2008 PSU Human Powered Vehicle Team Ben Bolen Erik Chamberlain Kenneth Lou Levi Patton Bryan Voytilla Product Design Specification.

Slides:



Advertisements
Similar presentations
Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
Advertisements

A Seminar Presentation On AERODYNAMICS OF F1 RACING CAR
ISSSC 2012 Snowboard Brief  Slopestyle  Judging Criteria / Scoring / Deductions / Comp format  Big Air  Judging Criteria / Scoring / Deductions / Comp.
Eddie McGovern, Adam Blake, Ryan Vogel, Alleyce Watts, and Jade O’Mara.
P14221: FSAE Aerodynamics.
The mission of the competition is to create “….a fun and exciting learning environment for young people to develop an informed view about careers in Engineering,
LUGE By: Cody VanOss Adam Marx. The Rules Males must weigh at least 198 lbs. Females must weigh at least 165 lbs. The single sled cannot weigh over 50.6.
Some Personal History  Grew up in the San Fernando Valley  BS Degree in Engineering, 1978 (CSUN)  MS Degree in Engineering, 1985 (CSUN)  PhD in Mechanical.
 Autonomous Surface Vehicle Team Leader: Stanton Coffey Team Members: Pat Gray, Jack Nagle, Sam Riahi, Matt Cline Faculty Adviser: Dr. Gene Hou ME Graduate.
ACCELERATING THE FUTURE. 8” shorter 10” wider Edison 2 Very Light Car 4 passenger seating Compact suspension mounted completely within wheels Luggage.
Mike Menos, Michael Caicedo, & Jean-Pierre Sorondo EML 4551 Ethics and Design Project Organization FIU Department of Mechanical & Materials Engineering.
Computer Simulations of Wind Tunnel Experiments
HPC Impacts Automotive Aerodynamics Computational Fluid Dynamics HPC demands Kevin Golsch Aerodynamics – Energy Center 1 October 2010.
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
2008 PSU Human Powered Vehicle Team Design Team: Ben Bolen Erik Chamberlain Kenneth Lou Levi Patton Bryan Voytilla Advisor: Derek Tretheway Vike Bike Fabrication.
A Sled System for Motor Vehicle Crash Simulation and Forensic Biomechanics Group Members: Joshua Booren Travis Deason Steve Savas Max Brunhart Customer:
2010 H UMAN P OWERED V EHICLE Final Presentation June 4 th, 2010 P ORTLAND S TATE U NIVERSITY Maseeh College of Engineering and Computer Science Mechanical.
Mini-Baja Advisory Presentation April 27, 2007 Quentin Holmes Chris Meyer.
Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.
SAE MINI BAJA PROJECT SAE MINI BAJA PROJECT PORTLAND STATE UNIVERSITY TEAM MEMBERS: MIKE CUNDIFF JAMES GARVIN MIKE KRANDA MICHAEL SINGER CHRIS WALTHERS.
What FSAE is?? It is an organisation that carries out student automotive racing competitions around the world. FSAE racing competitions take place every.
The Greenpower Masterclass How to Engineer a Race Winning Electric Car in the Greenpower Challenge.
John Lisiecki Dynamic Events Chief Steward Ed Arthur Assistant Chief 3/21/2012 © 2012 SAE International 2012.
Team HazardHawk Team HazardHawk 2008 April 24, 2008.
ASME Design Challenge Fall Semester 10/9/14. Challenge Objective: Build a rocket that will fly the highest while carrying an egg up and down safely!
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
University of Arkansas Senior Project- When Pigs Soar.
Vehicle Dynamics Example Problems
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Airbags: for safer cycling Ryan Mott October 22, 2014.
Insight into aerodynamic improvements for the S2 Lotus Exige By Simon Farren Presented at US Distributor Sector th April 2009.
Old dominion university formula sae
HPV Fundraising Project: Dakota Flyer Advisor: Dr. Matejcik Additional Support:Chris Monson Aaron Costello.
Sponsorship Brochure.:: SAE Baja Asia 2010::.. About SAE Baja Asia 2010 The objective of the Baja project is to design and build a single seat off road.
1 Renewable Energy Designs Proposal Presentation December 1, 2003 Renewable Commuter Car
Jason Harris Capstone Design Presentation April 20, 2001.
CoG and Speeding Building SPEED July 28, July-2011 Center of Gravity The Center of Gravity is the point where the object/figure balances Geometry.
2011 Human Powered Vehicle Challenge 'Mjolnir' Team Members: Tad Bamford Ben Higgins Chris Schultz Aaron Stanton Neal Pang.
ME 462 Senior Design Project Design of a moonbuggy for the NASA Great Moonbuggy Race Faculty Advisor: Dr. Ramana Pidaparti Marques Franklin.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Project Background ❖ Project Summary ❖ Use Scenarios ❖ Customer Requirements ❖ Engineering Requirements.
FSAE – Status Update 2 FSAE 2014.
“Role of Aviation in Future Urban Warfare”
Pedibus Team 22 Team Members: Kyle Anderson Stephen Avery Alejandro San Segundo Brett Willenbacher Team No.22 Slide 1 of 15 Alejandro San Segundo Midterm.
School of Mechanical Engineering FACULTY OF ENGINEERING School of Mechanical Engineering FACULTY OF ENGINEERING Aerodynamic Design Optimization Harvey.
Overview General Info Mission Statement PDS TRM Questions.
Axle Temperature Control Product Design Specification Design Team Mike Erwin Emery Frey Boun Sinvongsa Lee Zimmerman PSU Faculty Advisor Dr. Lemmy Meekisho.
NASA’s MOONBUGGY STUDENT COMPETITION On the Grounds of the U.S. Space & Rocket Center Huntsville, Alabama April 8, 2000 Participated by the Senior Design.
2008 PSU Human Powered Vehicle Team Ben Bolen Erik Chamberlain Kenneth Lou Levi Patton Bryan Voytilla Concept Evaluation.
ME 440 Aerospace Engineering Fundamentals Hot Topic of the Week.
Hayate. Hayate Design Innovation Chassis Fairing Three-wheeled “stable” vehicle Rigid space truss frame design Efficient Drivetrain Fairing Extensive.
House of Quality High relationship  Medium relationship  Low Relationship Customer Requirements Customer Importance Target Values.
Speed, Velocity, Acceleration Test #2 How much distance have you run at 18 m/s for 10 seconds? Distance = Speed x Time 18 m/s x 10 s. = 180 m.
AEV PROJECT DESIGN--OSWALD GROUP K –MATTHEW BRODSKY, TROY CROSS, HANK MCNAMARA, SIVAN ZOUELA.
NASA Great Moonbuggy Race 2012 SpacePokes Design Lesley Young Leader Davis FayRecorder Alisa FrohbieterProject Engineer Ryan WilliamsProject Engineer.
WyoBaja 2011 SAE Mini Baja Competition Team Leader Suspension Frame
March 2 nd, 2009 Anthony FerrignoMechanical Engineering James LukerMechanical Engineering Quang TranMechanical Engineering Philip MarinoMechanical Engineering.
Roman Battisti Anthony Garcia Lori Sandberg Liz VanHoosen.
The Greenpower Masterclass How to Engineer a Race Winning Electric Car in the Greenpower Challenge.
INSPIRATION – BLOODHOUND SSC WORLD LAND SPEED ATTEMPT
Leslie Elwood Erik Nelson Jacob East Joe Shields Brandon Bonner
الحد من المشاكل السلوكية في رياض الاطفال
2007 PSU HPV 3RD PLACE ASME WEST COAST COMPETITION
2007 PSU Human Powered Vehicle Team
2007 PSU Human Powered Vehicle Team
VEHICLE TECHNOLOGY BRAKE SYSTEMS.
UNH FSAE Electronics Jeff Cahill.
Human Powered Vehicle (HPV)
Moonbuggy ME Capstone Design Project SP 2006
Human Powered Vehicle (HPV)
Tilting Trike With User-Controlled Stability
Presentation transcript:

