Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.

Slides:



Advertisements
Similar presentations
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Advertisements

Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Instrumentation Specifications July 26, 2001 S. Childress Page 1 NuMI Specifications for NuMI Primary Beam Instrumentation.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Beam diagnostics in the beamlines
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
AP2 & Debuncher Acceptance Keith Gollwitzer Dept. of Energy Review February 25, 2004.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
BLM Meeting 10/18/2010 Drennan 1 Booster BLM Upgrade Specification Development September 2010 Craig Drennan.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
IPM Simulations at Fermilab 3-4 March 2016 Randy Thurman-Keup.
Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop
Summary of experience with IPM measurements at BNL-RHIC
Electron Source Configuration
Beam Current Monitoring with ICT and BPM Electronics
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Linac Diagnostics Commissioning Experience
Presentation transcript:

Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010

Beam Diagnostic Systems Beam Position Monitors, BPM Beam Loss Monitors, BLMs Beam Emittance Measurement Beam Current Toroids Beam Intensity Profile Measurement Beam Velocity Measurement Beam Bunch Length Measurement Not Included: Beam Phase 12/7/2010Linac-Booster Beam Diagnostics2

To Be Discussed Brief inventory of the diagnostic systems – Purpose and importance to operations – Current efforts towards improvement – Proposal for other updating or upgrading. Group discussion of these systems – Questions, comments and correction on the presentation – Possible next steps 12/7/2010Linac-Booster Beam Diagnostics3

Preface Almost all have obsolete components The distinction is how critical they are to operations. There are a few areas we hope to increase the reliability and quality of beam delivered by improving the performance and calibration of the beam diagnostics. 12/7/2010Linac-Booster Beam Diagnostics4

My Assessment (A Straw Man) 12/7/2010Linac-Booster Beam Diagnostics5 SystemSignificance to Operation Update / Upgrade Urgency Injection ToroidsDailyImmediate Injection Emittance ProbesDiagnosticImmediate Beam Position MonitorsDailyImmediate Linac ToroidsDailySoon Linac Scanning WiresDiagnosticSoon (attention only) Linac Beam Loss MonitorsDailySoon (attention only) Linac Wire Scanner SoftwareDiagnosticSoon Injection Emittance SoftwareDiagnosticImmediate Linac

My Assessment 12/7/2010Linac-Booster Beam Diagnostics6 SystemSignificance to Operation Update / Upgrade Urgency Momentum Line Multi-WiresDiagnosticImmediate Momentun Line ToriodsDiagnosticImmediate 400 MeV Beam Position MonitorsDailyImmediate 400 MeV Line Multi-WiresDiagnosticSoon (attention only) 400 MeV Line Beam Loss Mon.DailySoon (attention only) Momentum Line SoftwareDiagnosticImmediate 400 MeV Area

My Assessment 12/7/2010Linac-Booster Beam Diagnostics7 SystemSignificance to Operation Update / Upgrade Urgency Booster Beam Position MonitorsDailyImmediate / Soon Booster Beam Loss MonitorsContinuouslyImmediate Injection Single Wire ScannersDiagnosticSoon (attention only) Booster Ion Profile MonitorDiagnosticSoon Injection Linac VelocityContinuouslynone Injection Linac Bunch LengthDailynone Booster

12/7/2010Linac-Booster Beam Diagnostics 8

Linac Beam Position Monitors RF Module: Linac Low Energy, Dwg # EE-60820, R.C. Webber 1987 Linac High Energy, Dwg # ED , J. Arthur 1993 Digitizer and DAQ: 20 MHz Digitizers tied into Linac front-end VME crates 12/7/2010Linac-Booster Beam Diagnostics9

Linac Beam Position Monitors 12/7/2010Linac-Booster Beam Diagnostics10 -Beam position calibration needs improvement. -There is no online calibration for the current Linac BPM RF Modules. -It is important that the new BPM electronics be linear with beam intensity in order for steering programs to work properly. -Desired position resolution of +/- 0.25mm -NTF ‘s calibration needs should be considered in any upgrade.

