DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.

Slides:



Advertisements
Similar presentations
TRD-DCS Workshop, Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom.
Advertisements

Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom software Benjamin Schockert.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
TPC electronics meeting, /14 Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Normal text - click to edit FeeServer: (version 0.9.2) ( ) S. Bablok (IFT, University of Bergen)
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
TRD dcs workshop, Heidelberg, Jan 22, TRD Feeserver/controlEngine Kai Schweda, University of Heidelberg R. Bramm, B. Doenigus, T. Dietel, D. Emschermann,
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
ETRAX CRIS architecture and Xilinx FPGA Peter Zumbruch Experiment control systems group GSI (KS/EE)
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
11/01/2006Wilco Vink / Martin van Beuzekom / L. Wiggers L0 ECS Workshop Pile-Up System.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Enrico Fois - LHCb Muon ECS Meeting - Roma Synchronization and alignment requirements.
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
A. KlugeFeb 18, 2015 CRU form factor discussion & HLT FPGA processor part II A.Kluge, Feb 18,
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
CCS Hardware Test and Commissioning Plan
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Trigger system Marián Krivda (University of Birmingham)
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg

Jan. 22, 2007K. Oyama2 Pre-trigger System Overview CLK before after L0L1 L0 p-t T0 (anti-) coincidence BPM dec. (TTCrx) BPM enc. (TTCex) BC+L0+L1 TRD control boxes L0, L1,… + pre-trigger + fast control outside magnet inside magnet V0 TOF CTP pre-trigger + trigger info ACORDE FEB FPGA

Jan. 22, 2007K. Oyama3 Pre-trigger System Detail

Jan. 22, 2007K. Oyama4 What to be Controlled  6 KIP DCS boards (3 for primary and 3 for backup).  8 Wiener LV supplies.

Jan. 22, 2007K. Oyama5 Power Distribution 4 crates 18 ch. (optional) 4 crates 14 ch.  All Wiener PS, same type as for TRD but smaller current.  Special powering up methods (primary and secondary modes) are required  next slide.

Jan. 22, 2007K. Oyama6 Powering Up Methods (Day-I) PS Ch. [V] Purpose Normal Emergency O V0-A ON ON 2 +7 V0-A ON ON I CB-A,T0-A ON ON 2 +7 CB-A,T0-A ON ON O V0-C ON ON 2 +7 V0-C ON ON 3 -7 CB-TOF,CB-C,T0-C (primary) ON OFF 4 +7 CB-TOF,CB-C,T0-C (primary) ON OFF CB-TOF (primary) ON OFF CB-TOF (primary) ON OFF I CB-TOF (backup) OFF ON CB-TOF (backup) OFF ON 3 -7 CB-TOF,CB-C,T0-C (backup) OFF ON 4 +7 CB-TOF,CB-C,T0-C (backup) OFF ON Note: TRD has passive optical merger in the super-module to receive TTC (trigger and clock) via two optical fibers. If both primary and secondary system are turned on for CB-TOF, TRD will lose the TTC signal (well, will receive too many..).

Jan. 22, 2007K. Oyama7 DCS board FPGAs Control through DCS (I)  Use TRD standard infrastructure (IntercomLayer, FeeServer, DIM).  Retrieve configuration data only from Database. Special “tag”? PVSS wingDB command coder InterCom Layer FEE Server (Control Engine) Device Drivers SCSN + JTAG Configuration (cfdat)

Jan. 22, 2007K. Oyama8 Control through DCS (II)  Max 5 out of 6 will be powered up at the same time.  Do not configure primary and secondary system at the same time.  Downloading the configurations (numbers are max. per DCS board).  JTAG FPGA codes … 512k words.  SCSN LE-Discriminators thresholds … 44 words.  SCSN trigger elements delay setup… 44 words.  SCSN (anti-)Coincidence mode setup … 1 words.  TTC B-channel control (TTCrx-reset, sync, & etc)… several words.  Pre-trigger commands for TRD detectors (go to acq., ADC phase fixing, & etc). Synchronization with TRD configuration is necessary … 1 words.  Configuration script is given in “cfdat” structure of TRD.

Jan. 22, 2007K. Oyama9 PVSS Logging  26 temperature sensors are available in all boxes.  Live ratio and number of pre-triggers.  Health condition.

Jan. 22, 2007K. Oyama10 End of Run Procedure  Readout counter values. from words  44 detector counters CB-A/C 88  44 issued counters CB-A/C 88  44 accepted counters CB-A/C 88  12 trigger element counters CB-TOF 24  12 issued counters CB-TOF 24  12 accepted counters CB-TOF 24 NOTE: 44 = 12 T V0. 12 = 1 TRD-alive + 8 physics + 1 CB-TOF + 1 CB-A + 1 CB-C.  Reading out is done by shuttle.  Implementation will be the same as for TRD.

Jan. 22, 2007K. Oyama11 Summary and Plan  Pre-trigger hardware is almost in the final shape however DCS software development just has started.  Pre-trigger system needs control of only LV and Configuration through DCS board using intercom-layer.  Pre-trigger use the same framework as TRD configuration therefore implementation will be straightforward and hopefully quick.  Needs to be finished in half year.