Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.

Slides:



Advertisements
Similar presentations
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Advertisements

Automatic Conditioning J. Alberto Rodriguez. Outline Purpose of an automatic conditioning system General overview Fast signals Long term access to data:
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Status of Construction and Commissioning of the GSI HITRAP Decelerator Outline:
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Beam diagnostics in the beamlines
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
HIE-ISOLDE Project Status Report
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
The HIE-ISOLDE Faraday Cup
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
S A Griffiths CM42 June 2015 Electrical & Control.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
NICA injection complex status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Performance of BI systems at HIE-ISOLDE
Installations up to Start of Commissioning
Hollow e- lens, Cryogenic aspects
RF operation of REX-ISOLDE
DC Injector and Space Charge Simulation Status
How to run ions in the future?
Beam instrumentation for HIE-ISOLDE
Alexander Herlert, CERN (PH-SME-IS)
LINAC4 commissioning plans etc.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
MEBT1&2 design study for C-ADS
The SPL-based Proton Driver at CERN
Ideas for REX/HIE-ISOLDE Upgrade
Presentation transcript:

Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team

Content: Introduction Hardware commissioning Commissioning with beam Status of the RF amplifiers Summary Jose Alberto Rodriguez, BE-OP-PSB (x167538) 74 th ISOLDE Collaboration Committee Meeting /11/10

RF Systems: Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam from EBIS 5 keV/u Beam to HIE-ISOLDE 2.85 MeV/u Magnets: Triplets6 Doublets1 Steerers1H, 1V Triplet IHSRFQ Buncher 7gap 17gap 27gap 39gap Triplet Doublet HV Steerer Power converters: 200 A, 50 V20 (1 spare) bipolar 3.5 A2 Diagnostics: REXHIE-ISOLDE FC MCP Collimator apertures Beam attenuators FC Si detector Scanning Slits Collimator apertures Diagnostics Introduction Sectors10 Turbopumps~20 Cryopumps3 Gauges~25 Vacuum (incl. low energy): RF Structure Final Energy [MeV/u] 4-rod RFQ0.3 Buncher0.3 IHS1.2 7gap gap gap gap th ISOLDE Collaboration Committee Meeting /11/10 Beam produced or charge-bred in the EBIS is injected into the REX linac and accelerated to 2.85 MeV/u before it is sent to the superconducting linac

Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam from EBIS 5 keV/u Beam to HIE-ISOLDE 2.85 MeV/u Triplet IHSRFQ Buncher 7gap 17gap 27gap 39gap Triplet Doublet HV SteererDiagnostics Hardware commissioning 74 th ISOLDE Collaboration Committee Meeting /11/10 Power converters and magnets (ready before wk. 25): New power converters for quads (19 units) New cooling water circuits for all the quads operational Electrical short in last triplet repaired and triplet refurbished Additional tests and measurements in other quadrupoles completed (thermal switches, temperature rise…) Vacuum (ready before wk. 25): Scheduled maintenance completed. Faulty turbo pumps, controllers and gauges replaced Fast Penning gauges for fast acting valve to protect cryomodule installed Controls (ready before wk. 25): New low level controls functional (new power converters, RF amplifiers…) High level applications updated (working sets and equipment arrays ready) RF systems Maintenance and refurbishment of amplifiers for the six first structures. DC converters (incl. the spares) refurbished, HV diode repaired, new cooling… Temporary 9gap amplifier has been refurbished, installed and ready since wk. 25. New low loss RF line. PLC software for amplifiers upgraded Connection to the new HIE-ISOLDE RF reference line

Commissioning with beam Stage 1: REX diagnostics box: Commissioning with beam started on wk. 25 (June 16 th ) Beam with an A/Q=4.0 was accelerated to 0.3 MeV/u (RFQ output energy) We reached the first diagnostic box and re-commissioned the FC, MCP and collimator wheel on wk. 25 Beam transmission through RFQ for different power levels on wk. 26 Beam in FC after RFQ for different collimator aperture sizes (15, 5, 3 and 1 mm) MCP image of the beam after the RFQ Diagnostic box: FC, MCP, Collimator Wheel, Beam attenuators Jose Alberto Rodriguez, BE-OP-PSB (x167538) wk. 25 // 0.3 MeV/u IHSRFQ Buncher 7gap 17gap 27gap 39gap Diagnostics Beam transmission thru the RFQ vs RF power for A/Q= th ISOLDE Collaboration Committee Meeting /11/10

