LARP Collaboration Meeting Racetrack Coil Fabrication

Slides:



Advertisements
Similar presentations
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Vacuum Vessel Production Readiness Review
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
BNL Progress with LR, application to LQ
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXC Nb-Ti 120mm 120T/m 2m models
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
ESAC Review February 2013 CEA Saclay
SQXF Mirror QXFSM1 Strain Gauges
ERMC/RMM activities May 2017
LARP Vertical Test Facility
FRESCA2 Update on the dipole design and new calculations
the MDP High Field Dipole Demonstrator
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
MICE Coupling Coil Update
MQXF updates P. Ferracin October 9th, 2014.
Coil Fabrication Status
Presentation transcript:

LARP Collaboration Meeting Racetrack Coil Fabrication Jesse Schmalzle, BNL 04/27/06 June 27, 2006 J. Schmalzle

SR Coil Fabrication Two short racetrack (SR) coils fabricated using LBL supplied tooling and coil parts: June 27, 2006 J. Schmalzle

SR Coil Fabrication Coils assembled into LBL supplied support structure: Bladder pressurized to 4500 psi (31 MPa). Average shell stress = 7500 psi (52 MPa). Preparing for cold test, estimate end of May. June 27, 2006 J. Schmalzle

LR Coil Design Long racetrack design closely matches that of short racetrack: Double layer pancake made from single length of cable. Transition between layers at lead end pole tip. Iron pole coated with aluminum oxide. Fiberglass sock cable insulation. Pole width (uncoated) = 37.19 mm (1.464 in.) Coil straight section length = 3.45 m (136 in.) Coil overall length = 3.61 m (142 in.) June 27, 2006 J. Schmalzle

LR Coil Design Variations as dictated by increased length /experience with SR coils: Segmented pole – 5 segments Allow for release of winding tension Allow for differential expansion/contraction during reaction. Gaps at reaction start = .42 mm/m minimum. Full length stainless steel rails (SR used horse shoe). Aluminum oxide thickness increased to 0.25 mm (.010 in.) (SR used .13 mm (.005 in.)). Increased protection against shorts to pole. June 27, 2006 J. Schmalzle

LR Coil Design Variations (continued): Trace and glass cloth cover rails (covered coil only in SR). Eliminate the need for precise cutting and placement that is required to cover the coil turns without covering the rails. Glass cloth added between layers Ease concern over greater potential for shorts between layers. Reaction stack up, cavity set by pusher (tooling): June 27, 2006 J. Schmalzle

LR Coil Design Variations (continued): Instrumentation trace to include quench protection heaters. Increase argon flow during reaction. Improve removal of contaminates that may contribute to shorts to the pole. Use higher flow rate below 400 C as palmitic acid is vaporized. 25 cfh up to 400 C, then drop to 10 cfh (SR was 3 cfh throughout). Impregnation stack up, cavity set by pusher (tooling): June 27, 2006 J. Schmalzle

LR Coil Design Coil Assembly: G10 sheet and SST skin installed over impregnated coil. Skins bolted to rails Keys align individual pole segments. Residual gaps in pole filled prior to impregnation. G10 shims between coil and rails sized based on cable & part measurements. Ends contained by pushers attached to rails. June 27, 2006 J. Schmalzle

LR Coil Fabrication Insulated cable is transferred to winding spools: Measured & divided onto 2 pancake spools. One installed on winding machine carriage, other mounted above coil pole for use on second layer. Cable vacuumed and checked for debris using lump detector. Cable tension automatically monitored & controlled. June 27, 2006 J. Schmalzle

LR Coil Fabrication Coil Winding: Semi-automatic computer controlled winding machine Existing machine, new platform and shuttle. Pneumatic clamps to hold coil while opposite side is wound. Wind on reaction base plate. 25 lbs cable tension. June 27, 2006 J. Schmalzle

LR Coil Fabrication Reaction: Shim coil and close fixture to provide ~1000 psi (7 MPa) side load. Automatic computer controlled cycle. Gas tight oven with continuously flowing argon atmosphere. Supply fed directly into reaction fixture. June 27, 2006 J. Schmalzle

LR Coil Fabrication Epoxy Impregnation: Lead stabilizer solder fixture mounts to base plate. Coil / Impregnation fixture to hang vertically in vacuum tank. CTD 101K epoxy resin. Automatic computer controlled cycle. 3 strip heaters/side–1500 Watts ea. June 27, 2006 J. Schmalzle

LR Coil Fabrication Epoxy Impregnation: Fixture completely sealed. Epoxy fed into bottom of fixture. Outlet at top connected to resin trap. Top of trap connected back to vacuum tank. June 27, 2006 J. Schmalzle

LR Coil Handling Fixture Lifting: Limit coil strain to less than .05% (1/4 of conductor strain limit) Reaction & impregnation fixtures require only 2 point support. Beams mount to sides of fixture in 2 places, lift from center. Use for: Transport Up-righting Flipping Max Strain < .01% Max deflection < .003” (.08 mm) June 27, 2006 J. Schmalzle

LR Coil Handling Coil Lifting: Support Fixture Lifting: Beam picks up coil using holes in rails. Max strain < .01 % Max deflection < .001” (.03 mm) Support Fixture Lifting: Collars clamped around shell. Same beams / spreader as reaction & impregnation fixture lifting. Up-right and hang in prep stand for connection to testing top hat. Max strain < .01%. Max deflection < .003” (.08mm). June 27, 2006 J. Schmalzle

LR Coil Handling Prep Stand: Hang impregnation tool for mounting to vacuum tank top plate. Hang coil support structure for mounting to vertical cold test dewar top plate. June 27, 2006 J. Schmalzle

LR Assembly Insertion of coils into support structure. Existing long flat table. Existing hydraulic cylinder Coil insertion. Bladder removal. June 27, 2006 J. Schmalzle

LR Part / Tooling Status Coil Parts: Drawings released, shop is fabricating, completion estimate 4/28/06. Winding machine shuttle and clamps: Reaction tooling: Drawings released, shop is ordering material. Reaction oven: Order placed with L&L, estimated delivery 7/7/06. Impregnation tooling: Drawings released, shop is estimating. Fixture lifting beams & coil lifting beam: Drawings released, material on order, completion estimate 5/30/06. June 27, 2006 J. Schmalzle

LR Plan and Schedule Copper coil, estimate start winding 6/15/06. Wind and impregnate only. Required parts, expected dates: winding machine, 5/25/06. reaction base plate, 6/15/06. coil parts, 5/30/06. impregnation tooling, 6/22/06. lifting fixtures, 5/30/06. Coil Production, estimate start winding 8/7/06. 2 coils from good cable, 3rd if necessary. reaction tooling, 7/14/06 reaction oven (installed & tested), 8/21/06. Coil Assembly, estimate start 11/1/06. Cold testing, estimate start 12/27/06. June 27, 2006 J. Schmalzle