) Signal-1 to Signal-4 are connected with through hole Signal lines; 60  m pitch Material Budget; Total ~ 0.26 % Final configuration Signal-1 3  m Cu Signal 3; (Horizontal line) send signal to Pilot Module connected with vertical line with through hole Thermo-plate Sensor module Wire bonding Al Power Al GND Through hole Signal layer Total 188 lines 25cm long 1.4cm wide

12 Pixel Readout Overview Half stave 11cm 60cm Bus (25cm ) + Extender (<35cm)

13 Major components Status ComponentStatus #delivered (needed) Sensor Module Ordering new module and rework 69 good one (128) Bus Under Production5 sets of R/L (64) Extender FPC production done Under SMD parts population 80 (80) SPIRO board Under ProductionSummer 2009(66) FEM Under productionReady by end of Aug.(33) Stave Under production 5 are tested and delivered (32) Ladder Assembly Production started 1 st :manual assemble 2 nd : using assembly fixture (32)

14 Test beam at 120GeV Proton Stripixel Pixel Proton FERMILAB Meson Test area 120 GeV Proton 5-30mm beam spot 4.5 sec spil per 1 min. 2×10 10 proton / spil Independent DAQ for Pixel and Stripixel. Using trigger scintillation counters Stripixel 3 Prototype ROC Trigger: Beam defining Scinti. DAQ : SVX4+ ROC+RCC Pixel 3 Prototype pixel ladder Trigger: Scinti * FAST_OR (3layer) DAQ: Prototype Readout + PHENIX DAQ

15 Pixel performance Residual  res = 6.1  m  res = 57  m Row directionColumn direction Residual [  m] count Intrinsic resolution row : 14  m column : 152  m Un-convolute Fit include all 3 layers hit position Multiple scattering effect

16 Sensor Module Status We need 120 sensor module for 30 ladder plus spares. 69 Useable Class I sensor Modules. 51 Class III sensor module will be reworked until September 2009 and probed for 2 months. 55 brand new sensor module will be purchased under paper work going.

17 Class I702chips Class II175 chips Class III538chips We need 271 chips for reworking and new sensor modules. Readout Chip

18 Readout Bus Sensor 10cm Bus Extender Total < 60cm (70cm) Line/space are 30 /30 micron Bus and extender are connected by the fine pitch connectors. Type Bus: Left and Right Extender: 34cm long 30cm long 29cm long

19 Bus Production Status All process for bus productions has been established. 40 Left and 40 Right plus are needed. 5 set of Bus was fabricated as pre- production. Left version is fine for production, Right version is under confirmation. 1 st Production is starting.

20 Extender 80 extenders are needed in total. 5 extender was produced as pre- production and confirmed with ladder, SPIRO and FEM. Production of total 80 extender was done except trivial surface mount connecters implementation.

21 Stave Finalized the specification on Feb staves plus spares are needed. LBNL delivered to RIKEN 5 staves. 20 staves are waiting for survey. Remainders will be delivered end of June 2009.

22 Spread glue on stave with mask take 0.2 hours will be reduced measuring point Paint glue using mask and manual paddle. Glue thickness are well controlled 80 micron +-10micron Assembly procedure: (1) gluing

23 Assembly procedure : (2) aligned sensors on stave X[mm] Y[mm] +-10 micron

24 Assembly procedure: (3) wire bonding

25 Assembly procedure: (4) Encapsulation of wire Wire vibrates in magnetic field due to the intermittent current associated with level 1 trigger and may break stave sensor Bonding wire barrier Potting glue 1mm No encap ~ 5.9KHz Resonance

26 Ladder assembly Status Prototyping is completed. Production is started –Ladder 1 : Class II sensors and real stave/bus Manual assemble for fall back solution. Finished gluing stave-sensor-bus. Under wire bonding –Ladder 2 : Class II sensors and real stave/bus Sensors are glued on the stave by using assembly fixtures. Bus will be glued by manually.

27 Multiplex data from ladder and control readout chip Reference voltage Serial data transmission to FEM by optical link Radiation hard for all components. Low jitter crystal for high speed link. Voltage regulator for ladder. Production just started and will be finished before 2009/08. SPIRO Board by Ecole Polytechnique Front End Module by Stony Brook University Receiving data from SPIRO and transmit to PHENIX DAQ with specified format VME base board for slow control/diagnostic. Not Radiation hard. 1 st production board is under exhaustive tests. All boards are under assembly and will be ready by end of 2009/08.

28 Schedule Sensor module Ladder Assembly Readout Electronics SPIRO board: Production done before 2009/08 FEM : Under production and tested until 2009/08

29 Issue Sensor module reworking and additional production. –Long lead time. We already discussed with VTT/CERN. –May impact schedule. Ladder assembly had some technical difficulties and has been resolved. –Manual gluing for bus is established.

30 Summary Production of pixel ladder has been started. –Technical issues on the ladder assembly was resolved. –More sensor modules are ordered. Readout electronics will be ready by 2009 Fall.