M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
Advertisements

Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
Beam Position Monitors MICE CM Harbin January, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Dec 2005Jean-Sébastien GraulichSlide 1 Improving MuCal Design o Why we need an improved design o Improvement Principle o Quick Simulation, Analysis & Results.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Detector Systems Update MICO April 7, MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
The Beam Test at Fermilab:
Luminosity Monitor Status
ScECAL+AHCAL+TCMT Combined Beam FNAL
Particle ID Diagnostics in the MICE Beamline
Presentation transcript:

M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca

Summary TOF/KL performances in 2010 run EMR status BPM/CKOV updates Integration in MICE Hall of PID detectors 2011 run and conclusions M. Bonesini – CM 292

TOF/KL performances in 2010 Smooth performances in 2010 run No major hardware problems Refurbishment of TOF0,TOF1 PMTs All described in the forthcoming MICE note – 367 M. Bonesini – CM 293

Y. Karadzhov, MICE CM29 15/02/11 Any kind of beam settings are OK. We need >100 events in each pixel. For this particular example we will be able to calculate the relative trigger delays only in the pixels inside the red area. Requirements for calibration of the trigger station

Y. Karadzhov, MICE CM29 15/02/11 Requirements for calibration of the other stations We need electrons. => We need electron beam. The important is the number of hits in the central pixel of each slab. We need > events in these pixels. For the example here we will be able to have a calibration only in the green area in the centre.

TOF performances in 2010 run M. Bonesini – CM 296 Time resolution after calibration: TOF0 – 51ps; TOF1 – 58ps; TOF2 – 52ps.

TOF stability during 2010 run M. Bonesini – CM 297

8

9

TOF0+TOF1 refurbishing many PMTs of TOF0 are very old (bought in 2006 by Alain and others in 2007) and have an old design of the active divider and the valve insulation from mu metal, giving a lot of problems (spikes …) Hamamatsu Japan kindly agreed to refurbish them (kapton insulation/new active divider) if back to firm before 31/12/2010: after it they say it would be OUR problem So in early September we dismounted the first PMTs to be sent back to Japan (MB,GC,RB) and the operation was redone in December (MB,AB,RB) during the Heathrow blockade. In total ~ 50 PMTs were sent back: clearly the operation was not done in a single shot. TOF0 has been refurbished and put back in DSA with newer PMTs (about 20 out of 40), TOF1 is in Milano under refurbishing M. Bonesini – CM 2910

11 TOF0/TOF1 maintenance operations at RAL TOF0 refurbished M. Bonesini – CM 29

12 R4998 window We need some input for the possible releases of He in the Hall Up to now some preliminary discussions with M. Courthall, Andy, … The idea is to test a R4998 PMT with a mixture of 3%He+97%N2 to see at what level problems begin to show up (measure t) He poisoning of R4998 PMTs

Test system layout M. Bonesini – CM 2913 PMT under test He/N2 mixture inlet system Acq system Tight box for testsHV He poisoning will show up with afterpulses on long test periods (days/months) monitor of dark currents may be enough test system under preparation in MIB needs He measurements in the Hall Yap:Ce source

M. Bonesini – CM 2914 Cerenkov

Beam Profile Monitors Small (20 X 20 cm) Large (45 X 45 cm) MICE CM RAL February, Alan Bross

Status The Electronic Noise that was seen has been completely removed – Shielding Both BPMs have been calibrated to some extent with a 60 Co source – However the activity was so low that we had some difficulty As a rate monitor the Global “Or” output from the X or Y views (or both) and X  Y gives an instantaneous beam rate measurement and should be linear up to ½ a GHz or so (we wish) – Signals are routed to MLCR – Only issue has been overheating. This was solved with the addition of an external fan on the cans that contain the MAPMT and electronics We did get some beam data with the small BPM MICE CM RAL February, Alan Bross

Small BPM Beam Data II MICE CM RAL February, Alan Bross

Upgrade The Burle MAPMTs have large non-uniformity and gain variation A number of systems at Fermilab use them Replace MAPMTs with SiPMs For us this would be easy if 1 to 1 SiPM to fiber – But then many channels! Use Winston Cone – Pin for Pin replacement of readout module Alan BrossMICE CM RAL February,

EMR M. Bonesini – CM 2919

M. Bonesini – CM 2920

MICE CM29 Feb 2011Jean-Sebastien GraulichSlide 21 EMR Production  Detector Hardware Conservative estimation: one layer per working week 18 scintillator layers already pre-assembled 48 layers by the end of September  Electronics Front-End Board (FEB) Analog amplification and discrimination) Developed by Trieste/Como Prototype is validated; first production batch launched Digitization and Buffer Board Developed in Geneva Prototype in production If the prototype works, we can equip 3 modules in June

M. Bonesini – CM 2922

M. Bonesini – CM 2923

M. Bonesini – CM 2924

M. Bonesini – CM 2925

M. Bonesini – CM 2926

M. Bonesini – CM 2927

Installation  Many constraints Beam, hall work, manpower, etc MICE CM29 Feb 2011Jean-Sebastien GraulichSlide 28

Data Taking plan  Scan momentum ( MeV/c) “Pion” beam PID using TOF Q7-Q9 Off Straight tracks Measure Muon range Test PID  Gain equalization (channel by channel) Needed to sum single energy loss 6 * 59 = 354 channels -> A lot of work ! Need single bar hits (only 10% of data) Will take a lot of time…  More detailed plan to be drawn Yordan will be the champion ! MICE CM29 Feb 2011Jean-Sebastien GraulichSlide 29

M. Bonesini – CM 2930

M. Bonesini – CM 2931

M. Bonesini – CM 2932

M. Bonesini – CM 2933

Conclusions Good performances of installed PID detectors (TOF,KL, CKOV) in 2010 run need final agreement on platform mods from F. Cadoux to schedule operations for EMR integration we eagerly wait for EMR data in July needs some data for TOF/KL recalibration M. Bonesini – CM 2934