don r. roberts elementary school

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Monroe Elementary Everett, Washington Project of Distinction Award- New Construction Elementary School Dykeman, Inc. 2012Exhibition of School Planning.
Southwest High School Albuquerque, New Mexico High School Design Concept / Projects Under Construction Award Perkins+Will 2008 Exhibition of School Planning.
Austin, Texas 2013 CEFPI Southern Region Conference.
Druid Hills High School
Mountainside Middle School Mead, Washington New Construction Middle/Junior High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
The University of Sacramento Design of New Campus Sacramento, California Design Concept Award Projects in the Design Phase Holabird & Root 2009 Exhibition.
Silver Crest Elementary School HERRIMAN, UTAH Project of Distinction – New Construction Elementary School VCBO Architecture 2010 Exhibition of School Planning.
East Fairhaven Elementary School Fairhaven, MA Elementary School Project of Distinction Submission HMFH Architects, Inc Exhibition of School Planning.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
College of Southern Nevada Instructional Center – City of Las Vegas Fire Station Las Vegas, Nevada Project of Distinction New Construction JMA Architecture.
Rogers High School Spokane, Washington The Lee Brockway Award for Renovations High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
Dr. Don R. Roberts Elementary School Little Rock, Arkansas New Construction Project of Distinction Wittenberg, Delony & Davidson Architects 2011 Exhibition.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
Bulverde Green Elementary School San Antonio, Texas Elementary School Design Concept Pfluger Associates Architects 2008 Exhibition of School Planning and.
Corbin Primary School Corbin, Kentucky New Construction Elementary School Sherman Carter Barnhart 2009 Exhibition of School Planning and Architecture.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture.
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Westwood Elementary School San Diego, California Elementary School Lighthouse Renovation NTD Architecture 2008 Exhibition of School Planning and Architecture.
Atrisco Heritage Academy Albuquerque, New Mexico High School Design Concept / Projects Under Construction Perkins+Will 2009 Exhibition of School Planning.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Hillside Elementary School New Richmond, Wisconsin Elementary School Project of Distinction – New construction ATS&R Planners/Architects/Engineers 2009.
Troup Magnet Academy of Sciences New Haven, Connecticut Newman Architects LLC 2009 Exhibition of School Planning and Architecture.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Bainbridge High School 200 Building Bainbridge Island, Washington High School Project of Distinction/New Construction Mahlum 2009 Exhibition of School.
Osseo Adult Education Center Brooklyn Center, Minnesota Other: Adult Education Project of Distinction – New construction ATS&R Planners/Architects/Engineers.
Eastgate Elementary School Bellevue, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2010 Exhibition of School.
Lansing Community College University Center Lansing, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of School Planning.
Little Cedars Elementary School Snohomish, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2008 Exhibition of School.
Westside Elementary School
Eastern Guilford High School Guilford County, NC New Construction Project of Distinction SFL+A Architects 2009 Exhibition of School Planning and Architecture.
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Advanced Technology Center Blue Ridge Community College New Construction Project of Distinction Moseley Architects 2012 Exhibition of School Planning and.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Marco Antonio Firebaugh High School Lynwood, California High School Project of Distinction - New Construction Projects LPA, Inc Exhibition of School.
West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.
Lawrence High School Lawrence, Massachusetts High School New Construction Project of Distinction Flansburgh Architects 2008 Exhibition of School Planning.
Groton-Dunstable Regional High School Groton, Massachusetts High School Project of Distinction Submission HMFH Architects, Inc Exhibition of School.
Los Angeles County High School for the Arts Los Angeles, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and Architecture.
Roosevelt and Jackson Elementary Schools
Malibu High School/Middle School Modernization and Reconstruction Malibu, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and.
2009 Exhibition of School Planning and Architecture
Fabyan Elementary School
DePauw University Judson and Joyce Green Center for the Performing Arts Greencastle, Indiana New Construction Project of Distinction Institutions of Higher.
Samuel Brighouse Elementary School
Desert Torah Academy Las Vegas, NV Design Concept Entry Projects Under Construction Award TMP Architecture in association with Perlman Design Group 2008.
Quincy High School Quincy, Massachusetts Design Concept Award High School Symmes, Maini & McKee Associates 2010 Exhibition of School Planning and Architecture.
2009 CEFPI Exhibition of School Planning and Architecture Mountain Green Elementary School Mountain Green, Utah Project of Distinction Elementary School.
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
Catherine Kolnaski Elementary School
Atrisco Heritage Academy Albuquerque, New Mexico High School Project of Distinction – new construction Perkins+Will 2010 Exhibition of School Planning.
Eastgate Elementary School Bellevue, Washington Elementary School Design Concept Awards – Projects in the Design Phase NAC|Architecture 2008 Exhibition.
Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s Exhibition of School Planning and Architecture.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
CHURCH HILL MIDDLE SCHOOL New Braunfels, Texas Middle School Lighthouse Award SHW Group 2008 Exhibition of School Planning and Architecture.
Glacier High School Kalispell, Montana High School Project of Distinction (New) CTA Architects Engineers 2008 Exhibition of School Planning and Architecture.
Jackson Community College Information & Technology Center Jackson, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of.
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
2017 Exhibition of School Planning and Architecture
2008 Exhibition of School Planning and Architecture
Silver Lake Regional High School
Glacier View Junior High
Location Category of Entry Award Type
2016 Exhibition of School Planning and Architecture
2019 Exhibition of School Planning and Architecture
2011 Exhibition of School Planning and Architecture
Presentation transcript:

