Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.

Slides:



Advertisements
Similar presentations
On the way to an effective regulatory framework of pipeline safety The WP-6 sectoral initiative on pipeline safety Prepared by Sergey Mokrousov.
Advertisements

Accident Incident Policy Changes to Policy September 2007.
Reliability of the electrical service Business Continuity Management Business Impact Analysis (BIA) Critical ITC Services Minimum Business Continuity Objective.
February 2009 Summary of Chamonix 09 Steve Myers.
Learning from a recent incident
What to Do When an Event Occurs at Jefferson Lab When an unanticipated event occurs, there are a number of steps that need to be taken to assure the injured.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Chapter 1.5 Fire Regulations. Components of a fire Fuel: Something that burns Air: Oxygen to keep the fire going Heat: Gas, electricity, etc.
Workshop on Machine Protection, focusing on Linear Accelerator complexes Summary of Fifth Session – Operational Aspects 1)RF Breakdown recovery 2)CLIC.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
Section Ten: Security Violations and Deviations Note: All classified markings contained within this presentation are for training purposes only.
Eric Prebys/LARP 9/7/2015.  Official information still very limited  Last press release (Sept. 23) refers to “large helium leak”  No pictures.  Logbook.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
The Sector 3-4 incident at the LHC: fault tree and corrective measures Ph. Lebrun Risk Analysis Review Committee CERN, 5 March 2009.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Westminster Kingsway College Professional Chef Diploma Unit 703 S.Greubel.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
LHC Status ReportLHC Status Report Lyn Evans 96 th LHCC meeting, CERN 19 th November 2008.
Lesson 7-Managing Risk. Overview Defining risk. Identifying the risk to an organization. Measuring risk.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Conditioned-Based Maintenance
MICE Target - Risk Lara Howlett University of Sheffield.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
1 LHC and CMS Status Robert M. Harris Fermilab Fermilab All Experimenters Meeting Nov. 10, 2008.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
E. Todesco ENERGY OF THE LHC AFTER LONG SHUTDOWN 1 ( ) C. Lorin, E. Todesco and M. Bajko CERN, Geneva Switzerland With relevant inputs from colleagues.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
P. Sphicas Physics (status and plans) Sep 25, 2008 Physics Coordination Meeting 1 Physics (“status” and “plans”) n Outline u Introduction/reminder of original.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
11T Magnet Test Plan Guram Chlachidze
HEL – Safety aspects Christelle Gaignant
Helium spill in LHC tunnel
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Renovation of the 45-year old PS magnets
HL Consolidation Day Analysis of needs from BE-ICS
Dipole circuit & diode functioning
J.M. Jimenez On behalf of TE-VSC group
Power cut 18kV cable for EMD404/E9 is heating
Machine Protection Xu Hongliang.
Business Continuity Plan
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

Eric Prebys/LARP 2/17/2016

 CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to remove details.  CERN personnel have been threatened with disciplinary action if they violate these policies.  In the interest of allowing our personnel at CERN to continue to work effectively, I am only including information that has already appeared in a CERN press release or reputable news source (mostly the Times Online*), or information that remains in the LHC logbook. * 2/17/2016 Eric Prebys - All Experimenters' Meeting

Incident in LHC sector 34 Geneva, 20 September During commissioning (without beam) of the final LHC sector (sector 34) at high current for operation at 5 TeV, an incident occurred at mid-day on Friday 19 September resulting in a large helium leak into the tunnel. Preliminary investigations indicate that the most likely cause of the problem was a faulty electrical connection between two magnets, which probably melted at high current leading to mechanical failure. CERN ’s strict safety regulations ensured that at no time was there any risk to people. A full investigation is underway, but it is already clear that the sector will have to be warmed up for repairs to take place. This implies a minimum of two months down time for LHC operation. For the same fault, not uncommon in a normally conducting machine, the repair time would be a matter of days. Further details will be made available as soon as they are known. * 2/17/2016 Eric Prebys - All Experimenters' Meeting

 On Friday, Sept. 19, shortly after 11AM CEDT, a massive quench occurred in sector 34 of the LHC, resulting in  All quench heaters firing  Loss of vacuum  Multiple fire and ODH alarms  The working theory is that a quench occurred in a splice between magnets, which evolved into a massive arc flash.  Over the weekend, fire brigade and key technical personnel entered the tunnel, with the goal of reestablishing power and safety systems and to assess the mechanical integrity of the magnets and stands.  The event caused significant motion of magnets and deformation of magnet stands!!!  As of today, power has been restored, Oxygen levels are safe, and most safety systems are back online.  Preparing for more general accesses to plan for repairs.  This event is completely unrelated to the transformer failure which occurred the previous week. 2/17/2016 Eric Prebys - All Experimenters' Meeting

 CERN is a long way from being able to give an accurate time estimate to resume operation.  Two months would be the absolute minimum to warm up, change a magnet, and cool down.  The scale of the damage will clearly extend that time.  There is no word, as yet, as to the systematic repercussions of the event.  eg, will some sort of protection measures be required to prevent this in the future? 2/17/2016 Eric Prebys - All Experimenters' Meeting