SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.

Slides:



Advertisements
Similar presentations
Equipotential Grounding Jim McGrail City of Naperville Safety &Training Instructor Engineering & Operations Technical Conference April 13-18,2007.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
MEASUREMENT DEVICES OUTLINE Multimeters Analog Multimeters
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
Establishing an Electrically Safe Work Condition May is Electrical Safety Month Training A product of the EFCOG Electrical Safety Task Group.
STEADY-STATE POWER ANALYSIS
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.
D. Bozzini, AT/MEL/EM, Chamonix Workshop XIV, January Chamonix Workshop XIV Session 4 – Other Issues affecting Beam Commissioning 1 Electrical Quality.
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
Grounding.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Closing session Issues and questions from the audience and some from me Rüdiger Schmidt.
MPE Workshop for LS1 / 22 & 23 Nov  DFB Instrumentation Upgrade  Cabling Issues  R2E Consolidation  Current Lead Insulation Project  DFB Instrumentation.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Ground Bond and Ground Continuity Testing
Considerations from machine protection and the ELQA teams
Some arrangements for personnel safety 1- Procedures for access
TE-MSC-SCD EYETS th September, 2017.
Electrical insulation of magnet circuits in sector 7-8
Powering LHC magnets version 30/3/2007.
ELQA Electrical Quality Assurance
Giorgio on behalf of ELQA team
LHC Hardware Commissionning
Giorgio on behalf of ELQA team
Powering the LHC Magnets
MPE main activities planned for LS2
Status of ELQA equipment and related software
Circuits description and requirements - Closed Session-
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Agenda Contents Different types of documents
Personal Protective Equipment
Low Voltage Hazards Low voltage = Higher than 50V ac, 120Vdc
Computer Repair & Maintenance
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Hardware Commissioning
Circuit Disconnector Boxes Implementation of our safety first policy
Powering and Safety day Underground access during powering tests
Review of hardware commissioning
Presentation transcript:

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA team AT/MEL-EM 18 th October 2007 ELQA Activities

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 2 ELQA during Hardware Commissioning  Tasks –Electrical qualification of each superconducting circuit, including the current leads and the active systems connected to the circuit. –Measurement of electrical parameters of each superconducting circuit in order to define reference values for the initial operation of the power converters and for the machine operation. –Verification of the integrity of the instrumentation used for the protection of the superconducting magnets and current leads.  Objectives –Release each individual superconducting circuit for powering, –Collect all the necessary electrical parameters for operation. –Trace all the data acquired. –Manage the related non conformities. –Apply the highest level of safety for personnel and equipment

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 3 Description of the ELQA tests I  ORC OHMIC RESISTANCE The resistance of a circuit is measured between the two current leads. Maximum current 6 A, maximum voltage 30 V DC.  HVQ HIGH VOLTAGE QUALIFICATION Each circuit is energized individually with respect to ground using a DC voltage source limited to a current of 2 mA during charging. The maximum voltage applied is 1.9 kV DC. See details in LHC-DE-TP-0007 rev 0.1

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 4 Description of the ELQA tests II  TFM TRANSFER FUNCTION OF THE IMPEDANCE This measurement determines the impedance as a function of frequency. The impedance is measured at the level of the current leads by applying a sinusoidal signal with maximum amplitude of 10 V within a frequency range of 0.1 Hz - 10 kHz.  ICC CONTINUITY OF INSTRUMENTATION Verifies that the instrumentation for the current lead protection and the global circuit protection are placed at the right position and are routed to the right connectors and pins. Certifies the absence of broken or disconnected instrumentation wires after the cool-down. A DC current of less than 6 A and maximum 30V is applied.  DPC DIODE POLARITY CHECK Proves that none of the protection diodes in the three main circuits (MB, MQF and MQD) is reversed. A DC current of less than 6 A is put throughout the circuit, the maximum voltage is less of 150 V.

