RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 111 EFW Flight Software Summary Peter Harvey Space Sciences.

Slides:



Advertisements
Similar presentations
EFW Operational Modes RBSP SWG San Antonio September 2014.
Advertisements

Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept. 2008EFW INST+SOC PDR253 Data Controller Board FPGA Dorothy Gordon UC Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Maintaining and Updating Windows Server Monitoring Windows Server It is important to monitor your Server system to make sure it is running smoothly.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
EFW operations Nordic Cluster Meeting, Uppsala, Aug 2011 Cluster EFW Operations.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
Control & Data Handling, Operator Control, Aircraft Interface to C&DH Steve Musko Space Physics Research Laboratory University of Michigan Ann Arbor, MI.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Flight Software Overview
GoetzPre-PDR Peer Review October 2013 FIELDS TDS FPGA Peer Review Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: #
Module 14 Monitoring and Maintaining Windows Server® 2008 Servers.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Instrument Testing to Date Michael Ludlam for EFW.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
Continuous Global Birkeland Currents from the Active Magnetosphere and Planetary Electrodynamics Response Experiment Brian J Anderson, The Johns Hopkins.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
Solar Probe Plus FIELDS RFS Peter R. Harvey. RFS FSW Requirements.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Science Overview Professor John R. Wygant, PI University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Radiation Belt Storm Probes SRMDR1 Electric Fields and Waves (EFW) John Wygant EFW PI University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 693 EFW Concept of Operations (ConOps) John Bonnell Space.
Solar Probe Plus – FIELDS Main Electronics Package
EFW Instrument Testing to date
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Command & Data Handling
Critical Design Review
University of California - Berkeley
Solar Probe Plus FIELDS
Ground Support Software
Instrument Data Processing Unit (IDPU)
THEMIS INSTRUMENT TRAINING
ACS UC Berkeley Space Sciences Laboratory
THEMIS FM4/FM5 INSTRUMENT SUITE
Acceptance Test Review
Presentation transcript:

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences Laboratory University of California, Berkeley

RBSP/EFW I-PER 21 January 2011Harvey 112 FSW Overview Development Plan : RBSP_EFW_001_SMP Heritage : CRRES, Polar, Cluster, THEMIS Language: Z80 Requirements: 193 Level 3 Effort : SLOC in 22 modules & include files (596 pages) Test Platform: ETU Quality : Integrated with Flight Development Major Functional Requirements: – Command Reception & Distribution – Real-Time Data Collection and Playback – On-Board Evaluation for Burst Triggering – Burst Data Collection and Playback – Sine-Wave Fits of E-Field & Mag Signals – Spacecraft Potential Calculation – Data Compression – Boom Deployment Control – Space Weather Packet – Backup EMFISIS Magnetometer

RBSP/EFW I-PER 21 January 2011Harvey 113 Commands and Telemetry TM: bps - RT: 6763 bps PB: 5237 bps

RBSP/EFW I-PER 21 January 2011Harvey 114 CPU Utilization CPU Performance –Based upon 16.8 MHz processor –Measurements made on RBSP ETU DCB –Calculations in RBSP_EFW_FSW_004_Analyses.xls –Using Worst Case Compressable Data (10:1 compression) –Nominal Spin Rate (12 seconds) for Spin Fits

RBSP/EFW I-PER 21 January 2011Harvey 115 Memory Resources PROM/EEPROM PROM Functions EEPROM Load Uplink Support L&EO Functions EEPROM/Uplink One-Time Events Test Programs Initialization Params Science Upgrades RESOURCE NEEDS 48% PROM 49% RAM 0% EEPROM

RBSP/EFW I-PER 21 January 2011Harvey 116 Computer Resources

RBSP/EFW I-PER 21 January 2011Harvey 117 Action Items/Changes Status of Action Items Since CDR AI-8 : Required Long Duration Stress Test Completed 11/11/2009 Requirements Changes Since CDR EFW-206: Updated default “old data” as 42 days not 17 DFB-21: Added DCB-to-DFB Synchronization message TM-8: Real-time data increased from 6.2 to 6.7 kbps : Playback reduced from 5.7 kbps to 5.2 kbps : Meets “370 samples/sec” requirement w/ compression

RBSP/EFW I-PER 21 January 2011Harvey 118 FSW Action Item Long Duration and Stress Test (I-CDR AI #8) –Include a long duration as well as stress tests of FSW (maybe combined) –Maureen Bartholomew

RBSP/EFW I-PER 21 January 2011Harvey 119 Requirements of Test Test Requirements Length : 72 Hours Activities : High Rate of Commands High Rate of Telemetry Include Event Messages Include Memory Dumps Include CPU intensive Processing Pass/Fail Criteria : No Errors No Memory Leaks

RBSP/EFW I-PER 21 January 2011Harvey 120 Long Duration Stress Test High Rate of Commands –Command Pass Simulation Every Hour –Memory Load – Uplink of Script Database (1KB) –Serial Commands – 32 commands/sec for 60 seconds –Memory Dump Script Database –Execute Script and Verify Results High Rate of Telemetry –Continuous Telemetry at 200% nominal (24 Kbps) –Real Time 200% (12 Kbps) –Burst 200% (12 Kbps) CPU Intensive Processing –Spin Fit 200% (6 second period) –Spacecraft 200% (6 second period) –Burst Triggers (All 6 formulae active w/ 10 terms ea) (200% nominal) –Bias Sweeps every 30 minutes, Highest Frequency Possible –Data Compression Enabled on All Packets –SDRAM and SRAM Memory Scrubbing Enabled Verification –Test Status Logged Every Hour (72 reports) –No Errors in FSW or GSE –No Memory Leaks (by design, there is no dynamic memory allocation)