don r. roberts elementary school 2009 Exhibition of School Planning and Architecture don r. roberts elementary school Little Rock, Arkansas New Construction Project of Distinction Wittenberg, Delony & Davidson, Inc.

don r. roberts elementary school

South Elevation – Aerial view Community Environment: Roberts Elementary School is located on a busy intersection of a State Highway, adjacent to local residential and commercial streets. To blend with the environment, the exterior façade is broken down into several elements which provide a smaller feel to the large school.

North East Elevation – Play Yard Community Environment: The zoned playground was planned around an existing grove of trees on the site. Separate street access was designed for Pre-K check-in, elementary student drop-off, bus loading and building service and deliveries. To further accommodate the restrictive 20-acre site, the architects implemented a two-story design solution. The school is designed to be cordoned off for after-school activities and community use, to better enhance the relationship with the surrounding community.

View in to Media Center/Atrium – lower level Learning Environment: Though it serves 895 students from Pre-K to fifth grade, Roberts Elementary is broken into pods, creating smaller "communities of learning" for students. These communities are divided by grade level and are arranged so that all are readily accessible to the media center which is considered the "center of learning." This learning arrangement furthers the Little Rock School District's initiative to create intimate learning opportunities for all students amidst its large student population.

View in to Media Center/Atrium – upper level Learning Environment: Upper grade level communities have the following features: direct access to a science lab and East Technology Lab on the same level, access to a Reading Mezzanine and internal stairway to the media center, and individual stairways to ease congestion and reduce traffic noise. Other features which are readily available to all "communities of learning" include two art classrooms, two music classrooms and a piano keyboarding lab and dedicated physical education space.

Cross-Section/Day Light Strategy Physical Environment – Sustainability was a major priority throughout the planning and design processes for Roberts Elementary. Energy and water use, as well as the use of sustainable materials, were superior concerns of the school district. Natural day-lighting is utilized in the building design through the inclusion of large areas of glass in each classroom and clerestory windows into interior spaces. Solar heat gain is mitigated through the orientation of the windows and sun-shade devices.

South Elevation – Entry Detail Physical Environment –Recycled and local material content was given preference, and light controls were designed to reduce electrical consumption. The resultant school building uses environmentally-friendly practices to further the users' productivity and learning experiences.

North Elevation – Outdoor Classroom/patio Planning Process: The architects met with school representatives and neighborhood residents early in the planning process to get a better understanding of their expectations and concerns. One major request was that Roberts Elementary students not be subjected to the traffic and loud noise of the nearby Arkansas Highway 10. The architects responded by moving the building southward, away from the highway. Other building characteristics that were affected by the extensive planning process include the "L" shape configuration, which turned the building towards the perimeter of the site to cradle the play area from the street, and the retaining of a landscape buffer between the school and an adjacent neighborhood.

Exhibition of School Planning and Architecture 2008 Project Data Submitting Firm : WITTENBERG, DELONY & DAVIDSON, INC Project Role Architect of Record Project Contact Jack F. See, FAIA Title Principal-in-Charge Address 400 W. Capitol, Ste. 1800 City, State or Province, Country Little Rock, AR Phone 501-376-6681 Joint Partner Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Other Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm: NABHOLZ Project Role Contractor Project Contact Mike Armstrong Title Superintendent Address 1500 Aldersgate City, State or Province, Country Little Rock, AR Phone 501-217-5500

Exhibition of School Planning and Architecture 2008 Project Details Project Name  DON R. ROBERTS ELEMENTARY SCHOOL City LITTLE ROCK State ARKANSAS District Name LITTLE ROCK SCHOOL DISTRICT  Supt/President DR. LINDA WATSON /SUPT Occupancy Date AUGUST 2010  Grades Housed PRE K - 5    Capacity(Students) 865  Site Size (acres) 20 ACRES  Gross Area (sq. ft.) 158,380  Per Occupant(pupil) 183  gross/net please indicate Design and Build? If yes, Total Cost: $25,500,000  Includes: construction If no, Site Development: Building Construction: Fixed Equipment: Other: Total: