Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), 18.-19. March 2005 I3 EURONS: a status report to NuPECC March 2005.

Slides:



Advertisements
Similar presentations
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
Advertisements

UNSW Strategic Educational Development Grants
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Training & research for academic newcomers A project of the King Baudouin Foundation © 2013 Gabriella Calderari1.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Institutional Effectiveness Operational Update Presentation made to the Indiana State University Board of Trustees October 5, 2001.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” September 2005.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
FNSSP Presentation Sioux Lookout February 3, 2010.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to NuPECC Alex C. Mueller,
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Contract Negotiations in FP7 The basics Koos de Korte, Agentschap NL, March 2010.
EPOCA – 11. June EPOCAConsortiumOrganisation.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
NCSR “Demokritos” University of Istanbul INRNE, Sofia University of Sofia VINCA, Belgrade PMF, Univ. of Novi Sad IRB, Zagreb NIPNE, Bucharest UPB, Bucharest.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to FINUPHY Alex C. Mueller,
Consortium building PHOENIX Training Course Laulasmaa, Estonia
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
1 An Overview of Process and Procedures for Health IT Collaboration GSA Office of Citizen Services and Communications Intergovernmental Solutions Division.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
EC project periodic and continuous reporting
Project Integration Management
CRE8TIVE KO Meeting, Rome Italy Quality Assurance
I3NS ....or SPIN3 or EURONUS or ???
From a project idea to the kick-off meeting
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Presentation transcript:

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 May/June 2002: Information to the European nuclear structure community by FINUPHY (Frontiers in Nuclear Physics, EU funded project within FP5) FINUPHY Meeting at Trento (28 Oct.2002) First presentation of ideas for JRAs FINUPHY Meeting of the Writing Committee at Mainz (7 Dec.2002) Selection of JRAs, suggestion of fundings for JRAs, TNAs, and Networks FINUPHY Meeting of Writing Committee, Coordinator, and Managing Institution at the occasion of the NuPECC Town Meeting at Darmstadt (31 Jan.2003) Status and follow-ups of former decisions FINUPHY Meeting at Catania (27/28 Feb.2003) Presentation of status, assignment of individual and overall budgets April: submission to the EC, handing in „in person“ „Concerted action“ by A. C. Mueller, C. Scheidenberger, and Jean Vervier (!) End of August 2003: Evaluation Summary Report EURONS - Milestones

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 It was difficult to be on the "pole position" on the reserve list and help and lobbying was needed - NuPECC meeting at Frascati, 5.-6.Dec Initiative by Sydney Galès (joined action by former NuPECC chairs)....and a positive outcome to enter contract negotiations

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Contract negotiations Contained "hidden" additional reduction and the most negative interpretation for EXL and EXOCHAP Negotiated: 48 months to stay in-line with original timing

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 On the cancellation of EXOCHAP May 2004 –action by Muhsin Harakeh and Alex C. Mueller to coordinate EXL and EXOCHAP June/July 2004 –negotiation with EC to increase budget for reasonable execution of EXOCHAP –appeal to EC infrastructure director R.J.Smits (by Walter F. Henning and Alex C. Mueller) September 2004 –impossibility to achieve a reasonable budget for EXOCHAP –cancellation of EXOCHAP

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Start of EURONS November 2004 –Contract signature by EC and managing institution –EURONS starting date: 1. Jan December 2004 –Signature with contractors launched –80% of first 18-months budget received from EC January 2004 –preparation of 1 st PCC meeting February 2004 –PCC meeting at Madeira (7.-8.Feb.), implementation of decisions March 2004 –Money transfer to contractors –Finalization of Consortium Agreement

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Budgets for Access, Networks, and JRAs Networking and integrating activities:1.456 k€ Access to infrastructures:6.590 k€ Joint research activities:6.010 k€ total: k€

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Access facilities within EURONS Louvain Legnaro Darmstadt CERN Groningen GANIL Jyväskylä Trento (ECT*)

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 JRAs - Overview

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Networks - Overview

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 How to manage the consortium? Formally: consortium agreement Practically the following questions should be discussed/answered:  How is the consortium organized?  How can decisions be taken?  What and how will be monitored?  How will results be disseminated? Management Issues

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 How is the consortium organized? Activity Coordinators PCC GA Project Coordinator Project Controlling

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Standard "tools" of Project Management –Tasks –Milestones –Deliverables Implemented in an overall coherent database via the "activity sheets" of each activity, basically one page, to be updated by the activity coodinator every 6 month. What and how will be monitored?

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Task: "Active" contribution to the objectives of the activity Start and end-date (milestone and/or deliverable) Responsible participant / lead contractor A task usually comprises several sub-tasks and participants

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Milestones: Milestones are "landmark" results that are to be achieved during the project and are crucial to the successful continuation of the project and also to reliable periodic progress assessments of the project. For every sub-task there must be at least one milestone (if necessary, there might be more than one).

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Deliverables: Deliverables are expected to be realised from a particular task. Typical deliverables may include reports guidelines protocols technical description of prototypes, etc. The type and dissemination level of a deliverable should be indicated: report, prototype, demonstrator, other confidential, restricted access or public For every task there must be at least one deliverable (there might be more than one if necessary) Lead contractor/responsible participant

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Activity Information Sheet Purpose: Update and "point of reference" at time T=0 Keep track of activities in 6-month intervals: -monitor progress of the work (to some extent) -monitor financial information (dto.) -complemented by cost statements Evaluate and judge the obtained information –is the project on target? –what efforts have been made? Last but not least: –facilitate the work of activity coordinators – review and control work, budget, individual costs, etc.

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Example for monitoring

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 Essence: monitoring and controlling instead of administration, prescriptions, and micro-management

Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 EURONS Summary: EURONS is an I3 (Access + Networking + JRAs) (successor of FINUPHY) The "heart" of EURONS are its worldclass facilities Goals are: –focus on activities that are in general relevant to more than one facility –reach coherence in ongoing developments, pooling and efficient use of resources, –improve existing infrastructures –increase access to infrastructures –foster networking activities –ensure that the European Nuclear Structure Community concentrates on the most prominent Joint Research Activities –preserve and even extend the leading role of Europe in nuclear structure physics –install an efficient project management culture in the nuclear physics community, for future endeavors