SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007.

Slides:



Advertisements
Similar presentations
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Advertisements

Supplier Contract Management © 2006 Oracle Corporation – Proprietary and Confidential 2. Author & Negotiate 5. Amend4. Monitor and Track 6. Renew & Closeout.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
FDOT Central Office ITS Software Update
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14,
Logging In Go to web site:
WELCOME TO SKYWARD EMPLOYEE ACCESS Step 1
Workflow & Event Derivation Workshop
Workflow & Event Derivation Workshop
Maintaining and Updating Windows Server 2008
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
© 2008 QUALCOMM Incorporated. External presentation to (audience), prepared by QUALCOMM’s (presenters name) – Month Day, 2008 Hours of Service Driver Training.
Monitoring and Troubleshooting Chapter 17. Review What role is required to share folders on Windows Server 2008 R2? What is the default permission listed.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
Statewide Transportation Management Center Software Library System Status Meeting February 17, 2004.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.0 August 18, 2008 August 18,
Module 13: Maintaining Software by Using Windows Server Update Services.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting January 11, 2005.
Enrolment Services – Class Scheduling Fall 2014 Course Combinations.
Module 7: Fundamentals of Administering Windows Server 2008.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
TxEIS Security A role-based solution October 2010.
Smartphone Application for Road Rangers Tucker Brown Roger Strain Robert W. Heller, Ph.D. Southwest Research Institute San Antonio, Texas USA.
Windows Vista Inside Out Chapter 22 - Monitoring System Activities with Event Viewer Last modified am.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting August 27, 2007.
SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.
SunGuide SM Software Development Project Release 3.0 Design Review May 8-9, 2007.
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
Overview Managing a DHCP Database Monitoring DHCP
IPortal Bringing your company and your business partners together through customized WEB-based portal software. SanSueB Software Presents iPortal.
Slide #1 Computerised Transit Computer System Training Session Trader Application Users.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
SunGuide SM Software Development Project Release 3.0 Design Review May 2-3, 2007.
Using Event Viewer Event Levels Creating Custom Views Windows Logs Monitoring Performance.
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting October 1, 2007.
SunGuide SM Software Development Project Status Meeting April 29, 2004.
SunGuide SM Software Development Project Status Meeting October 13, 2004.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting April 27, 2004.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
People First System Enhancements Release 1 B Manager and Employee Workshop February 2006.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
1 Incursion Response System (IRS) Logistics. IRS Logistics 2 What will you learn? During this session we will cover: How to enter and maintain staff details.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Chavez, Melesan Karen De Luna, Lin Detera, Patrick Kevin Martinez, Jellene Joy Dental Clinic Database System Functional Requirements.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
SunGuide SM Software Development Project Software Design Review May 12, 2004.
Maintaining and Updating Windows Server 2008 Lesson 8.
Wildfire Costing (WFCST) for Recorders A component of Wildfire One Fire Season 2016.
SQL Database Management
Architecture Review 10/11/2004
Smart Phone App for Road Rangers
MCU cluster Cristian Alexe 18 October 2010.
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:50
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Agenda Time Item Lead 10:00 – 10:05 Introductions Liang Hsia
Texas Student Data System
SunGuideTM Software Development Project Release 3
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:45
SunGuideSM Software Development Project Status Meeting and Demonstration April 5-6, 2005 CDRL
Presentation transcript:

SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007

November 27, 2007SunGuide TRR Meeting 2 Agenda TimeItem Lead 8:00 – 8:15Introductions Tillander 8:15 – 8:25Logistics District 4 8:25 – 8:45Discuss Project Status Robert Heller / John Boguslawski 8:45 – 9:00Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Robert Heller / John Boguslawski 9:00 – 9:15Open Discussion All

November 27, 2007SunGuide TRR Meeting 3 Introductions

November 27, 2007SunGuide TRR Meeting 4 Agenda TimeItem Lead 8:00 – 8:15Introductions Tillander 8:15 – 8:25Logistics District 4 8:25 – 8:45Discuss Project Status Robert Heller / John Boguslawski 8:45 – 9:00Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Robert Heller / John Boguslawski 9:00 – 9:15Open Discussion All

November 27, 2007SunGuide TRR Meeting 5 Logistics District 4 staff will discuss: –Test area –Resources available

November 27, 2007SunGuide TRR Meeting 6 Agenda TimeItem Lead 8:00 – 8:15Introductions Tillander 8:15 – 8:25Logistics District 4 8:25 – 8:45Discuss Project Status Robert Heller / John Boguslawski 8:45 – 9:00Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Robert Heller / John Boguslawski 9:00 – 9:15Open Discussion All

November 27, 2007SunGuide TRR Meeting 7 Current Project Status: From a Development Perspective Solid: –511 –VSL –CE –AD CCTV Driver –EV –Web Server –EM –RS –AVL/RR –IDS –ODS –RPG What is not ready: –Some Responder Audit screens (2 of 7 are not complete)

