1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Advertisements

North American Numbering Council (NANC) Billing & Collection Working Group (B&C WG) June 20, 2013 Co-Chairs: Tim Decker, Verizon Rosemary Emmer, Sprint.
1 ESA Facts Over the past few months, we have reported on the actual and potential loss of schedule contingency (the IEC has reported that their analysis.
TRB BRT Workshop July 22, 2008 ECTP Project Oversight Grantee Perspective.
Acquisition Process Step 1 - Requirements Definition
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
City of Pittsburgh 2015 Budget and Five-Year Plan September 22,
Major Construction Completed
Standardization Working Group Report
TEAM Training: Program Management Last Update: May 2011.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
2011 Draft Budget February 3,  Current 2011 draft budget is $12, 088,673, an increase of $497,449 from the 2010 budget or an increase of 4.29%
Federal Transit Administration New Starts Project Development Process
Construction Roundtable May 4, 2004 Newark, NJ FTA Risk Assessment.
1 Business Continuity and Compliance Working Together Kristy Justice, AVP WaMu Card Services 08/19/2008.
Treatment Optimization in Latin America and the Caribbean: How can the GF contribute?
13. The Stewardship Advisory. It is a quarterly event in which the Stewardship and Finance Committee and the Visitation Committees of all the district.
Environmental Impact Assessment (EIA): Overview
Implications of a contractor Failure. Implications of Contract Failure Costs –Lost Revenue –Poor Service Delivery –Cost and effort of ongoing risk mitigation.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Qantas Brand Refresh Kristy Dixon – Masters of Applied Project Management University of Adelaide 2013 Results of Risk Analysis Plan Hypothetical Project.
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working Vale of Glamorgan Council Final Report- July 2008.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Annual Governance Report North Dorset District Council September 2010 Audit 2009/10.
1 Strategy and Resources Committee - Performance Management Reporting: Quarter 4 Guide to reporting Key Service Priorities 2006/07 Key Service Priorities.
MTA Regional Commuter Rail System. Bringing the LIRR to Grand Central Terminal (GCT) - Route Map.
Let’s Grow RGF Programme Neville Bearpark UNW. The North East’s largest business grant scheme is open for business! Builds on our successful project in.
Budget Update February 27, 2012 Kevin McElroy, Vice Chancellor, Business Services Bernata Slater, Budget Director.
Project Status Report Presenter Name Presentation Date.
September 26, East Side Access Status Report to CPOC September 26, 2011.
1 Department for Work & Pensions Scottish Employability and Skills Conference 18 th September 2013 Jim McGonigle District Manager East and South East Scotland.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
© 2007 Avaya Inc. All rights reserved. Avaya – Proprietary & Confidential. Under NDA Flatten, Consolidate, Extend (FCE) Feasibility and Justification Presenter.
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
December 2, 2008 City of Glendale - Finance Department 1 First Quarter Financial Update December 2, 2008.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
Planning Commission Study Session: Preferred Plan July 23, 2015.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Research Briefing Results of Research Studies: Making the Outsourcing Decision and Optimizing Value from outsourcing March 8, 2007.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Rob Connatser NSS Instrument Work Packages and XLPM.
Stage 2 Light Rail Transit Program “In the ground ready”
Update of Transportation Priorities Plan
Practice and Revision.
Chapter 6 Initiating and Planning Systems Development Projects
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Project Management Lifecycle Phases
Strategy Review Sessions September 11 and 12, 2017
Cost of Service Analysis & Rate Design
Project Proposal Template
Asia-Europe Meeting (ASEM) Asian Financial Crisis Response Trust Fund Review Overview of Progress 6/28/2006.
Construction Roundtable May 4, 2004 Newark, NJ
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Budget Summary Use of General Fund Balance Total Revenues
Two-Dam Independence Project Update
Release 3 Plan Options Decision
Supplemental Independent Review Team - ESA Management Review
Octorara Area School District
What is Project Management?
Central Corridor - Light Rail Transit Metropolitan Council
Cost Containment Working Group Board Update
Second Avenue Subway Project Execution Strategy
Chapter 6 Initiating and Planning Systems Development Projects
Presentation transcript:

1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated the viability of these mitigations with respect to schedule Review was undertaken before the current scope of the Amtrak East River Tunnel work was fully known The IEC is continuing to evaluate the impact of the East River Tunnel work and mitigation strategies as they are prepared by ESA ESA

2 September 26, 2011 IEC previously reported a delay to the Revenue Service Date of September 2016, absent mitigations, due to:  Poor performance of Manhattan contractor  Design approval and construction delays in Harold  Access issues for systems work in new ESA tunnels MTACC proposed four out-of-the-box actions to mitigate delays: 1. Deliver Precast Panels for GCT Caverns through Manhattan 2. Reduction of Operational Readiness Duration 3. Pre-Purchasing of Systems Equipment 4. Delay to B/C Approach Structures ESA

3 September 26, 2011 Findings The mitigations reviewed by the IEC do not bring the Revenue Service Date back to September However, two mitigations offer benefits:  Bringing the precast panels through Manhattan will improve access to the new ESA tunnels by reducing interference risks  Any reduction of the operational readiness results in time savings and will improve a revised Revenue Service Date The costs to the project resulting from these mitigations are yet to be determined ESA

4 September 26, 2011 Additional delays were identified during the review of the proposed out-of-the-box mitigations that will also need to be mitigated during the rebaselining. These delays, which are still under discussion with ESA, include:  Access and construction duration issues for the remaining Harold third party work  Insufficient durations for structural and systems finish-out work in Manhattan caverns ESA

5 September 26, 2011 IEC Recommendations Include Amtrak in rebaselining effort, which considers current delays, unmitigated risks and the East River Tunnel work As part of the rebaselining, advance Westbound Bypass and Eastbound Reroute work to comply with high-speed rail grant requirements Improve the prospect of achieving the goal of a revised FFGA Revenue Service Date by:  Forming a partnership between Amtrak and MTA to create a vehicle to incentivize Amtrak  Strengthening LIRR’s position to lead the coordination in Harold and find a balance between customer service and construction ESA