DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.

Slides:



Advertisements
Similar presentations
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Advertisements

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Dynamic Modelling Requirements for Users David Cashman Grid Code Review Panel 20 th February 2013.
Siemens Power Technologies International
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Wind Turbine Generators
Resource Data Needed For Dynamic Simulations
Carol Chessmore Oncor 2013 DWG Vice Chair 2014 DWG Chair - Pending ROS Approval January 9, 2014 ERCOT ROS Meeting Austin, TX.
ERCOT Staff Facilitator Juan S. Santos Senior Consultant, System Planning Technical Operations WIND GENERATION STABILITY MODELING TASK.
MotoHawk Training Model-Based Design of Embedded Systems.
PSS®E 34.0 Release Webinar 23 April 2015
SIMULINK Dr. Samir Al-Amer. SIMULINK SIMULINK is a power simulation program that comes with MATLAB Used to simulate wide range of dynamical systems To.
Simulink ® From Simulink® 7 Getting Started Guide.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
Importance of advanced simulations of electrical system in wind turbines April 2010.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
SINTEF Energy Research 1 Fault ride-through testing of wind turbines Presented by: Olve Mo Paper co-authors: John Olav Tande Leif Warland Kjell Ljøkelsøy.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
PSS/E Version 33 Dynamic Conversion
Synchrophasor Measurement Implementation in ERCOT
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye University of Illinois at Urbana-Champaign 1 Lecture 23: Renewable.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
Voltage grid support of DFIG wind turbines during grid faults
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
MotoHawk™ Components Scalable, Secure, Model-Based Design of Embedded Systems.
August 30, 2012 Modeling Solar, Storage and Inverter based resources John Adams Resource Integration Planning Working Group.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
New Features in DeltaV SimulatePro
Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512)
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
Shun-Hsien (Fred) Huang ERCOT System Planning ERCOT RPG Meeting September 16, 2011 Preliminary Study Results of the High Frequency Oscillations in the.
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
1 MotoHawk Components Scalable, Secure, Model-Based Design of Embedded Systems MotoHawk Training.
SIMULINK-Tutorial 1 Class ECES-304 Presented by : Shubham Bhat.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning.
Model Validation using PSS®E
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Reliability and Operations Subcommittee Report 2/2/2012.
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
1 Nodal Stabilization Market Call December 27, 2010.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
ECE 576 – Power System Dynamics and Stability
1 Decentralized Adaptive Voltage Control with Distributed Energy Resources Presenter: Huijuan Li.
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Last Comments on Control
Siemens Wind Turbine Weak Grid Option Modeling in PSSE WECC library Hongtao Ma, Siemens Wind Power Joergen Nielsen, Siemens Wind Power Good morning,
Reactive Power Task Force
PSSE Playback Model Validation with PMU Data
Siemens Power Technologies International
Presentation transcript:

DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006

Standard PSS/E Dynamics Model

Standard PSS/E Wind Farm Dynamics Model This page intentionally left blank.

Wind Modeling Background ERCOT contracted PTI to develop wind models in 2002 –In 2003, successfully completed models for all of the wind facilities that were in operation at that time in ERCOT –ERCOT/DWG received the programs and source code for these wind models –Models not added to standard model library in PSS/E

Example of Wind Modeling Complexity IPLAN program –To aggregate wind farm to collector buses, –To dispatch equivalent machines, –To setup reactive power control, –To write out dynamic data to the dynamic input file. Dynamic Simulation Models (programs): –Wind gust and ramp –Aerodynamic conversion –Mechanical Shaft System –Pitch Control –Generator –Generator Control (if applicable) –Power Factor Compensation (if applicable) –Voltage Protection –Frequency Protection Input Data Files –Aerodynamic Cp matrix –Machine parameters Dynamic Models Datasheets and Block Diagrams

Wind Modeling Currently ERCOT/DWG members still use the models developed in 2003 –Some programs are modified to make integration of the wind models into ERCOT cases possible Bus numbering issue Multiple wind facility modeling issue –Only possible because we have the source code

Wind Modeling Moving Forward ERCOT currently lists over 13,000 MW of wind generation being studied Rapidly developing technology –Existing models do not work for some newer wind facilities –Manufacturers wish to protect proprietary information New wind generators providing data to ERCOT/DWG

DWG Concerns New wind generators providing data to ERCOT/DWG –Some are requiring NDA’s from each TSP to use models ERCOT currently signing NDA’s so that they can perform their studies Information should be protected by the standard ERCOT confidentiality requirements –Only providing object code for their wind facility Does not allow ERCOT/DWG to make changes to the model May not work with future versions of PSS/E

DWG Requests ROS Approve the Following Add requirements in DWG Procedural Manual: –Require that the wind modeling data be available for use by all TDSPs –Data requirements include providing Dynamic model source code or, Dynamic model object code which must be updated for PSS/E version changes or as requested by ERCOT or DWG