Stage 2: First HIE-ISOLDE diagnostics box: First diagnostics box of HIE-ISOLDE installed at the end of wk. 27 First beam in FC and to the Si detector with 0.3 MeV/u energy on wk. 28 Systematic characterization by E. D. Cantero and S. Sadovich on wk. 33 and after Commissioning with beam Jose Alberto Rodriguez, BE-OP-PSB (x167538) wk. 28 // 0.3 MeV/u IHSRFQ Buncher 7gap 17gap 27gap 39gap Diagnostics Screen shot of BI expert application Beam in Faraday Cup Beam signal in Si detector after pre- amplifier in “oscilloscope” mode Diagnostic box: FC, Si detector, Scanning slit, Collimator slit Quad scan using scanning slits (I = 15 pA) 74 th ISOLDE Collaboration Committee Meeting /11/10

Commissioning with beam Jose Alberto Rodriguez, BE-OP-PSB (x167538) IHSRFQ Buncher 7gap 17gap 27gap 39gap Diagnostics Stage 3: Commissioning and phasing of RF Structures in REX: Cavities and their amplifiers were commissioned after they were turned on by the RF team Several problems in the different RF systems were discovered and solved at this time Finally, operational settings (phases and amplitudes) for all RF cavities were determined Energy spectrum around zero- crossing phase of the buncher Phasing of the first 7gap structure Energy of the beam for different phases and amplitudes out of the 9gap wk – 2.85 MeV/u 74 th ISOLDE Collaboration Committee Meeting /11/10

Status of the RF amplifiers Jose Alberto Rodriguez, BE-OP-PSB (x167538) IHSRFQ Buncher 7gap 17gap 27gap 39gap RF amplifiers have been very stable and reliable since week 36 Only one short intervention for the 7gap1 was necessary during the commissioning with beam and operations of HIE-ISOLDE (negligible downtime) The average and peak powers were not very demanding (repetition rate was 10 Hz or lower)  We will need to confirm reliable operation under the more demanding conditions needed for next year  Several cooling fans have failed and will need to be replaced during the winter shutdown 74 th ISOLDE Collaboration Committee Meeting /11/10 Status of the final 9gap amplifier:  The final amplifier was supposed to be ready for the start of the physics program this year  The delivery was delayed and the RF group provided a temporary amplifier that has been used during the physics run this year after some modifications  This amplifier is limited in peak power and duty cycle and will introduce many constrains in the physics program next year if it is not replaced  The final amplifier failed an acceptance test conducted on wk. 36 in the company headquarters  The situation had improved by wk. 41 when the next visit to the company took place. However, several non-conformities were found  New visit plan in ~ 2 wks of two CERN experts to help the company solve the problem  Best case scenario: problem solved and amplifier ready for delivery before the end of the year

Summary Jose Alberto Rodriguez, BE-OP-PSB (x167538) Hardware refurbishment and commissioning :  Hardware refurbishment and commissioning all systems other than some of the RF completed finished before the start of the commissioning with beam on wk. 25  RFQ, buncher and 9gap (temporary amplifier) ready on wk. 25  The hardware recommissioning of the rest of the amplifiers took a few additional weeks  Due to delay in delivery of the final 9gap amplifier, we had to use the temporary amplifier (constrains in maximum A/Q and time structure deliver to users) Commissioning with Beam:  Commissioning started in wk. 25 and progressed as hardware was ready  12 C 4+ beam produced in the charge breeder has been accelerated to 2.85 MeV/u (REX nominal final energy) on wk th ISOLDE Collaboration Committee Meeting /11/10 Status of the final 9gap amplifier:  Acceptance tests in wk. 36 and wk. 41 showed that the amplifier was not ready  Two CERN experts will visit the company in ~ 2 weeks to try to solve the problem