Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013,

Slides:



Advertisements
Similar presentations
______s Room Budget Created by:. My New Room I plan on purchasing _____ items for $ ____________.
Advertisements

Whats next in your presentations?. Title Slide Background Problem Statement Solution System Diagram Electrical Circuits Mech. Drawings Code Sample(s)
Type the name of your inventor or invention here. Created by:
A POWERPOINT PRESENTATION By Add your name(s) here SOFTWARE Read and delete: You may change the order of slides if you wish. Use pictures whenever you.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
EPICS Design Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to tell.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
CS 545 Software Systems Design Project Presentation Format Lecture Created by Dan Benson Computer Science Lectures © D. Benson, 2002.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
PREPOSITIONS WITH ANGELS (Adapted by Damon Lewis from “Prepositions With Angel Babies” by M. Thrash)
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
You write the caption Thunderstorms - Chap Instructions §Write a two-sentence caption for each of the following. The first sentence has been started.
RockSat-C 2011 ISTR Individual Subsystem Testing Report Team Name School Date 1 Team Members
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
More than Just Fun and Games Strategies for Integrating Technology into the Classroom Environment.
PCB L AYOUT P LANNING AND D ESIGN. BLOCK DIAGRAM All electronic equipments can be considered as systems comprising a set of interacting elements responding.
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
Lesson 2.2 Traffic Signals  Today’s Objectives: 1. Explain what to do at a green, yellow, and red light. 2. Describe the action to take when you approach.
1 Test Slide Text works. Text works. Graphics work. Graphics work.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
Foundations of Computer Science Computing …it is all about Data Representation, Storage, Processing, and Communication of Data 10/4/20151CS 112 – Foundations.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Understanding Block Encoding and Decoding Name(s): _______________________ In the space below, create a set of building instructions so that a friend can.
Welcome This is a document to explains the chosen concept to the animator. This will take you through a 5 section process to provide the necessary details.
Sets and Set Notation What are sets? A set is a collection of things. The "things" in the set are called the "elements”. A set is represented by listing.
Color Mixing 101.
Instructions To use this Powerpoint resource please follow these steps: 1.Select which slide(s) you would like to use. 2.Right-click on the slide, under.
 In computer programming, a loop is a sequence of instruction s that is continually repeated until a certain condition is reached.  PHP Loops :  In.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Launch Readiness Review
FRACTIONS & SHAPES BY:. How many of these are colored red? * out of *.
Marian, Robin and the sheriff. Robin Record Robin’s thoughts onto this slide following the instructions below: Left click Insert Left click Movies and.
Name(s): _______________________ Encoding LEGO Blocks Additional Practice You’ve already tried encoding instructions to build a LEGO tower into binary.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Team Progress Report #2 [Team Name Here] [High School Name Here] 1 [Team logo here]
Wednesday, September 9, 2015 You need your: Cub Planner, Science Notebook, Colored Pencils today!
Basketball National 5 Lesson 8. Today we will…  Approaches to developing performance  Conditioned Game  Unit assessment (written responses)
MECHATRONICS Group # Group Members’ Names MENG 483 Project Title of the Project Spring 20XX.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
The Many Roles of Our President Created by:. List the role here Describe the role here. Insert a picture that goes along with the role. ( If one can not.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
UOP ECT 246 Week 1 iLab Power Supplies Check this A+ tutorial guideline at supplies For.
Modular Value Stream Safety Map (MOD VSSM)
Planetary Lander PDR Team Name
INSTRUCTIONS FOR NARRATION
0.0 Instrument Suite Name Presenter’s name
Blinkers ++ Team 5.
Individual Subsystem Testing Report
Stylish Black Table Features Plan 1 Plan 2 Plan 3 Plan 4 Total 49894
Name: _______________________________
RAPUNZEL RAPid NoncondUctive Nadir-Zenith TEther Laboratory
School/Team member names Date
Set A Picture As a Slide Background in PowerPoint 2007
Transformations y - x x x x.
Created by: Teresa Bruin
FRIDAY SLIDES TEMPLATE
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
ORGANIZATION'S NAME HERE:
<Your Team # > Your Team Name Here
Presentation transcript:

Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013, at For each parameter, indicate the percentage complete Color code: – Green: Confident in successful completion (4-5 blocks) – Yellow: Minor concerns (3 blocks) – Red: Major concerns (explain on “Issues” slide) (1-2 blocks) Describe Issues and Concerns on next slide Insert pictures as appropriate

Payload YOUR NAME HERE: Status Updates Payload Overview and Functional Block Diagram

Payload YOUR NAME HERE: Status Updates Status Updates % Complete Mechanical Elements Designed Mechanical Elements Fab Mechanical Elements Tested Electrical Elements Design Electrical Elements Fab Electrical Elements Tested Software Written Software Tested Subsystem Testing System Integration Full System Testing Picture ?? Mission Statement:

Payload YOUR NAME HERE: Status Updates Issues and Concerns: 1.) Power won’t latch on 2.) Trying to determine the best method of reducing shock that the science instrument experiences 3.) Laser calibration requires additional equipment that must be acquired To the left is the dummy block used to test out methods of shock reduction. Laser Test Fixture Power Supply Design Power Interconnect Design PL9PL8PL7PL6PL5PL4PL2PL1 PL3