PNPI / University of Florida Checking PC Timing Lev Uvarov CSC Time Synchronization Meeting May 12, 2009.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
HCAL Trigger Primitive Generator Tullio Grassi University of Maryland September 2004.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
1 The TrackFinder GUI D. Acosta, L. Gray, N. Park, H. Stöck University of Florida.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
SP – DDU DATA FORMATS Preliminary by Lev Uvarov Trigger Meeting at UCLA December 2001.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on “Muonic Timing” of CSC Electronics
904 Status Recall last Group Meeting…
Timing/Synchronization Status
Update on CSC Endcap Muon Port Card
CSC Synchronization Procedure and Plans
TTC signals: Global Trigger and Global Muon Trigger
CSC EMU Muon Port Card (MPC)
Muon Track-Finder Trigger
“Golden” Local Run: Trigger rate = 28Hz
CMS EMU TRIGGER ELECTRONICS
Overview: Introduction to LHC Overview of CMS
Calorimeter Trigger Synchronization in CMS,
TTC system and test synchronization
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
TMB and RAT Status Report
Trigger system Marián Krivda (University of Birmingham)
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
Configuring the Peripheral Crates
Sector Processor Status Report
FED Design and EMU-to-DAQ Test
Plans for the 2004 CSC Beam Test
Presentation transcript:

PNPI / University of Florida Checking PC Timing Lev Uvarov CSC Time Synchronization Meeting May 12, 2009

PNPI / University of Florida Synchronization Meeting – May 12, Lev Uvarov 2 Trigger Timing Model for a TTC Command TTCci LHC Clock & Orbit CCBMPC CCB SP CORE AF Fiber 1 Fiber 3 SP CORE AF Fiber 180 Fiber 177 T = CONST MS T = (TTC=>CCB) + TTCrx + (MPC=>SP) + SPAF On a TTC_Resync command SPs equalize all 180 timing path latencies by adjusting the Alignment FIFO (AF) word count. TTC_BC0 takes the same path, except for going through TMB or (TMB => ALCT => TMB) If (TMB => ALCT => TMB) == Const then all BC0 path latencies also remain equal Brown – fiber delay; fixed, but presumably not equal Blue – adjustable latency SP CSR_AFD TTCci CCBMPC TMB

PNPI / University of Florida Synchronization Meeting – May 12, Lev Uvarov 3 Hardware test We can check that model works fine

PNPI / University of Florida Synchronization Meeting – May 12, Lev Uvarov 4 MPC Setup Set MPC in Transparent mode with CSR4 Load Link X <= Nx Where N = (TMB #) × 2 + (LCT #) - 1 TMB # = 1,…,9 LCT # = 0,1 Pick TMB #1, LCT #0 as a reference for Link 1 Pick others in turn for Link 2 & Link 3 <= N3Link 2 <= N2Link 1 <= N11

PNPI / University of Florida Synchronization Meeting – May 12, Lev Uvarov 5 SP Setup Configure CSR_DFC/MA/DD/W/0x81F1: DDM = 1 => VME readout mode FxA = 1 => readout only Front FPGAs, x = 1, …, 5 ZS = 0 => no zero suppression TB = 1 => readout 1 time bin only Issue TTC Resynch Configure CSR_FCC/MA/VM/W/0x0100 Issue L1A with ACT_FCC/MA/VM/W/0x8000 Read out DAT_DF/MA/DD/R DDMSPADTAF5AF4AF3AF2AF1AZSTB2TB1TB0 8 1F1

PNPI / University of Florida Synchronization Meeting – May 12, Lev Uvarov 6 ME Data The MEx Data word is present in the ME Data Block, if two conditions are met: The corresponding FnA bit is set to 1 (ACTIVE) and Either (ZS==0), or (ZS==1 AND VPx==1). The muon order always goes from ME1a to ME4c.