Linac Beam Position Monitors Linac BPM Electronics Upgrade. – Linac BPM positions Low Energy Linac, 14 High Energy Linac, 68 (20 not used) 400MeV plus 200 MHz Booster Injection, 51 12/7/2010Linac-Booster Beam Diagnostics11 – New electronics are like MTA BPMs. – Prototype installation expected in Spring 2011.

Linac Beam Loss Monitors 62 BLMs using Main Ring style log integrators – All BLM integrators and DAQ are concentrated in racks just South of the Linac Diagnostics room (all but one). – BLM integrators are simply sampled at a fixed time offset from start of beam. – Baseline measurement and subtraction are performed in the VME front end processor. 12/7/2010Linac-Booster Beam Diagnostics12

Long, Total Loss Monitors Total Loss Monitors are ion chambers several meters long. – Currently Linac has to TLM’s at Linac Module 3. One on each side (ACNET=> L:TLMDR, L:TLMDH). 12/7/2010Linac-Booster Beam Diagnostics13

Linac Beam Current Measurements 12/7/2010Linac-Booster Beam Diagnostics14 Photo of one type of toroid and The current NIM electronics.

Linac Beam Current Measurements Linac Toroids and Wall Current Monitors – The proton source uses 35 toroids total. All of the toroid systems have been considered for either partial or complete upgrade. 12/7/2010Linac-Booster Beam Diagnostics15

Linac Beam Current Measurements New toroids, and measurement and calibration electronics are on there way for the new RFQ at the Linac front end and at the momentum dump. 12/7/2010Linac-Booster Beam Diagnostics16 The new toroid procured for Installation near the Momentum Dump.

750 keV Line Emittance Probes Emittance probes are used in the 750 keV transport lines and will be important in bringing up the new RFQ based injector. – The maintenance of the electronics and motor controls must continue. – New analysis and display software applications will be requested. 12/7/2010Linac-Booster Beam Diagnostics17

Linac Wire Scanners 750 keV line has 2 wire scanners Low Energy Linac, 3 High Energy Linac, 16 Dump lines, 12 12/7/2010Linac-Booster Beam Diagnostics18 A new ACNET application could make these wire scanners easier to use. The application would run the wires, collect the data, and compute and display the profile mean and sigma's.

Linac Wire Scanners 12/7/2010Linac-Booster Beam Diagnostics19

12/7/2010Linac-Booster Beam Diagnostics20

400MeV Beam Position Monitors RF Module: Dwg # ED , J. Arthur 1993 Digitizer and DAQ: Omnibyte, 5 MHz, “Comet” VME Beams-doc-3013-v2, S. Lackey 2008 For Description of gating see Beams-doc-3696-v1, C.C. Drennan /8/2010Linac-Booster Beam Diagnostics MeV BPM electronics will be upgraded with the Linac BPM’s.

New Spectrometer Multi-Wires New multi-wires are being engineered for upstream and downstream of the Linac spectrometer. – Upstream: Standard ceramic split multi-wire as used in the MI-8 line. – Downstream: New multi-wire currently being designed 5.5 inch (140 mm) aperture with 98 wires on a 1.45 mm wire spacing (the two end wires are grounded). New software is expected to be written to display 96 wire profiles. Changes to the specification should be voice right away. 12/7/2010Linac-Booster Beam Diagnostics22

400 MeV Line Multi-Wires 12 multi-wire profile monitors in the 400 MeV line are currently supported by the Booster. Electronics – NIM motor controller – NIM multiplexed integrator – CAMAC C192 Multi-Wire Digitizer Just prior to 2008, these wires were used every 2 to 3 months. – There is a special concern for the multi-wire located in the 400 MeV chute (MW4). 12/7/2010Linac-Booster Beam Diagnostics23

400 MeV Line Multi-Wires 12/7/2010Linac-Booster Beam Diagnostics24 Multi-wire electronics currently supported by Booster group.