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 5 Scenarios for the ELQA during hardware commissioning

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 6 High voltage qualification HVQ  During this tests, voltages up to 1.9 kV dc are applied between circuits and ground.  The powered circuit (mainly capacitance versus ground) becomes a second generator as soon as it gets energy stored.  The HVQ equipment is connected to the live parts of current leads with specific crocodile connectors IP00. This means that live parts are accessible!  How we proceed to increase the safety level during this test –Complete test of the circuits belonging to a electrical safety subsector is fully automatic. After PC switch off and after the warm cable disconnection, all circuits are temporary grounded on the superconducting side. Here we touch the live parts! All circuits are manually connected to a HVQ rack. The circuits are grounded via this rack. The temporary grounds are manually removed. An automatic application is launched and applies the voltage to a given circuit while the others remain grounded. The discharge is controlled by the system and current to 0 is automatically measured. Selection to the next circuit is done automatically via an internal switching board at 0 current. The circuit previously under test is grounded and the next one is open for voltage application.

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 7 Definition of electrical safety subsector powering subsectors  Circuits sharing the same cryogenic environment, which can accidentally come into contact, shall be considered to belong to the same electrical safety subsector.  Circuits closer than 30 cm from circuits shall be defined as being in neighborhood “voisinage”. (dipole correctors, heater power supply, instrumentation rack and instrumentation systems). Electrical safety subsector

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 8 ELQA activities and related risks I  Electrical –Wide geographical extension of the electrical subsectors over few km (arcs). –Live parts (current leads) are accessible. –Components connected live to a circuit may also be energized (instrumentation cabling, temperature routing, current lead heating systems…). –Most of the test are in the BT regime. –Two tests in the HTA regime. HVQ: 1.9 kV dc are applied to the MB circuit. DPC: up to 150 V dc are applied to the MB circuit.  Working environment –Sometimes delicate accessibility to equipment on top of the DFB’s  VIC

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 9 ELQA activities and related risks II Where: DFB instrumentation rack Protection degree: <IP45 When: During ELQA TP4 Risk: low Action: Do not touch Where: Local dipole orbit correctors Protection degree: IP00 live! When: During ELQA DOC Risk: Extremely high Action 1: Fully automatic HVQ test Action 2: Follow the safety procedure

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 10 ELQA activities and related risks III Where: IFS instrumentation box and QPS Protection degree: <IP45 When: During ELQA TP4 Risk: low Action: Do not touch Where: DFB Current leads Protection degree: IP00 live! When: During ELQA TP4 Risk: Extremely high Action 1: Fully automatic HVQ test Action 2: Follow the safety procedure

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 11 ELQA actors  The requester: Project Engineer (PE) –Responsible for: Organize and plan ELQA activities. Request of intervention to the EIC.  The Operation Engineer (OE) is the “charge de travaux” hab. B2 –Responsible for: Definition of the concerned electrical safety subsectors. Determine the list of power converters and heater power supplies to be consigned and switched off (condamné) and transmit it to the Electrical Circuits Coordinator ECC for execution. Check the correct execution done by AB/PO of the consignation step #1. Collect yellow papers. Verify the safety measures in place for the execution of the intervention. Ensure his own safety and the safety of the intervention team. Inform the Electrical Circuits Coordinator ECC of the intervention completion  The Intervention Team (IT) i.e. “executant electricien” hab. B1 –in charge of: The execution of the work / measurements.

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 12 ELQA actors and other links in matters of safety

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 13 Execution of an intervention  Example on how I see it working (not fully in place yet)

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 14 What else has to be considered  ELQA on an electrical safety subsector requires Task file including the nature of the test (who, when, where, how) transmitted to LHC health & safety inspection team. Global access restrictions under the responsibility of TS/HDO. No co-activities allowed during the HVQ qualification test. For the ELQA-DOC tests: the ELQA team in charge of the qualification takes care of all preparatory work and installation of local restrictions. During the HVQ measurements, where voltages up to 1.9 kV are applied to the circuit, a member of the ELQA team will be placed in the energized and potentially accessible areas.

SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 15 References –Safety policy at CERN (SAPOCO/42), –Electrical code C1, –UTE C , “Carnet de prescriptions de sécurité électrique destine au personnel habilité” –LHC-S-ES “Electrical safety rules for the superconducting circuits in the LHC” EDMS (engineering check) –Definition of the safety sub sectors: –LHC-DE-TP “ELQA Qualification of the superconducting circuits during hardware commissioning” EDMS (engineering check)