Transport Action Ontario Detroit River International Crossing (DRIC): Road Based Infrastructure In the Era of Climate Change.

Slides:



Advertisements
Similar presentations
Michigans Freight System Michigans Freight System MAASTO Committee on Highway Transport October 16, 2012 Larry Karnes Michigan Department of Transportation.
Advertisements

A Multimodal Goods Movement Strategy for Ontario Canada-United States Transportation Border Working Group Fall Plenary November 7 – 8, 2012 James Perttula.
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Briefing for the Transportation Border Working Group November 8,
Underground Railroad Traveling along the Underground Railroad.
Beyond the Border Action Plan Border Infrastructure Investment Plan (BIIP) 1.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Trans. Action Ontario1. 2 Toronto-Detroit Road Trip Quiz Only one entry per person No use of electronic aids Enter travel distance to nearest.
Public Border Operators Association Border Infrastructure Project Updates Canada – United States Transportation Border Working Group Meeting April 19 –
An Opportunity to Build Modern Multi-Modal International Infrastructure Share the Bridge.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Transportation Border Working Group April 24, 2013.
Annette Gibbons, Director General, Surface Transportation Policy, Transport Canada November 2, 2011 Ottawa Update.
Presented by: Detroit International Bridge Company Canadian Transit Company March 27, 2010 Ambassador Bridge U.S plaza of the bridgeCanadian plaza of the.
Transportation Border Working Group Border Infrastructure update Ministère des Transports du Québec October 27 th Québec.
Detroit-Windsor bridge battle: Separating out the truth BY JOHN GALLAGHER AND CHRIS CHRISTOFFJOHN GALLAGHER CHRIS CHRISTOFF
Plaza Shrinks The Times Herald March 24, 2009 By Mike Connell.
Underground Railroad Traveling along the Underground Railroad.
Location Place Movement Human-Environmental Interaction Region The Five Themes.
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
Canada Auto industry Part 2. Historical Maps
Bill Anderson Ontario Research Chair in Cross Border Transportation Policy Director, Cross-Border Institute University of Windsor For Windsor-Essex Chamber.
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
1 Presentation for Border Transportation Partnership Detroit River International Crossing May 31, 2005.
Windsor-Essex Regional Chamber of Commerce University of Windsor Unifor Windsor – May 14,
Card Sort Study MDOT Travel & Traffic Site Jean-sophie Wood.
TBWG Spring 2011 Meeting Minneapolis, Mn EASTERN BORDER TRANSPORTATION COALITION UPDATE.
D E C E M B E R 1 2, D E C E M B E R 1 2, I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F.
IAIA 2007, Seoul, South Korea Detroit River International Crossing Project Navigating the Multi-Jurisdictional Maze for a Large-Scale Transportation Project.
Charlie Zelle, Commissioner Minnesota Department of Transportation February 18, 2014.
Ted Mackay, Director Highway, Border and Motor Carrier Policy Transport Canada April 24, 2013 OTTAWA UPDATE.
U.S. Department of Transportation Federal Highway Administration Transport Transports Canada Canada Transportation Border Working Group New York State.
Brenda O’Brien, P.E. Engineer of Construction Field Services.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
1 Freight Performance Measurement Presented to Transportation Border Working Group on 7 June 2006.
Encouraging Transportation Investment Saginaw County Chamber of Commerce Percolator Breakfast May 2, 2013 Horizons Conference Center Rich Studley, President.
Ottawa Update Transportation Border Working Group Buffalo, New York April 9,
Promoting security, travel, and trade Transportation Border Working Group – April 2008.
Developer Joseph Bower staged ceremonies May 7, 1927, with banker Joseph Austin's 16- year-old daughter, Helen, driving the first boring stake into Detroit.
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador.
Southwestern Ontario Border Wait Time Project Update Mike Barnet, P.Eng Intelligent Transportation Systems Program Ministry of Transportation of Ontario.
Your Name & Hour Directions are listed on each slide Save as Infrastructure Your Name Infrastructure in the USA.
October 27, 2009 – Winnipeg Alicia Nolan, Co-Chair – U.S. Federal Highway Administration Daniel McGregor, Co-Chair – Transport Canada Border Infrastructure.
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
The Border, Canada-US Trade and the Post-9/11 Security Regime with implications for Immigration and Diversity.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100.
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
DRIVE Net: A Large-Scale Online Data Platform for Performance Analysis and Decision Support Yinhai Wang PacTrans STAR Lab University of Washington
Northbound Border Wait Times Validation SR 543 Pacific Highway Port of Entry Transportation Border Working Group Todd Carlson Planning and Engineering.
Southeast Michigan Council of Governments. Livingston Washtenaw Monroe Oakland Wayne Macomb St. Clair SEMCOG Region.
Reviewing What We’ve Learned: chart Human Characteristics  Natural Characteristics Two Peninsulas  Mackinac Bridge Literature Connection: Mackinac Bridge:
Public Border Operators Association Border Infrastructure Project Updates United States – Canada Transportation Border Working Group Meeting April 14,
TRANSPORTATION BORDER WORKING GROUP DATA WORKSHOP June 3, 2008.
TBWG – Ottawa Update Quebec City, October 28, 2010 Ted Mackay, Transport Canada.
US / Canada Border Issues William Cook Senior Manager, Corporate Customs DaimlerChrysler Corporation April 30, 2004.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Detroit River International Crossing Project March 31, 2010.
ITS Session TBWG, Boston, April 13-14, 2010
Cycling infrastructure spending 2017
Project Labor Agreement Quarterly Report
NEW CONNECTION ROAD BETWEEN MOLDOVA AND ROMANIA
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
Rijkswaterstaat Jan van der Zwan 8 juni 2012.
Partnering at our Borders
Time from HQ = 1.0 minutes ATV Hiking Truck HQ start HQ start
Presentation transcript:

Transport Action Ontario Detroit River International Crossing (DRIC): Road Based Infrastructure In the Era of Climate Change

DRIC Cost (per DRIC documents) US portion: $1.8 billion (includes $0.4 billion for US half of bridge) CA portion: $1.6 billion for parkway $0.2 billion for plaza Unstated amount from CA portion of bridge Total cost $4.2 Billion (assuming CA share of bridge cost = US share of bridge cost)

Total DRIC Cost Windsor Star’s Estimate, February 17, 2010: $5.0 Billion

Projected Construction Period 2021 – 2025 for Michigan Department of Transportation from Southeast Michigan Council of Governments website

Annual Traffic Ambassador Bridge, Blue Water Bridge, Detroit Windsor Tunnel YearCrossing Ambassador Bridge Blue Water Bridge Detroit Windsor Tunnel ,348,7625,537,8279,542, ,219,6825,967,1418,549, ,057,4955,678,7027,682, ,382,4585,587,9156,948, ,572,4565,433,5346,535, ,528,1325,561,4615,941, ,295,8245,509,3115,922, ,366,0925,334,7815,397, ,953,0295,038,0454,844, ,338,0154,914,0724,706, ,471,9994,474,5663,948,982

Ambassador Bridge Wait Times March 17, 2010 Traffic Conditions at the Ambassador Traveling To The U.S.A. Auto Conditions: traveling to the USA = less than 10 minutes booths to the USA = 13 booths open, 6 booths closed Truck Conditions: traveling to the USA = less than 10 minutes booths to the USA = 12 booths open, 1 booth closed Traveling To Canada Auto Conditions: traveling to Canada = less than 10 minutes booths to Canada = 3 booths open Truck Conditions: traveling to Canada = less than 10 minutes booths to Canada = 7 booths open Total Booths Closed: to Canada = 19 booths closed From