12/7/2010Linac-Booster Beam Diagnostics25

Booster Beam Position Monitors New Booster BPM detectors were installed recently with the corrector magnet upgrade (J.L. Crisp, Beams-doc-2221-v1; J. Fitzgerald, Beams-doc-3376-v1) Original Heliax cabling from enclosure to gallery 12/7/2010Linac-Booster Beam Diagnostics26

Booster Beam Position Monitors 102 Position Measurements References ======== RF Module: Dwg # EE-37626, R.C. Webber 1986 Digitizer and DAQ: Omnibyte, 2 MHz, “Comet” VME Beams-doc-3013-v2, S. Lackey 2008 Gating and Turn-by-Turn Sampling : DTG Dwg# ED Rev B, 1991 Beams-doc-3696-v1, C.C. Drennan /7/2010Linac-Booster Beam Diagnostics27

Booster Beam Loss Monitors 92 BLMs using modified Main Ring style log integrators – Currently read back with a combination of MADCs and IRM digitizers. – Upgrade to newer Tevatron and Main Injector style VME Integrator Digitizers is in the works. (Beams-doc-3723-v1, C.C. Drennan) 12/7/2010Linac-Booster Beam Diagnostics28

Booster Injection Single Wire Scanners There are 4 single wire scanners on the Booster injection girder. There is 1 single wire scanner known as the “Neutral Beam Scanner” used for studies of the electron stripping foils. (Beams-doc-3642-v1 C.C. Drennan) 12/7/2010Linac-Booster Beam Diagnostics29

Griffin Detector Beam Pickup 12/7/2010Linac-Booster Beam Diagnostics MeV Line Used for Velocity and Bunch Length Measurement

Linac Velocity and Bunch Phase Variation – The RF phase between the signals from each of the two Griffin Detectors is measured to determine relative Linac beam velocity into the Booster. – Linac average velocity is read back by IRM node 61F and used in a Linac regulation loop. 12/7/2010Linac-Booster Beam Diagnostics31 Beam to Debuncher drive showing bunch to bunch phase variation. Linac velocity measurement Horizontal Position at Q4 (400 MeV)

Bunch Width Measurement Booster Injection Bunch Width Measurement 12/7/2010Linac-Booster Beam Diagnostics32

Booster Beam Current, B: CHG0 Beam Current Toroid at period 20 12/7/2010Linac-Booster Beam Diagnostics33

Booster Ion Profile Monitor IPM is a non-destructive profile monitor in the Booster. – Currently needs to have the micro channel plates replaced in both units. This requires breaking vacuum. 12/7/2010Linac-Booster Beam Diagnostics34

35

12/7/2010Linac-Booster Beam Diagnostics36

37

38

39

40

41

Booster IPM Notes Has Horizontal and Vertical Operational Electrostatic collection of Ions with up to 8KV Clearing Field 64 Anode strips spaced at 1.5mm – Approximately 60% copper, 40% space between strips. 30 channels instrumented in each plane (64 total) – with 60db gain amplifier – ~ 300KHz Samples once per turn throughout Booster cycle – ~19900 samples Applications page on B77 Slide copied from Instrumentation-Systems-SDA meeting of February 9, 2010

Booster IPM Notes 2 Needs to be Determined Can use either the 30KV electrostatic units from MI or a new magnetic design specifically for booster. Beam Specs in NOVA Era ~10mm sigma at injection. 400MeV ~4mm sigma at extraction.8GeV ~0.5 e12 particles per batch per turn minimum – In general we can see and make good measurements at 2 turns – (this is the minimum, have run as many as 18 turns) – Typical turns for NuMI and P-Bar Stacking. Can use magnets to contain electrons. (Has been modeled by Alan Hahn and Andreas Jansson and will be updated.) Slide copied from Instrumentation-Systems-SDA meeting of February 9, 2010

Linac Beam Current Measurements Linac Toroids and Wall Current Monitors – The proton source uses 35 toroids. All of the toroid systems have been considered for either partial or complete upgrade. We expect five locations would get a new Pearson CT model V/A. – The electronics would be placed at three different locations along the LINAC. – The toroid system would consist of 1) MVME5500 Processor acting as crate controller. Timing board. 2) Calibration boards with 8 independent analog outputs. 3) Digitizer Down-Converter boards to handle up to 10 toroid signals and calibration signals. 4) VME64X crate Cabling consisting of two 3/8 inch heliax cables per toroid system, one for calibration and one for signal. The crate would display raw data and processed data via ACNET. 12/7/2010Linac-Booster Beam Diagnostics44