2008 PSU Human Powered Vehicle Team Ben Bolen Erik Chamberlain Kenneth Lou Levi Patton Bryan Voytilla Product Design Specification

Project Overview Mission Statement Competition Identification of Customers Product Design Specifications House of Quality Project Timeline

Mission Statement To develop an innovative, light weight, aerodynamic HPV and win the overall ASME Western Region HPV Challenge.

2008 Human Powered Vehicle Challenge West Coast Challenge –University of Nevada Reno –Single Rider –April th History –Portland State University two consecutive 3 rd place finishes Judging Criteria –Design report, oral presentation, Safety –Sprint:400m run up, 100m top speed time trials –Endurance: 65km relay race

Identification of Customers High Priority –2008 PSU HPV Race Team –PSU HPV Team Sponsors Medium Priority –ME 492/3 Advisors –Future HPV Teams Low Priority –PSU MME Department

Product Design Specification REQUIREMENTSCUSTOMERMETRICS & TARGETSMETRICTARGETTARGET BASISVERIFICATION Acceleration PSU-HPV 2008 Race Team Speed MPH in 10 sec > PSU HPV Target Measurement by time trials REQUIREMENTSCUSTOMERMETRICS & TARGETSMETRICTARGETTARGET BASISVERIFICATION Top Speed (flat land) PSU-HPV 2008 Race Team SpeedMPH> Competition's top speed was 46 MPH Measurement by time trials REQUIREMENTSCUSTOMERMETRICS & TARGETSMETRICTARGETTARGET BASISVERIFICATION Crash Recovery PSU-HPV 2008 Race Team Timeseconds< race results, research in other HPV designs Measurement by time trials REQUIREMENTSCUSTOMERMETRICS & TARGETSMETRICTARGETTARGET BASISVERIFICATION Drag 35 MPH PSU-HPV 2008 Race Team Drag CoefficientCd< 0.14 Vike Trike 1&2 Drag Coefficient Wind tunnel / CFD Analysis

House of Quality Engineering Parameters Competition Customer Needs Priority Speed Braking Frame Strength Turning Radius High Speed Stability Low Speed Stability Crash Recovery Rider Change Time Drag Coefficient Optimal Riding Geometry Crash Safety Total HPV Weight Bacchetta Giro 20 TT Recumbent HP-Velotechnik Recumbent PerformanceHigh SafetyHigh CostMedium WeightMedium ErgonomicsLow AestheticsLow Target45+mph<20ftSF 1.5<20ft<5deg<25ft15sec<=60sec<=.14 <25lbs Verificati onMMAMAMMMAAMA

Contact