November 27, 2007SunGuide TRR Meeting 8 Responder Audit Requirements Some will not be tested this week SunGuide Req. IDRequirement EM011 The responder audit function shall provide the capability to add, delete, or edit responder agency timeline, vehicle response timeline, and responder activity data in the SunGuide database. EM001U All operator changes shall be logged in the database for traceability, including the new value, previous value, the user who made the change, and the time the change was made. EM002U All operator changes shall be displayed in the chronology report with an indication that specific information has been changed. EM003U The operator shall be able to run a report using the SunGuide report function to review changes made and logged by the audit function. EM004U The operator shall have at least three ways to select an event: (1) by typing in the event number directly; or (2) selecting from the list of active events, or (3) selecting from a filtered list of all events. EM004U1 The operator shall be able to filter events by month, location, type, blockage, or responding agency involved. EM020G A Responder Audit screen shall be incorporated into the existing audit feature of the SunGuide GUI, using the existing permissions scheme and user authentication methods of the SunGuide GUI. EM020G1 The operator shall be able to add, delete, or edit agency notification, on-scene, and departure times. EM020G2 The operator shall be able to leave any of the fields blank in case that information is not available, except that a record must have at least one timestamp entered. EM020G3 The operator shall be able to add, delete, or edit vehicle response records for agencies with responding vehicles (Road Ranger, SIRV, etc.).

November 27, 2007SunGuide TRR Meeting 9 Responder Audit Requirements Some will not be tested this week - continued SunGuide Req. IDRequirement EM020G4 The operator shall be required to provide the notification time and either the arrival and departure times or the cancellation time. EM020G5 The operator shall be able to add, edit, and delete activity records associated with vehicle response records. EM020G6 The software shall require the operator to enter the time that an activity was performed, however the software shall also require the timestamp to fall within the arrival and departure timestamps for the vehicle record. EM020G7 The GUI shall warn the user when a timestamp is entered which is earlier than the event start time or later than the event closed time. EM020G8 The operator shall have the option to enter a quantity associated with an activity, such as gas, when the activity is configured as "quantifiable". EM020G9 The GUI shall display a summary of all the agency response times, the detailed vehicle response time records, and all the activities performed. EM020G10The GUI shall display the event location, event number, and blockage history for an event. EM020G11 The GUI shall provide an event chronology summary window with the ability to generate a report. EM021GA comments field shall be provided for the operator to enter free-text data. EM012Activities shall be classified in the software as quantifiable or not.

November 27, 2007SunGuide TRR Meeting 10 Forward Looking Schedule IV&V – TERL (FDOT/PBS&J led activity): –Dry Run: Nov 26 – Nov 30 –Actual Test: Dec 3 – Dec 7 Installs: –Nov 26: TERL –Nov 12-26: D4 –Dec 3-7 : D5 –Dec 3-7 : D6 –Dec 10-14: D2 (may start early) –Dec : D7 (may start early)

November 27, 2007SunGuide TRR Meeting 11 Agenda TimeItem Lead 8:00 – 8:15Introductions Tillander 8:15 – 8:25Logistics District 4 8:25 – 8:45Discuss Project Status Robert Heller / John Boguslawski 8:45 – 9:00Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Robert Heller / John Boguslawski 9:00 – 9:15Open Discussion All

November 27, 2007SunGuide TRR Meeting 12 Purpose of TRR / FAT Purpose: –Review preparations for testing –Walk through the test procedures at a very high level and determine if anyone has any comments Ground Rules: –Testing will not depart from the written procedures –Any requested “ad hoc” testing will occur after the formal testing process –Re-writing of requirements / scope additions will be captured for future consideration Approvals: –FDOT/SwRI will witness each test case (on “Master SICP”) –At the conclusion, FDOT will sign SICP cover page to acknowledge all tests were executed as written/noted in the “Master SICP”

November 27, 2007SunGuide TRR Meeting 13 Hardware Configuration District 4 staff to describe hardware environment

November 27, 2007SunGuide TRR Meeting 14 Release 3.0 Integration Cases IC-1: Configuration Editor (CE) IC-2: Variable Speed Limit (VSL) IC-3: American Dynamics Closed Circuit Television (AD CCTV) Driver IC-4: 511 (511) IC-5: Web Server (WS) IC-6: Automatic Vehicle Location (AVL)/Road Ranger (RR) IC-7: Incident Detection Subsystem (IDS) IC-8: Event Management (EM) (includes Responder Audit) IC-9: Response Plan Generation (RPG) IC-10: Reporting Subsystem (RS) IC-11: Event Viewer (EV) IC-12: Operational Data Store (ODS) IC-13: General Subsystem Updates (GEN)

November 27, 2007SunGuide TRR Meeting 15 FAT 3 Limitations Two of the Responder Audit screens have not been completed (5 are available for testing) Comment: D5 has an install (and using operationally) the following R3.0 components: –511 –AD CCTV Driver –VSL –Web Server –Release 3.0 core components (C2C, GUI, MAS, Data Bus, TSS)

November 27, 2007SunGuide TRR Meeting 16 Test Case Example

November 27, 2007SunGuide TRR Meeting 17 Questions About Test Cases?

November 27, 2007SunGuide TRR Meeting 18 Agenda TimeItem Lead 8:00 – 8:15Introductions Tillander 8:15 – 8:25Logistics District 4 8:25 – 8:45Discuss Project Status Robert Heller / John Boguslawski 8:45 – 9:00Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Robert Heller / John Boguslawski 9:00 – 9:15Open Discussion All

November 27, 2007SunGuide TRR Meeting 19 Open Discussion